Nikola Jovanović
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Nikola Jovanović has a total of 20 co-authors. Here are the top co-authors by number of shared publications:
- Jelena Stefanović
Mining and Metallurgy Institute Bor Alberta Ajnštajna 1 19210 Bor Serbia
13 shared publications - Miloš Živanović
Mining and Metallurgy Institute Bor Alberta Ajnštajna 1 19210 Bor Serbia
12 shared publications - Nikola Miljković
Mining and Metallurgy Institute Bor Alberta Ajnštajna 1 19210 Bor Serbia
10 shared publications - Jelena Đorđević
Mining and Metallurgy Institute Bor Alberta Ajnštajna 1 19210 Bor Serbia
7 shared publications - Zlatko Pavlović
Mining and Metallurgy Institute Bor Alberta Ajnštajna 1 19210 Bor Serbia
6 shared publications - Ivan Stojičić
Mining and Metallurgy Institute Bor Alberta Ajnštajna 1 19210 Bor Serbia
5 shared publications
Latest Publications
- Open Access
- 1 January 2026
- Published by Centre for Evaluation in Education and Science (CEON/CEES)
- No. Related fi,p. 459-464
Second-generation Eurocode 4: Changes in EN 1994-1-1:2026 and design implications
The second generation of Eurocode 4 was published in 2026 after systematic review and technical development under Mandate M/515. This paper provides a standards-based comparison of EN 1994-1-1:2004 and EN 1994-1-1:2026, focusing on document structure, material scope, composite-beam design, shear connection, composite slabs, and construction systems newly covered by annexes. The revised document introduces strain-limited design, connector ductility categories, refined partial shear-connection rules, harmonized test procedures, and provisions for Web openings, shallow floors, modern profiled sheeting, and precast slabs. Practical benefits, additional verification demands, and transition issues are discussed.
- 1 January 2026
- Published by Centre for Evaluation in Education and Science (CEON/CEES)
- No. Related fi,p. 459-464
Open AccessSecond-generation Eurocode 4: Changes in EN 1994-1-1:2026 and design implications
The second generation of Eurocode 4 was published in 2026 after systematic review and technical development under Mandate M/515. This paper provides a standards-based comparison of EN 1994-1-1:2004 and EN 1994-1-1:2026, focusing on document structure, material scope, composite-beam design, shear connection, composite slabs, and construction systems newly covered by annexes. The revised document introduces strain-limited design, connector ductility categories, refined partial shear-connection rules, harmonized test procedures, and provisions for Web openings, shallow floors, modern profiled sheeting, and precast slabs. Practical benefits, additional verification demands, and transition issues are discussed.
- Open Access
- 1 January 2026
- Published by Centre for Evaluation in Education and Science (CEON/CEES)
- No. Related fi,p. 453-458
Second-generation Eurocode 2: Structural reorganisation, new design models and practical implications
The second generation of Eurocode 2 was published as EN 1992-1-1:2023 after systematic review and technical development under Mandate M/515. This paper provides a standards-based overview of the transition from EN 1992-1-1:2004, focusing on document structure, sustainability, durability, shear and punching, serviceability and reinforcement detailing. The revised document integrates rules for buildings, bridges and civil-engineering structures, permits later concrete-strength reference ages, introduces exposure resistance classes and uses more physically based resistance models. The benefits, additional information demands and implementation issues are discussed without reproducing detailed design formulae or project-specific calculations.
- 1 January 2026
- Published by Centre for Evaluation in Education and Science (CEON/CEES)
- No. Related fi,p. 453-458
Open AccessSecond-generation Eurocode 2: Structural reorganisation, new design models and practical implications
The second generation of Eurocode 2 was published as EN 1992-1-1:2023 after systematic review and technical development under Mandate M/515. This paper provides a standards-based overview of the transition from EN 1992-1-1:2004, focusing on document structure, sustainability, durability, shear and punching, serviceability and reinforcement detailing. The revised document integrates rules for buildings, bridges and civil-engineering structures, permits later concrete-strength reference ages, introduces exposure resistance classes and uses more physically based resistance models. The benefits, additional information demands and implementation issues are discussed without reproducing detailed design formulae or project-specific calculations.
- Open Access
- 1 January 2026
- Published by Centre for Evaluation in Education and Science (CEON/CEES)
- No. Related fi,p. 449-452
Key challenges in planning and managing investment projects in the mining sector
Investment projects in the mining sector are complex due to high capital requirements, technical uncertainty, operational constraints and strict environmental and safety requirements. This paper analyzes the key challenges that influence the planning and management of mining investment projects, with special attention to scope definition, multidisciplinary coordination, equipment procurement, production downtime, cost control and regulatory compliance. The paper emphasizes the need for an integrated project management approach that connects technical planning, resource coordination, risk management and continuous monitoring in order to improve project performance and support successful implementation in mining organizations.
- 1 January 2026
- Published by Centre for Evaluation in Education and Science (CEON/CEES)
- No. Related fi,p. 449-452
Open AccessKey challenges in planning and managing investment projects in the mining sector
Investment projects in the mining sector are complex due to high capital requirements, technical uncertainty, operational constraints and strict environmental and safety requirements. This paper analyzes the key challenges that influence the planning and management of mining investment projects, with special attention to scope definition, multidisciplinary coordination, equipment procurement, production downtime, cost control and regulatory compliance. The paper emphasizes the need for an integrated project management approach that connects technical planning, resource coordination, risk management and continuous monitoring in order to improve project performance and support successful implementation in mining organizations.
- Open Access
- 1 January 2026
- Published by Centre for Evaluation in Education and Science (CEON/CEES)
- No. Related fi,p. 443-448
Implementation of material model in Abaqus/Standard using UMAT subroutine
Corrosion-induced material loss can lead to significant degradation of the mechanical properties and load-bearing capacity of steel structural elements. The resulting material behaviour can be associated with the mechanisms of void nucleation, growth and coalescence characteristic of ductile fracture. This paper presents the implementation of a material damage model based on the Complete Gurson Model (CGM) in Abaqus/Standard using a user-defined UMAT subroutine. The implemented model incorporates the Gurson-Tvergaard-Needleman approach and the Thomason failure criterion, enabling the simulation of material degradation and ductile fracture. The input material parameters and state variables required for the numerical analysis are presented, together with the interaction procedure between Abaqus and the UMAT subroutine. The proposed implementation provides an extended material model for numerical analysis of steel elements affected by corrosion and other surface damage mechanisms.
- 1 January 2026
- Published by Centre for Evaluation in Education and Science (CEON/CEES)
- No. Related fi,p. 443-448
Open AccessImplementation of material model in Abaqus/Standard using UMAT subroutine
Corrosion-induced material loss can lead to significant degradation of the mechanical properties and load-bearing capacity of steel structural elements. The resulting material behaviour can be associated with the mechanisms of void nucleation, growth and coalescence characteristic of ductile fracture. This paper presents the implementation of a material damage model based on the Complete Gurson Model (CGM) in Abaqus/Standard using a user-defined UMAT subroutine. The implemented model incorporates the Gurson-Tvergaard-Needleman approach and the Thomason failure criterion, enabling the simulation of material degradation and ductile fracture. The input material parameters and state variables required for the numerical analysis are presented, together with the interaction procedure between Abaqus and the UMAT subroutine. The proposed implementation provides an extended material model for numerical analysis of steel elements affected by corrosion and other surface damage mechanisms.
- Open Access
- 1 January 2026
- Published by Centre for Evaluation in Education and Science (CEON/CEES)
- No. Geology, m,p. 89-92
An integrated methodology for project portfolio selection and optimization in mining industry
Project portfolio selection in the mining sector requires the simultaneous consideration of economic, technical, environmental, regulatory and resource-related objectives. Traditional project ranking methods are often insufficient because they evaluate projects individually and do not ensure a feasible portfolio structure. This paper proposes an integrated MCDM-MOO framework for project portfolio selection and optimization in mining. MCDM supports the evaluation of project candidates and the incorporation of decision-maker preferences, while MOO generates portfolio alternatives under budgetary, resource, technical and regulatory constraints. The framework enables the identification of Pareto-efficient portfolios and supports transparent compromise decision-making.
- 1 January 2026
- Published by Centre for Evaluation in Education and Science (CEON/CEES)
- No. Geology, m,p. 89-92
Open AccessAn integrated methodology for project portfolio selection and optimization in mining industry
Project portfolio selection in the mining sector requires the simultaneous consideration of economic, technical, environmental, regulatory and resource-related objectives. Traditional project ranking methods are often insufficient because they evaluate projects individually and do not ensure a feasible portfolio structure. This paper proposes an integrated MCDM-MOO framework for project portfolio selection and optimization in mining. MCDM supports the evaluation of project candidates and the incorporation of decision-maker preferences, while MOO generates portfolio alternatives under budgetary, resource, technical and regulatory constraints. The framework enables the identification of Pareto-efficient portfolios and supports transparent compromise decision-making.
- Open Access
- 1 January 2026
- Published by Centre for Evaluation in Education and Science (CEON/CEES) in Mining and Metallurgy Engineering Bor
- No. 1,p. 1-14
Geological characteristics of the "Strmosten" coal deposit in the Rembas-Resavica sub-bituminous coal mine
The Strmosten brown coal deposit, situated in the northern part of the Senje-Resavica Basin, has been the focus of long-term exploration to determine its reserves, quality, and geological framework. Investigations comprised field geological observations, drilling campaigns, underground workings, and laboratory analyses of collected samples. It was determined that the deposit includes multiple brown coal layers of variable quality developed within the Paleogene succession. Petrographic studies and huminite reflectance analysis reveal the presence of dull to semi-bright brown coals with an average huminite reflectance of 0.45%. The tectonic setting is complex, with pronounced fault structures affecting deposit continuity. Based on the processed data, assessments of on-balance and off-balance reserves, as well as potential mining conditions in the Rembas-Resavica Brown Coal Mine, were performed. The results provide a basis for further planning and economic evaluation of exploitation in the brown coal mine.
- 1 January 2026
- Published by Centre for Evaluation in Education and Science (CEON/CEES) in Mining and Metallurgy Engineering Bor
- No. 1,p. 1-14
Open AccessGeological characteristics of the "Strmosten" coal deposit in the Rembas-Resavica sub-bituminous coal mine
The Strmosten brown coal deposit, situated in the northern part of the Senje-Resavica Basin, has been the focus of long-term exploration to determine its reserves, quality, and geological framework. Investigations comprised field geological observations, drilling campaigns, underground workings, and laboratory analyses of collected samples. It was determined that the deposit includes multiple brown coal layers of variable quality developed within the Paleogene succession. Petrographic studies and huminite reflectance analysis reveal the presence of dull to semi-bright brown coals with an average huminite reflectance of 0.45%. The tectonic setting is complex, with pronounced fault structures affecting deposit continuity. Based on the processed data, assessments of on-balance and off-balance reserves, as well as potential mining conditions in the Rembas-Resavica Brown Coal Mine, were performed. The results provide a basis for further planning and economic evaluation of exploitation in the brown coal mine.
- Open Access
- 1 January 2026
- Published by Centre for Evaluation in Education and Science (CEON/CEES)
- p. 900-907
A governance-embedded decision-support framework for sustainable project portfolio selection in the Western Balkans
Sustainable project portfolio management increasingly requires organizations to move beyond project-by-project appraisal and to justify portfolio choices through transparent, strategy-oriented, and ESG-sensitive decision logic. This paper develops a governance-embedded decision-support framework for sustainable project portfolio selection in industrial systems in the Western Balkans. Building on literature from strategic project management, project portfolio management, sustainability, ESG, multi-criteria decision-making, and multi-objective optimization, the study reframes the central challenge as an evaluation-optimization gap: sustainability criteria are often defined and used for project scoring, while fewer approaches show how these scores become feasible portfolio configurations under budget, capacity, timing, risk, and policy constraints. The proposed framework connects strategic screening, sustainability criteria operationalization, MCDM-based evaluation, Pareto-oriented MOO, backlog management, and periodic portfolio rebalancing. The contribution is conceptual and methodological: it offers an integrated architecture for turning sustainability priorities into defensible portfolio-level decisions in a regional context shaped by modernization needs, energy-transition pressure, capital limitations, and increasing alignment with European sustainability expectations.
- 1 January 2026
- Published by Centre for Evaluation in Education and Science (CEON/CEES)
- p. 900-907
Open AccessA governance-embedded decision-support framework for sustainable project portfolio selection in the Western Balkans
Sustainable project portfolio management increasingly requires organizations to move beyond project-by-project appraisal and to justify portfolio choices through transparent, strategy-oriented, and ESG-sensitive decision logic. This paper develops a governance-embedded decision-support framework for sustainable project portfolio selection in industrial systems in the Western Balkans. Building on literature from strategic project management, project portfolio management, sustainability, ESG, multi-criteria decision-making, and multi-objective optimization, the study reframes the central challenge as an evaluation-optimization gap: sustainability criteria are often defined and used for project scoring, while fewer approaches show how these scores become feasible portfolio configurations under budget, capacity, timing, risk, and policy constraints. The proposed framework connects strategic screening, sustainability criteria operationalization, MCDM-based evaluation, Pareto-oriented MOO, backlog management, and periodic portfolio rebalancing. The contribution is conceptual and methodological: it offers an integrated architecture for turning sustainability priorities into defensible portfolio-level decisions in a regional context shaped by modernization needs, energy-transition pressure, capital limitations, and increasing alignment with European sustainability expectations.
- Open Access
- 1 January 2025
- Published by Centre for Evaluation in Education and Science (CEON/CEES)
- No. Geology an,p. 148-152
Building information modeling (BIM) as a tool for enhancing technical solutions in mining design: A case study of the main process building in Brskovo, Montenegro
Modern mining systems require advanced architectural and construction solutions to ensure functionality, safety, and efficiency. Traditional two-dimensional design methods are increasingly insufficient for managing complex facilities. Building Information Modeling (BIM) offers a modern, integrated approach to digital project modeling. This paper examines the use of BIM tools in mining facility design, focusing on architectural and structural aspects. It highlights key benefits such as improved technical coordination, visualization, and documentation quality, while addressing implementation challenges. Through practical examples, the study demonstrates the potential of BIM to enhance the efficiency and quality of mining design processes.
- 1 January 2025
- Published by Centre for Evaluation in Education and Science (CEON/CEES)
- No. Geology an,p. 148-152
Open AccessBuilding information modeling (BIM) as a tool for enhancing technical solutions in mining design: A case study of the main process building in Brskovo, Montenegro
Modern mining systems require advanced architectural and construction solutions to ensure functionality, safety, and efficiency. Traditional two-dimensional design methods are increasingly insufficient for managing complex facilities. Building Information Modeling (BIM) offers a modern, integrated approach to digital project modeling. This paper examines the use of BIM tools in mining facility design, focusing on architectural and structural aspects. It highlights key benefits such as improved technical coordination, visualization, and documentation quality, while addressing implementation challenges. Through practical examples, the study demonstrates the potential of BIM to enhance the efficiency and quality of mining design processes.
- Open Access
- 1 January 2025
- Published by Centre for Evaluation in Education and Science (CEON/CEES)
- No. Mineral Pr,p. 195-198
Effect of recycled asphalt (RAP) and copper slag (CS) as partial substitution of natural aggregate in asphalt mixtures
The expansion of the road network requires the use of a large amount of natural resources. On the other hand, industrial development leads to the creation and deposition of a large amount of industrial waste. Large amounts of this waste accumulate in landfills close to the production process and represent a major environmental and economic problem, which can be solved by reusing industrial waste in the construction sector. Many researchers dealt with the topic of using copper slag as a partial replacement of natural aggregate in asphalt mixtures and as a result obtained favorable physical and mechanical characteristics of asphalt mixtures. One of the negative impacts of this alternative material is the high porosity of the slag, which required a higher amount of bitumen in the asphalt mixtures. However, this problem is solved by adding recycled asphalt (RAP-Recycled asphalt pavement) in the mixes.
- 1 January 2025
- Published by Centre for Evaluation in Education and Science (CEON/CEES)
- No. Mineral Pr,p. 195-198
Open AccessEffect of recycled asphalt (RAP) and copper slag (CS) as partial substitution of natural aggregate in asphalt mixtures
The expansion of the road network requires the use of a large amount of natural resources. On the other hand, industrial development leads to the creation and deposition of a large amount of industrial waste. Large amounts of this waste accumulate in landfills close to the production process and represent a major environmental and economic problem, which can be solved by reusing industrial waste in the construction sector. Many researchers dealt with the topic of using copper slag as a partial replacement of natural aggregate in asphalt mixtures and as a result obtained favorable physical and mechanical characteristics of asphalt mixtures. One of the negative impacts of this alternative material is the high porosity of the slag, which required a higher amount of bitumen in the asphalt mixtures. However, this problem is solved by adding recycled asphalt (RAP-Recycled asphalt pavement) in the mixes.
- Open Access
- 1 January 2025
- Published by Centre for Evaluation in Education and Science (CEON/CEES) in Mining and Metallurgy Engineering Bor
- No. 1,p. 63-68
Limestone aggregate purification as a part of the crushing and sieving at the "Kaona" quarry
As a part of the Main Mining Design for limestone processing at the Open Pit Kaona - Kučevo, a new Crushing Plant has been designed. This paper includes a part of technological process for additional cleaning of limestone with a fraction of -20+0 mm before the primary crushing.
- 1 January 2025
- Published by Centre for Evaluation in Education and Science (CEON/CEES) in Mining and Metallurgy Engineering Bor
- No. 1,p. 63-68
Open AccessLimestone aggregate purification as a part of the crushing and sieving at the "Kaona" quarry
As a part of the Main Mining Design for limestone processing at the Open Pit Kaona - Kučevo, a new Crushing Plant has been designed. This paper includes a part of technological process for additional cleaning of limestone with a fraction of -20+0 mm before the primary crushing.