Anas Ma’ruf
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Anas Ma’ruf has a total of 28 co-authors. Here are the top co-authors by number of shared publications:
- Abdul Hakim Halim
Institut Teknologi Bandung
2 shared publications - Mohammad Mi’RAdj Isnaini
Institut Teknologi Bandung
2 shared publications Adi Akbar
Institute Teknologi Bandung
1 shared publicationAli Akbar Ramadani Nasution
1 shared publicationAndi Cakravastia
Faculty of Industrial Technology, Bandung Institute of Technology, Bandung, Indonesia
1 shared publication- Andi Cakravastia
Institut Teknologi Bandung
1 shared publication
Latest Publications
- Open Access
- 8 March 2025
- Published by Universitas Ahmad Dahlan in International Journal of Industrial Optimization
- p. 118-133
Development of genetic algorithm for human-robot collaboration assembly line design
An assembly line requires flexibility due to a shorter product life cycle. A way to increase flexibility is to utilize collaborative robots or cobots. Due to frequent product changes, redesigning an assembly line requires an efficient algorithm. This research aims to develop a genetic algorithm (GA) for solving a human-cobots assembly line design. The setup time of cobots is considered due to the flexibility of conducting multiple tasks by exchanging tools / end-effectors. The main contribution of the research is the efficient GA for solving assembly lines considering setup time. Secondly, the study proposed an upper limit parameter that enables faster computation without sacrificing the quality of the solution. The computational results showed that the algorithm could achieve an optimal solution with the number of tasks less than 35. Experiments of several data prove the proposed GA obtained solutions with an average gap of 3.83% to the optimal solution. Also, a faster computation time with an average difference of 64.66%. The proposed GA obtained a reasonable solution with fast computing time that helps improve efficiency and effectiveness in decision-making related to frequent redesigning of assembly lines.
- 8 March 2025
- Published by Universitas Ahmad Dahlan in International Journal of Industrial Optimization
- p. 118-133
Open AccessDevelopment of genetic algorithm for human-robot collaboration assembly line design
An assembly line requires flexibility due to a shorter product life cycle. A way to increase flexibility is to utilize collaborative robots or cobots. Due to frequent product changes, redesigning an assembly line requires an efficient algorithm. This research aims to develop a genetic algorithm (GA) for solving a human-cobots assembly line design. The setup time of cobots is considered due to the flexibility of conducting multiple tasks by exchanging tools / end-effectors. The main contribution of the research is the efficient GA for solving assembly lines considering setup time. Secondly, the study proposed an upper limit parameter that enables faster computation without sacrificing the quality of the solution. The computational results showed that the algorithm could achieve an optimal solution with the number of tasks less than 35. Experiments of several data prove the proposed GA obtained solutions with an average gap of 3.83% to the optimal solution. Also, a faster computation time with an average difference of 64.66%. The proposed GA obtained a reasonable solution with fast computing time that helps improve efficiency and effectiveness in decision-making related to frequent redesigning of assembly lines.
- Open Access
Enhancing Intermittent Spare Part Demand Forecasting: A Novel Ensemble Approach with Focal Loss and SMOTE
Background: Accurate inventory management of intermittent spare parts requires precise demand forecasting. The sporadic and irregular nature of demand, characterized by long intervals between occurrences, results in a significant data imbalance, where demand events are vastly outnumbered by zero-demand periods. This challenge has been largely overlooked in forecasting research for intermittent spare parts. Methods: The proposed model incorporates the Synthetic Minority Oversampling Technique (SMOTE) to balance the dataset and uses focal loss to enhance the sensitivity of deep learning models to rare demand events. The approach was empirically validated by comparing the model’s Mean Squared Error (MSE) performance and Area Under the Curve (AUC). Results: The ensemble model achieved a 47% reduction in MSE and a 32% increase in AUC, demonstrating substantial improvements in forecasting accuracy. Conclusions: The findings highlight the effectiveness of the proposed method in addressing data imbalance and improving the prediction of intermittent spare part demand, providing a valuable tool for inventory management.
Open AccessEnhancing Intermittent Spare Part Demand Forecasting: A Novel Ensemble Approach with Focal Loss and SMOTE
Background: Accurate inventory management of intermittent spare parts requires precise demand forecasting. The sporadic and irregular nature of demand, characterized by long intervals between occurrences, results in a significant data imbalance, where demand events are vastly outnumbered by zero-demand periods. This challenge has been largely overlooked in forecasting research for intermittent spare parts. Methods: The proposed model incorporates the Synthetic Minority Oversampling Technique (SMOTE) to balance the dataset and uses focal loss to enhance the sensitivity of deep learning models to rare demand events. The approach was empirically validated by comparing the model’s Mean Squared Error (MSE) performance and Area Under the Curve (AUC). Results: The ensemble model achieved a 47% reduction in MSE and a 32% increase in AUC, demonstrating substantial improvements in forecasting accuracy. Conclusions: The findings highlight the effectiveness of the proposed method in addressing data imbalance and improving the prediction of intermittent spare part demand, providing a valuable tool for inventory management.
- Open Access
- 30 November 2024
- Published by Program Studi Teknik Industri, Fakultas Teknologi Industri, Institut Teknologi Bandung in Journal of Research in Industrial Engineering and Management
- Vol. 2 (2) , 30-43
Rubber (Latex) Cutting Process Considering the Cost of the Double Cut Alternative (DCA) Process in Human and Robot Collaboration
Technological developments allow human-robot collaboration resources to be carried out in the rubber (latex) cutting process in plantations. The human-robot collaboration activities are carried out simultaneously in each rubber tree but have different work tasks. Research regarding human-robot collaboration resource costs in the rubber (latex) cutting process activity is still minimal, so it is necessary to discuss and calculate the resource costs of human-robot collaboration by developing mathematical models. Research regarding the resource costs of human-robot collaboration in the rubber (latex) cutting process is still minimal, so discussion and calculations are needed with the development of mathematical models. Mathematical model development is not just a theoretical exercise. The practical goal is to minimize costs by considering human resources, robots, and human-robot collaboration. Through rigorous testing, we aim to minimize the cost of each resource. Test results show that human-robot collaboration resources can significantly influence cost minimization. Cost minimization is accomplished by programming an algorithm in optimization software. This program is used to make it easier to complete the optimal solution in terms of relatively fast time, which refers to the precedence diagram of the rubber (latex) cutting process.Based on the results of experimental data, the development of a mathematical model functions logically to solve resource placement problems, resulting in a minimum cost of IDR 1,618,234,564,595, total human resources of 1 person and robot resources of 1 unit.
- 30 November 2024
- Published by Program Studi Teknik Industri, Fakultas Teknologi Industri, Institut Teknologi Bandung in Journal of Research in Industrial Engineering and Management
- Vol. 2 (2) , 30-43
Open AccessRubber (Latex) Cutting Process Considering the Cost of the Double Cut Alternative (DCA) Process in Human and Robot Collaboration
Technological developments allow human-robot collaboration resources to be carried out in the rubber (latex) cutting process in plantations. The human-robot collaboration activities are carried out simultaneously in each rubber tree but have different work tasks. Research regarding human-robot collaboration resource costs in the rubber (latex) cutting process activity is still minimal, so it is necessary to discuss and calculate the resource costs of human-robot collaboration by developing mathematical models. Research regarding the resource costs of human-robot collaboration in the rubber (latex) cutting process is still minimal, so discussion and calculations are needed with the development of mathematical models. Mathematical model development is not just a theoretical exercise. The practical goal is to minimize costs by considering human resources, robots, and human-robot collaboration. Through rigorous testing, we aim to minimize the cost of each resource. Test results show that human-robot collaboration resources can significantly influence cost minimization. Cost minimization is accomplished by programming an algorithm in optimization software. This program is used to make it easier to complete the optimal solution in terms of relatively fast time, which refers to the precedence diagram of the rubber (latex) cutting process.Based on the results of experimental data, the development of a mathematical model functions logically to solve resource placement problems, resulting in a minimum cost of IDR 1,618,234,564,595, total human resources of 1 person and robot resources of 1 unit.
- Open Access
- 2 August 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 12, 107516-107528
A Mathematical Model and Ant Colony Algorithm for Assembly Line Balancing Problem With Human-Robot Collaboration and Alternative Subgraphs
In recent years, the use of collaborative robots in assembly lines has promised productivity improvement. It provides more alternatives for the assembly line design, which are the alternative resources of the human, robot, or human-robot collaboration (HRC), and the alternative subsets of processes, termed alternative subgraphs, taking advantage of the variety of robotic tools or end-effectors. However, more alternatives make the assembly line balancing problem more complex. This situation is encountered frequently in modern electronics and automotive assembly lines. The contribution of this study is to provide a mathematical model and solution to the assembly line balancing problem that has both HRC and alternative subgraphs, which has not been discussed as an integrated problem in previous literature. To accomplish this optimization problem, a mixed-integer linear programming (MILP) model has been developed to assign tasks to stations and determine the type of resources required while minimizing the cycle time. Practical constraints such as the available number of robots and robotic end-effector types are also considered. Owing to the complexity of the problem, the exact method for MILP is extremely time-consuming for real-world applications. Therefore, a metaheuristic algorithm based on the ant colony optimization (ACO) approach has been developed to solve the problem more efficiently. The results show that the MILP model can obtain optimal solutions for small-sized problems, whereas the ACO algorithm has proven to be a practical solution for medium- to large-sized problems, providing good solutions within an acceptable computation time. The results also show that the presence of alternative subgraphs can give opportunities for better solutions.
- 2 August 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 12, 107516-107528
Open AccessA Mathematical Model and Ant Colony Algorithm for Assembly Line Balancing Problem With Human-Robot Collaboration and Alternative Subgraphs
In recent years, the use of collaborative robots in assembly lines has promised productivity improvement. It provides more alternatives for the assembly line design, which are the alternative resources of the human, robot, or human-robot collaboration (HRC), and the alternative subsets of processes, termed alternative subgraphs, taking advantage of the variety of robotic tools or end-effectors. However, more alternatives make the assembly line balancing problem more complex. This situation is encountered frequently in modern electronics and automotive assembly lines. The contribution of this study is to provide a mathematical model and solution to the assembly line balancing problem that has both HRC and alternative subgraphs, which has not been discussed as an integrated problem in previous literature. To accomplish this optimization problem, a mixed-integer linear programming (MILP) model has been developed to assign tasks to stations and determine the type of resources required while minimizing the cycle time. Practical constraints such as the available number of robots and robotic end-effector types are also considered. Owing to the complexity of the problem, the exact method for MILP is extremely time-consuming for real-world applications. Therefore, a metaheuristic algorithm based on the ant colony optimization (ACO) approach has been developed to solve the problem more efficiently. The results show that the MILP model can obtain optimal solutions for small-sized problems, whereas the ACO algorithm has proven to be a practical solution for medium- to large-sized problems, providing good solutions within an acceptable computation time. The results also show that the presence of alternative subgraphs can give opportunities for better solutions.
- 10 July 2024
- Published by International Journal of Technology in International Journal of Technology
- Vol. 15 (4) , 1037-1047
Machine Learning Approach for Early Assembly Design Cost Estimation: A Case from Make-to-Order Manufacturing Industry
Estimating production costs is a challenging process for the Make-To-Order (MTO) industry because of the product varieties, which leads to inaccurate cost estimation. The product engineering process requires accurate assembly cost estimation to take strategic decisions, specifically during the early design phase. Therefore, an intelligent machine learning-based approach, namely Multi-linear Regression, Random Forest, and Gradient Boosting, is proposed to estimate the assembly design cost. This estimation is done by identifying the assembly features of the 3D CAD model. The validation results showed that mate and assembly features, as well as the number of parts, are effective cost drives, while Random Forest outperformed other models. The proposed methodology is then implemented in a cost estimation program and applied in the MTO industry. The proposed estimation method deviated an average of 17.4% from the actual assembly design cost, considered acceptable during the early design phase. In conclusion, the proposed model and cost estimation program efficiently help the MTO industry predict assembly design costs.
- 10 July 2024
- Published by International Journal of Technology in International Journal of Technology
- Vol. 15 (4) , 1037-1047
Machine Learning Approach for Early Assembly Design Cost Estimation: A Case from Make-to-Order Manufacturing Industry
Estimating production costs is a challenging process for the Make-To-Order (MTO) industry because of the product varieties, which leads to inaccurate cost estimation. The product engineering process requires accurate assembly cost estimation to take strategic decisions, specifically during the early design phase. Therefore, an intelligent machine learning-based approach, namely Multi-linear Regression, Random Forest, and Gradient Boosting, is proposed to estimate the assembly design cost. This estimation is done by identifying the assembly features of the 3D CAD model. The validation results showed that mate and assembly features, as well as the number of parts, are effective cost drives, while Random Forest outperformed other models. The proposed methodology is then implemented in a cost estimation program and applied in the MTO industry. The proposed estimation method deviated an average of 17.4% from the actual assembly design cost, considered acceptable during the early design phase. In conclusion, the proposed model and cost estimation program efficiently help the MTO industry predict assembly design costs.
- 1 June 2024
- Published by Ital Publication in Emerging Science Journal
- Vol. 8 (3) , 1167-1183
Product Design Cost Estimation for Make-to-Order Industry: A Machine Learning Approach
This research addresses the need for accurate design cost estimation in the Make-To-Order (MTO) industry. The complexity of product customization is key to differentiation. While many studies focus on manufacturing cost estimation, few explore design cost estimation. To improve the accuracy of design cost estimation, this research proposes a new cost driver based on design features available in Computer-Aided Design (CAD) data. The design feature is analyzed to the actual industry cost using machine learning methods, including Artificial Neural Networks (ANNs) and Support Vector Regression (SVR). The cost drivers identified as significant consisted of twenty-six 3D CAD features and four 2D CAD features. The results showed that the ANN models outperformed the SVR models in correctly estimating product design costs, as evidenced by the high R2values in the training and testing phases. The proposed method allows early identification of cost drivers, a significant advantage at the order initiation stage when detailed design features are often ambiguous. The novelty of this research is the use of 3D CAD technology for cost estimation, which quantifies costs based on product design complexity, providing valuable insights into the impact of design adjustments on costs early in the design process. Doi: 10.28991/ESJ-2024-08-03-022 Full Text: PDF
- 1 June 2024
- Published by Ital Publication in Emerging Science Journal
- Vol. 8 (3) , 1167-1183
Product Design Cost Estimation for Make-to-Order Industry: A Machine Learning Approach
This research addresses the need for accurate design cost estimation in the Make-To-Order (MTO) industry. The complexity of product customization is key to differentiation. While many studies focus on manufacturing cost estimation, few explore design cost estimation. To improve the accuracy of design cost estimation, this research proposes a new cost driver based on design features available in Computer-Aided Design (CAD) data. The design feature is analyzed to the actual industry cost using machine learning methods, including Artificial Neural Networks (ANNs) and Support Vector Regression (SVR). The cost drivers identified as significant consisted of twenty-six 3D CAD features and four 2D CAD features. The results showed that the ANN models outperformed the SVR models in correctly estimating product design costs, as evidenced by the high R2values in the training and testing phases. The proposed method allows early identification of cost drivers, a significant advantage at the order initiation stage when detailed design features are often ambiguous. The novelty of this research is the use of 3D CAD technology for cost estimation, which quantifies costs based on product design complexity, providing valuable insights into the impact of design adjustments on costs early in the design process. Doi: 10.28991/ESJ-2024-08-03-022 Full Text: PDF
- Open Access
- 13 May 2024
- Published by Omnia Publisher SL in Journal of Industrial Engineering and Management
- Vol. 17 (2) , 542-561
A flow shop batch scheduling model with pre-processing and time-changing effects to minimize total actual flow time
Purpose: This paper investigates a batch scheduling problem where pre-processing is required for parts before processing, considering time-changing effects from part deterioration and operator learning-forgetting.Design/methodology/approach: A mathematical model was developed with the decision variables of the number of batches, the number of pre-processings, batch sizes, and the schedule of processes and pre-processings to minimize total actual flow time. Different numbers of batches were gradually tried and increased until the objective function stopped improving. The minimum number of pre-processings that resulted in a feasible solution was examined at each number of batches.Findings: Our experiment showed that: (1) A faster operator learning led to a lower optimal number of batches and a lower total actual flow time, (2) A faster part deterioration brought a higher number of batches and a higher total actual flow time, (3) The model minimized the number of pre-processings by only scheduling pre-processings before the operations at machine 1, and (4) The model divided the parts into small batches to prevent increased processing time due to part deterioration.Research limitations: The research did not consider multi-due date and multi-item system which require pre-processings with different times and capacities.Practical implications: Production managers should assign fast learning operators to shorter batches and faster deteriorating parts.Originality/value: This research was the first to consider pre-processing in batch scheduling.
- 13 May 2024
- Published by Omnia Publisher SL in Journal of Industrial Engineering and Management
- Vol. 17 (2) , 542-561
Open AccessA flow shop batch scheduling model with pre-processing and time-changing effects to minimize total actual flow time
Purpose: This paper investigates a batch scheduling problem where pre-processing is required for parts before processing, considering time-changing effects from part deterioration and operator learning-forgetting.Design/methodology/approach: A mathematical model was developed with the decision variables of the number of batches, the number of pre-processings, batch sizes, and the schedule of processes and pre-processings to minimize total actual flow time. Different numbers of batches were gradually tried and increased until the objective function stopped improving. The minimum number of pre-processings that resulted in a feasible solution was examined at each number of batches.Findings: Our experiment showed that: (1) A faster operator learning led to a lower optimal number of batches and a lower total actual flow time, (2) A faster part deterioration brought a higher number of batches and a higher total actual flow time, (3) The model minimized the number of pre-processings by only scheduling pre-processings before the operations at machine 1, and (4) The model divided the parts into small batches to prevent increased processing time due to part deterioration.Research limitations: The research did not consider multi-due date and multi-item system which require pre-processings with different times and capacities.Practical implications: Production managers should assign fast learning operators to shorter batches and faster deteriorating parts.Originality/value: This research was the first to consider pre-processing in batch scheduling.
- 21 September 2023
- Published by Springer Nature
- p. 195-204
Multi-skilled Operator Assignment Model for Long Cycle Time and Low-Volume Assembly Line: A Case Study of Aircraft Assembly Line
- 21 September 2023
- Published by Springer Nature
- p. 195-204
Multi-skilled Operator Assignment Model for Long Cycle Time and Low-Volume Assembly Line: A Case Study of Aircraft Assembly Line
- Open Access
- 7 April 2023
- Published by IEOM Society International
- Vol. 12 (7) , 2339-2348
Development of a Cost-Effective Cyber-Physical Production System for the Make-to-Order Industry
This paper identifies the necessity of a Cyber-Physical Production System development for the Make-to-Order industry. The uniqueness of the Make-to-Order industry is that orders are low in production volume but wide in product variety. Thus, accurate and real-time data acquisition of the production activity is necessary to support decision-making to respond to customer orders and monitor production activities. The proposed Cyber-Physical Production System utilizes RFID and current sensors to identify the parts and machine activities. The Cyber-Physical Production System is proven cost-effective to the alternative controller-based Cyber-Physical Production System. Initial implementation has proven a viable solution and provides benefits to support decision-making in the Make-to-Order industry.
- 7 April 2023
- Published by IEOM Society International
- Vol. 12 (7) , 2339-2348
Open AccessDevelopment of a Cost-Effective Cyber-Physical Production System for the Make-to-Order Industry
This paper identifies the necessity of a Cyber-Physical Production System development for the Make-to-Order industry. The uniqueness of the Make-to-Order industry is that orders are low in production volume but wide in product variety. Thus, accurate and real-time data acquisition of the production activity is necessary to support decision-making to respond to customer orders and monitor production activities. The proposed Cyber-Physical Production System utilizes RFID and current sensors to identify the parts and machine activities. The Cyber-Physical Production System is proven cost-effective to the alternative controller-based Cyber-Physical Production System. Initial implementation has proven a viable solution and provides benefits to support decision-making in the Make-to-Order industry.