Shangwen Li
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Shangwen Li has a total of 7 co-authors. Here are the top co-authors by number of shared publications:
- Anqi He
School of Railway Locomotive and Vehicle, Wuhan Railway Vocational College of Technology, Wuhan 430205, China
2 shared publications - Jiawei Hu
Central China Branch of State Grid Corporation of China, Wuhan 430072, China
1 shared publication - Jijing Cao
Wuhan EMU Depot of China Railway Wuhan Group Co., Ltd., Wuhan 430061, China
1 shared publication - Lianlian Gong
College of Railway Locomotive and Rolling Stock, Wuhan Railway Vocational College of Technology, Wuhan 430205, China
1 shared publication - Mingming Yang
College of Railway Locomotive and Rolling Stock, Wuhan Railway Vocational College of Technology, Wuhan 430205, China
1 shared publication - Qian Xu
School of Electrical and Electronic Engineering, North China Electric Power University, Beijing 102206, China
1 shared publication
Latest Publications
- Open Access
A Non-Pilot Accelerated Distance Protection Scheme Based on RCBO for SLG Faults on IBR-Connected Transmission Lines
High-resistance single-line-to-ground (SLG) faults on inverter-based resource (IBR)-connected transmission lines can cause severe underreach of distance protection because the limited and control-dependent IBR fault current increases the influence of fault resistance on the measured apparent impedance. Consequently, the local Zone-II element may fail to pick up, preventing conventional pickup-dependent acceleration from being initiated. This paper proposes a non-pilot accelerated distance protection scheme for SLG faults that requires neither interstation communication nor local Zone-II pickup. Following remote single-pole opening, the fault-sequence current is reconstructed from the open-pole condition using a segmented nominal-π line model that accounts for line charging. Combining the negative- and zero-sequence boundary equations yields a fault-location residual without an explicit fault-resistance term. The required remote-system source impedance is updated from locally stored prefault phasors, subject to numerical and physical validity checks. Candidate open-pole residuals, a fault-location stability criterion, and a boundary safety margin supervise the acceleration decision. Across 540 PSCAD/EMTDC fault scenarios covering six system configurations, the maximum fault-location error was 1.98%; all 270 tested internal faults within the prescribed acceleration range were successfully accelerated, and all 270 external faults were correctly blocked. The mean post-RCBO trip-decision times ranged from 37 to 45 ms across the six configurations.
Open AccessA Non-Pilot Accelerated Distance Protection Scheme Based on RCBO for SLG Faults on IBR-Connected Transmission Lines
High-resistance single-line-to-ground (SLG) faults on inverter-based resource (IBR)-connected transmission lines can cause severe underreach of distance protection because the limited and control-dependent IBR fault current increases the influence of fault resistance on the measured apparent impedance. Consequently, the local Zone-II element may fail to pick up, preventing conventional pickup-dependent acceleration from being initiated. This paper proposes a non-pilot accelerated distance protection scheme for SLG faults that requires neither interstation communication nor local Zone-II pickup. Following remote single-pole opening, the fault-sequence current is reconstructed from the open-pole condition using a segmented nominal-π line model that accounts for line charging. Combining the negative- and zero-sequence boundary equations yields a fault-location residual without an explicit fault-resistance term. The required remote-system source impedance is updated from locally stored prefault phasors, subject to numerical and physical validity checks. Candidate open-pole residuals, a fault-location stability criterion, and a boundary safety margin supervise the acceleration decision. Across 540 PSCAD/EMTDC fault scenarios covering six system configurations, the maximum fault-location error was 1.98%; all 270 tested internal faults within the prescribed acceleration range were successfully accelerated, and all 270 external faults were correctly blocked. The mean post-RCBO trip-decision times ranged from 37 to 45 ms across the six configurations.
- Open Access
Identifying Weak Transmission Lines in Power Systems with Intermittent Energy Resources and DC Integration
Nowadays, intermittent energy resources, such as wind turbines, and direct current (DC) transmission have been extensively integrated into power systems. This paper proposes an identifying method for weak lines of novel power systems with intermittent energy resources and DC lines integration, which aims to provide decision making for control strategies of novel power systems and prevent system blackouts. First, from the perspective of power system safety and stability, a series of risk indicators for the risk assessment of vulnerable lines is proposed. Then, lines in the system are tripped one by one. The calculation method for the proposed risk indicators is introduced. The impact of each line outage on system safety and stability can be fairly evaluated by these proposed risk indicators. On this basis, each risk assessment indicator is weighted to obtain a comprehensive risk assessment indicator, and then the risk caused by each line outage on the system can be quantified efficiently. Finally, the test system of a modified IEEE-39 bus system with wind farms and DC lines integration is used to verify the applicability of the proposed method, and the effectiveness of the proposed method is also demonstrated by comparing with existing methods.
Open AccessIdentifying Weak Transmission Lines in Power Systems with Intermittent Energy Resources and DC Integration
Nowadays, intermittent energy resources, such as wind turbines, and direct current (DC) transmission have been extensively integrated into power systems. This paper proposes an identifying method for weak lines of novel power systems with intermittent energy resources and DC lines integration, which aims to provide decision making for control strategies of novel power systems and prevent system blackouts. First, from the perspective of power system safety and stability, a series of risk indicators for the risk assessment of vulnerable lines is proposed. Then, lines in the system are tripped one by one. The calculation method for the proposed risk indicators is introduced. The impact of each line outage on system safety and stability can be fairly evaluated by these proposed risk indicators. On this basis, each risk assessment indicator is weighted to obtain a comprehensive risk assessment indicator, and then the risk caused by each line outage on the system can be quantified efficiently. Finally, the test system of a modified IEEE-39 bus system with wind farms and DC lines integration is used to verify the applicability of the proposed method, and the effectiveness of the proposed method is also demonstrated by comparing with existing methods.