Garima Sharma
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Garima Sharma has a total of 1 co-authors. Here are the top co-authors by number of shared publications:
- Rajiv Nandan Rai
Subir Chowdhury School of Quality and Reliability, Indian Institute of Technology Kharagpur
1 shared publication
Latest Publications
- 1 February 2021
- Published by Ram Arti Publishers in International Journal of Mathematical, Engineering and Management Sciences
- Vol. 6 (1) , 193-206
Age Based Overhaul Policy for Multiple Repairable Systems with Imperfect Maintenance: Case Study of Aero Engines
Reliability analysis of complex multiple repairable systems (MRS) such as aero engines, rolling stocks and nuclear power plants has always been an area of interest for the research fraternity. An appropriate age based overhaul maintenance policy for such systems can provide impetus to the operations. The paper proposes two different age based maintenance policies; Policy-I and Policy-II, to evaluate the overhaul time of an aero engine, where Policy-I considers MRS with imperfect corrective maintenance (CM), whereas Policy-II examines MRS with both imperfect CM and preventive maintenance (PM). The paper then provides a spare parts estimation model for both the policies. The developed policies and spares parts model are validated by considering field failure data of aero engines as a case and the obtained results are compared with the existing time based maintenance policy used for aero engines. The paper recommends the best policy to be used for MRS in general and the considered case in particular.
- 1 February 2021
- Published by Ram Arti Publishers in International Journal of Mathematical, Engineering and Management Sciences
- Vol. 6 (1) , 193-206
Age Based Overhaul Policy for Multiple Repairable Systems with Imperfect Maintenance: Case Study of Aero Engines
Reliability analysis of complex multiple repairable systems (MRS) such as aero engines, rolling stocks and nuclear power plants has always been an area of interest for the research fraternity. An appropriate age based overhaul maintenance policy for such systems can provide impetus to the operations. The paper proposes two different age based maintenance policies; Policy-I and Policy-II, to evaluate the overhaul time of an aero engine, where Policy-I considers MRS with imperfect corrective maintenance (CM), whereas Policy-II examines MRS with both imperfect CM and preventive maintenance (PM). The paper then provides a spare parts estimation model for both the policies. The developed policies and spares parts model are validated by considering field failure data of aero engines as a case and the obtained results are compared with the existing time based maintenance policy used for aero engines. The paper recommends the best policy to be used for MRS in general and the considered case in particular.