Miloš Živanović
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Miloš Živanović has a total of 20 co-authors. Here are the top co-authors by number of shared publications:
- Jelena Stefanović
Mining and Metallurgy Institute Bor Alberta Ajnštajna 1 19210 Bor Serbia
15 shared publications - Nikola Jovanović
Mining and Metallurgy Institute Bor Alberta Ajnštajna 1 19210 Bor Serbia
12 shared publications - Nikola Miljković
Mining and Metallurgy Institute Bor Alberta Ajnštajna 1 19210 Bor Serbia
11 shared publications - Jelena Đorđević
Mining and Metallurgy Institute Bor Alberta Ajnštajna 1 19210 Bor Serbia
8 shared publications - Zlatko Pavlović
Mining and Metallurgy Institute Bor Alberta Ajnštajna 1 19210 Bor Serbia
6 shared publications - Ivan Stojičić
Mining and Metallurgy Institute Bor Alberta Ajnštajna 1 19210 Bor Serbia
5 shared publications
Latest Publications
- Open Access
- 1 January 2026
- Published by Centre for Evaluation in Education and Science (CEON/CEES)
- No. Related fi,p. 459-464
Second-generation Eurocode 4: Changes in EN 1994-1-1:2026 and design implications
The second generation of Eurocode 4 was published in 2026 after systematic review and technical development under Mandate M/515. This paper provides a standards-based comparison of EN 1994-1-1:2004 and EN 1994-1-1:2026, focusing on document structure, material scope, composite-beam design, shear connection, composite slabs, and construction systems newly covered by annexes. The revised document introduces strain-limited design, connector ductility categories, refined partial shear-connection rules, harmonized test procedures, and provisions for Web openings, shallow floors, modern profiled sheeting, and precast slabs. Practical benefits, additional verification demands, and transition issues are discussed.
- 1 January 2026
- Published by Centre for Evaluation in Education and Science (CEON/CEES)
- No. Related fi,p. 459-464
Open AccessSecond-generation Eurocode 4: Changes in EN 1994-1-1:2026 and design implications
The second generation of Eurocode 4 was published in 2026 after systematic review and technical development under Mandate M/515. This paper provides a standards-based comparison of EN 1994-1-1:2004 and EN 1994-1-1:2026, focusing on document structure, material scope, composite-beam design, shear connection, composite slabs, and construction systems newly covered by annexes. The revised document introduces strain-limited design, connector ductility categories, refined partial shear-connection rules, harmonized test procedures, and provisions for Web openings, shallow floors, modern profiled sheeting, and precast slabs. Practical benefits, additional verification demands, and transition issues are discussed.
- Open Access
- 1 January 2026
- Published by Centre for Evaluation in Education and Science (CEON/CEES)
- No. Related fi,p. 453-458
Second-generation Eurocode 2: Structural reorganisation, new design models and practical implications
The second generation of Eurocode 2 was published as EN 1992-1-1:2023 after systematic review and technical development under Mandate M/515. This paper provides a standards-based overview of the transition from EN 1992-1-1:2004, focusing on document structure, sustainability, durability, shear and punching, serviceability and reinforcement detailing. The revised document integrates rules for buildings, bridges and civil-engineering structures, permits later concrete-strength reference ages, introduces exposure resistance classes and uses more physically based resistance models. The benefits, additional information demands and implementation issues are discussed without reproducing detailed design formulae or project-specific calculations.
- 1 January 2026
- Published by Centre for Evaluation in Education and Science (CEON/CEES)
- No. Related fi,p. 453-458
Open AccessSecond-generation Eurocode 2: Structural reorganisation, new design models and practical implications
The second generation of Eurocode 2 was published as EN 1992-1-1:2023 after systematic review and technical development under Mandate M/515. This paper provides a standards-based overview of the transition from EN 1992-1-1:2004, focusing on document structure, sustainability, durability, shear and punching, serviceability and reinforcement detailing. The revised document integrates rules for buildings, bridges and civil-engineering structures, permits later concrete-strength reference ages, introduces exposure resistance classes and uses more physically based resistance models. The benefits, additional information demands and implementation issues are discussed without reproducing detailed design formulae or project-specific calculations.
- Open Access
- 1 January 2026
- Published by Centre for Evaluation in Education and Science (CEON/CEES)
- No. Related fi,p. 449-452
Key challenges in planning and managing investment projects in the mining sector
Investment projects in the mining sector are complex due to high capital requirements, technical uncertainty, operational constraints and strict environmental and safety requirements. This paper analyzes the key challenges that influence the planning and management of mining investment projects, with special attention to scope definition, multidisciplinary coordination, equipment procurement, production downtime, cost control and regulatory compliance. The paper emphasizes the need for an integrated project management approach that connects technical planning, resource coordination, risk management and continuous monitoring in order to improve project performance and support successful implementation in mining organizations.
- 1 January 2026
- Published by Centre for Evaluation in Education and Science (CEON/CEES)
- No. Related fi,p. 449-452
Open AccessKey challenges in planning and managing investment projects in the mining sector
Investment projects in the mining sector are complex due to high capital requirements, technical uncertainty, operational constraints and strict environmental and safety requirements. This paper analyzes the key challenges that influence the planning and management of mining investment projects, with special attention to scope definition, multidisciplinary coordination, equipment procurement, production downtime, cost control and regulatory compliance. The paper emphasizes the need for an integrated project management approach that connects technical planning, resource coordination, risk management and continuous monitoring in order to improve project performance and support successful implementation in mining organizations.
- Open Access
- 1 January 2025
- Published by Centre for Evaluation in Education and Science (CEON/CEES) in Mining and Metallurgy Engineering Bor
- No. 2,p. 1-10
Technological and structural design of a conveyor underpass for the combined coal transport system from the roof exploitation zone of the Gacko-Central Field open pit mine
This paper presents the technological and structural design solution of a tunnel-shaped underpass constructed for the coal conveyor belt of a combined transport system, serving the Roof Exploitation Zone of the Gacko - Central Field open-pit coal mine. The underpass has a clear opening of 6.1 meters in width and 2.5 meters in height and is positioned at an azimuth of 140 degrees. It is integrated beneath a haul road intended for ultra-heavy-duty mining trucks, specifically BELAZ trucks with a payload capacity of 110 tonnes, used for overburden transport. The underpass is equipped with wing walls on all sides, to ensure structural stability and seamless integration with the surrounding terrain. The solution ensures uninterrupted operation of the conveyor system while maintaining the safety and functionality of the haul road for continuous mining operations.
- 1 January 2025
- Published by Centre for Evaluation in Education and Science (CEON/CEES) in Mining and Metallurgy Engineering Bor
- No. 2,p. 1-10
Open AccessTechnological and structural design of a conveyor underpass for the combined coal transport system from the roof exploitation zone of the Gacko-Central Field open pit mine
This paper presents the technological and structural design solution of a tunnel-shaped underpass constructed for the coal conveyor belt of a combined transport system, serving the Roof Exploitation Zone of the Gacko - Central Field open-pit coal mine. The underpass has a clear opening of 6.1 meters in width and 2.5 meters in height and is positioned at an azimuth of 140 degrees. It is integrated beneath a haul road intended for ultra-heavy-duty mining trucks, specifically BELAZ trucks with a payload capacity of 110 tonnes, used for overburden transport. The underpass is equipped with wing walls on all sides, to ensure structural stability and seamless integration with the surrounding terrain. The solution ensures uninterrupted operation of the conveyor system while maintaining the safety and functionality of the haul road for continuous mining operations.
- Open Access
- 1 January 2025
- Published by Centre for Evaluation in Education and Science (CEON/CEES)
- No. Geology an,p. 148-152
Building information modeling (BIM) as a tool for enhancing technical solutions in mining design: A case study of the main process building in Brskovo, Montenegro
Modern mining systems require advanced architectural and construction solutions to ensure functionality, safety, and efficiency. Traditional two-dimensional design methods are increasingly insufficient for managing complex facilities. Building Information Modeling (BIM) offers a modern, integrated approach to digital project modeling. This paper examines the use of BIM tools in mining facility design, focusing on architectural and structural aspects. It highlights key benefits such as improved technical coordination, visualization, and documentation quality, while addressing implementation challenges. Through practical examples, the study demonstrates the potential of BIM to enhance the efficiency and quality of mining design processes.
- 1 January 2025
- Published by Centre for Evaluation in Education and Science (CEON/CEES)
- No. Geology an,p. 148-152
Open AccessBuilding information modeling (BIM) as a tool for enhancing technical solutions in mining design: A case study of the main process building in Brskovo, Montenegro
Modern mining systems require advanced architectural and construction solutions to ensure functionality, safety, and efficiency. Traditional two-dimensional design methods are increasingly insufficient for managing complex facilities. Building Information Modeling (BIM) offers a modern, integrated approach to digital project modeling. This paper examines the use of BIM tools in mining facility design, focusing on architectural and structural aspects. It highlights key benefits such as improved technical coordination, visualization, and documentation quality, while addressing implementation challenges. Through practical examples, the study demonstrates the potential of BIM to enhance the efficiency and quality of mining design processes.
- Open Access
- 1 January 2025
- Published by Centre for Evaluation in Education and Science (CEON/CEES) in Mining and Metallurgy Engineering Bor
- No. 1,p. 63-68
Limestone aggregate purification as a part of the crushing and sieving at the "Kaona" quarry
As a part of the Main Mining Design for limestone processing at the Open Pit Kaona - Kučevo, a new Crushing Plant has been designed. This paper includes a part of technological process for additional cleaning of limestone with a fraction of -20+0 mm before the primary crushing.
- 1 January 2025
- Published by Centre for Evaluation in Education and Science (CEON/CEES) in Mining and Metallurgy Engineering Bor
- No. 1,p. 63-68
Open AccessLimestone aggregate purification as a part of the crushing and sieving at the "Kaona" quarry
As a part of the Main Mining Design for limestone processing at the Open Pit Kaona - Kučevo, a new Crushing Plant has been designed. This paper includes a part of technological process for additional cleaning of limestone with a fraction of -20+0 mm before the primary crushing.
- Open Access
- 1 January 2025
- Published by Centre for Evaluation in Education and Science (CEON/CEES) in Mining and Metallurgy Engineering Bor
- No. 1,p. 69-74
Technological and structural solution for the strengthening of the load-bearing structure of the crusher facility Drmno
This paper presents the technological and structural solution for the reinforcement of the main load-bearing steel structure of the crusher facility at the Drmno open-pit coal mine near Kostolac. The structure in question is part of a coal crushing plant exposed to dynamic and static loads over extended periods of operation. In order to achieve the designed and required granulation of the crushed coal, the crushing plant was reconstructed. As part of this reconstruction, the existing belt feeders intended for feeding the jaw crushers were replaced with plate feeders. Due to the increased load on the structure, the steel structure was reinforced. The reinforcement was carried out using prefabricated HEB steel profiles with welded stiffeners, providing additional load-carrying capacity and improving overall structural stability. The adopted solution enabled continued safe operation of the facility. The paper also discusses the methodology of structural assessment, the installation process, and the effectiveness of the applied reinforcement system.
- 1 January 2025
- Published by Centre for Evaluation in Education and Science (CEON/CEES) in Mining and Metallurgy Engineering Bor
- No. 1,p. 69-74
Open AccessTechnological and structural solution for the strengthening of the load-bearing structure of the crusher facility Drmno
This paper presents the technological and structural solution for the reinforcement of the main load-bearing steel structure of the crusher facility at the Drmno open-pit coal mine near Kostolac. The structure in question is part of a coal crushing plant exposed to dynamic and static loads over extended periods of operation. In order to achieve the designed and required granulation of the crushed coal, the crushing plant was reconstructed. As part of this reconstruction, the existing belt feeders intended for feeding the jaw crushers were replaced with plate feeders. Due to the increased load on the structure, the steel structure was reinforced. The reinforcement was carried out using prefabricated HEB steel profiles with welded stiffeners, providing additional load-carrying capacity and improving overall structural stability. The adopted solution enabled continued safe operation of the facility. The paper also discusses the methodology of structural assessment, the installation process, and the effectiveness of the applied reinforcement system.
- Open Access
- 1 January 2025
- Published by Centre for Evaluation in Education and Science (CEON/CEES) in Mining and Metallurgy Engineering Bor
- No. 1,p. 81-84
Methodological approach to managing the development of a main mining design: A case study of the X-Ray plant at the Gacko open-pit mine
The paper presents an approach to managing the development of the main mining project for an X-Ray sensor-based coal sorting plant under complex technical and organizational conditions at the Gacko open-pit mine. The project team was virtual in nature, consisting of members from multiple countries and disciplines. Through the application of modern project management tools (OBS, WBS, MS Project), the efficiency of planning, control, and risk management was analyzed. The results highlight the importance of a multidisciplinary and digitally integrated approach in the implementation of complex mining projects.
- 1 January 2025
- Published by Centre for Evaluation in Education and Science (CEON/CEES) in Mining and Metallurgy Engineering Bor
- No. 1,p. 81-84
Open AccessMethodological approach to managing the development of a main mining design: A case study of the X-Ray plant at the Gacko open-pit mine
The paper presents an approach to managing the development of the main mining project for an X-Ray sensor-based coal sorting plant under complex technical and organizational conditions at the Gacko open-pit mine. The project team was virtual in nature, consisting of members from multiple countries and disciplines. Through the application of modern project management tools (OBS, WBS, MS Project), the efficiency of planning, control, and risk management was analyzed. The results highlight the importance of a multidisciplinary and digitally integrated approach in the implementation of complex mining projects.
- Open Access
- 1 January 2025
- Published by Centre for Evaluation in Education and Science (CEON/CEES) in Mining and Metallurgy Engineering Bor
- No. 1,p. 75-80
Evaluation of the corrosion resistance of steel elements from electrolytic refining plant
The aim of this paper is to present a method for determine a model for accelerated corrosion testing of S235 steel. The experiment was conducted in two parts. In the first part, steel specimens were placed in the Electrolytic Refining Plant, in real conditions, in a indoor. This part of the experiment lasted 6 months. In the second part of the experiment, an attempt was made to obtain a model for accelerated corrosion testing that would accurately simulate real conditions in the Electrolysis. The steel specimens were therefore immersed in the electrolyte solution from the Electrolysis for a month. After cleaning the specimens, mass loss measurements were performed, and then these values were used to determine the corrosion rate after extended exposure. The results show that a shorter experimental duration should be chosen for specimens immersed in the electrolyte solution.
- 1 January 2025
- Published by Centre for Evaluation in Education and Science (CEON/CEES) in Mining and Metallurgy Engineering Bor
- No. 1,p. 75-80
Open AccessEvaluation of the corrosion resistance of steel elements from electrolytic refining plant
The aim of this paper is to present a method for determine a model for accelerated corrosion testing of S235 steel. The experiment was conducted in two parts. In the first part, steel specimens were placed in the Electrolytic Refining Plant, in real conditions, in a indoor. This part of the experiment lasted 6 months. In the second part of the experiment, an attempt was made to obtain a model for accelerated corrosion testing that would accurately simulate real conditions in the Electrolysis. The steel specimens were therefore immersed in the electrolyte solution from the Electrolysis for a month. After cleaning the specimens, mass loss measurements were performed, and then these values were used to determine the corrosion rate after extended exposure. The results show that a shorter experimental duration should be chosen for specimens immersed in the electrolyte solution.
- Open Access
- 1 January 2024
- Published by Centre for Evaluation in Education and Science (CEON/CEES)
- No. Geology, m,p. 87-90
Protective channels to prevent a potential rockfall during blasting
Drilling and blasting at the Open Pit North Mining District takes place in the complex geological and urban environment conditions. The proximity of the city requires the performance of mining works with application the numerous and strict protection measures against the negative impact of mining. This paper presents a protection measure against the possible movement of loose pieces of rock that may occur as a result of blasting by creating the protective channels.
- 1 January 2024
- Published by Centre for Evaluation in Education and Science (CEON/CEES)
- No. Geology, m,p. 87-90
Open AccessProtective channels to prevent a potential rockfall during blasting
Drilling and blasting at the Open Pit North Mining District takes place in the complex geological and urban environment conditions. The proximity of the city requires the performance of mining works with application the numerous and strict protection measures against the negative impact of mining. This paper presents a protection measure against the possible movement of loose pieces of rock that may occur as a result of blasting by creating the protective channels.