NJNikola Jovanović

Nikola Jovanović

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Nikola Jovanović has a total of 20 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Second-generation Eurocode 4: Changes in EN 1994-1-1:2026 and design implications

    by Miloš Živanović, Ivan Stojičić, Nikola Miljković, Nikola Jovanović, Miloš Marković, Jelena Đorđević

    The second generation of Eurocode 4 was published in 2026 after systematic review and technical development under Mandate M/515. This paper provides a standards-based comparison of EN 1994-1-1:2004 and EN 1994-1-1:2026, focusing on document structure, material scope, composite-beam design, shear connection, composite slabs, and construction systems newly covered by annexes. The revised document introduces strain-limited design, connector ductility categories, refined partial shear-connection rules, harmonized test procedures, and provisions for Web openings, shallow floors, modern profiled sheeting, and precast slabs. Practical benefits, additional verification demands, and transition issues are discussed.

  • Open Access

    Second-generation Eurocode 2: Structural reorganisation, new design models and practical implications

    by Miloš Živanović, Ivan Stojičić, Nikola Miljković, Nikola Jovanović, Miloš Marković, Jelena Stefanović

    The second generation of Eurocode 2 was published as EN 1992-1-1:2023 after systematic review and technical development under Mandate M/515. This paper provides a standards-based overview of the transition from EN 1992-1-1:2004, focusing on document structure, sustainability, durability, shear and punching, serviceability and reinforcement detailing. The revised document integrates rules for buildings, bridges and civil-engineering structures, permits later concrete-strength reference ages, introduces exposure resistance classes and uses more physically based resistance models. The benefits, additional information demands and implementation issues are discussed without reproducing detailed design formulae or project-specific calculations.

  • Open Access

    Key challenges in planning and managing investment projects in the mining sector

    by Nikola Jovanović, Miloš Živanović, Jelena Stefanović, Zlatko Pavlović, Nikola Miljković, Jelena Đorđević, Nikola Lekić

    Investment projects in the mining sector are complex due to high capital requirements, technical uncertainty, operational constraints and strict environmental and safety requirements. This paper analyzes the key challenges that influence the planning and management of mining investment projects, with special attention to scope definition, multidisciplinary coordination, equipment procurement, production downtime, cost control and regulatory compliance. The paper emphasizes the need for an integrated project management approach that connects technical planning, resource coordination, risk management and continuous monitoring in order to improve project performance and support successful implementation in mining organizations.

  • Open Access

    Implementation of material model in Abaqus/Standard using UMAT subroutine

    by Jelena Stefanović, Stevan Dimitrijević, Zoran Avramović, Sandra Guševac, Jelena Đorđević, Nevena Marković, Nikola Jovanović

    Corrosion-induced material loss can lead to significant degradation of the mechanical properties and load-bearing capacity of steel structural elements. The resulting material behaviour can be associated with the mechanisms of void nucleation, growth and coalescence characteristic of ductile fracture. This paper presents the implementation of a material damage model based on the Complete Gurson Model (CGM) in Abaqus/Standard using a user-defined UMAT subroutine. The implemented model incorporates the Gurson-Tvergaard-Needleman approach and the Thomason failure criterion, enabling the simulation of material degradation and ductile fracture. The input material parameters and state variables required for the numerical analysis are presented, together with the interaction procedure between Abaqus and the UMAT subroutine. The proposed implementation provides an extended material model for numerical analysis of steel elements affected by corrosion and other surface damage mechanisms.

  • Open Access

    An integrated methodology for project portfolio selection and optimization in mining industry

    by Nikola Jovanović, Aca Jovanović, Ivana Berić

    Project portfolio selection in the mining sector requires the simultaneous consideration of economic, technical, environmental, regulatory and resource-related objectives. Traditional project ranking methods are often insufficient because they evaluate projects individually and do not ensure a feasible portfolio structure. This paper proposes an integrated MCDM-MOO framework for project portfolio selection and optimization in mining. MCDM supports the evaluation of project candidates and the incorporation of decision-maker preferences, while MOO generates portfolio alternatives under budgetary, resource, technical and regulatory constraints. The framework enables the identification of Pareto-efficient portfolios and supports transparent compromise decision-making.

  • Open Access

    Geological characteristics of the "Strmosten" coal deposit in the Rembas-Resavica sub-bituminous coal mine

    by Anđela Marinčić, Željana Novković, Ivan Stojičić, Miljan Gomilanović, Nikola Jovanović

    The Strmosten brown coal deposit, situated in the northern part of the Senje-Resavica Basin, has been the focus of long-term exploration to determine its reserves, quality, and geological framework. Investigations comprised field geological observations, drilling campaigns, underground workings, and laboratory analyses of collected samples. It was determined that the deposit includes multiple brown coal layers of variable quality developed within the Paleogene succession. Petrographic studies and huminite reflectance analysis reveal the presence of dull to semi-bright brown coals with an average huminite reflectance of 0.45%. The tectonic setting is complex, with pronounced fault structures affecting deposit continuity. Based on the processed data, assessments of on-balance and off-balance reserves, as well as potential mining conditions in the Rembas-Resavica Brown Coal Mine, were performed. The results provide a basis for further planning and economic evaluation of exploitation in the brown coal mine.

  • Open Access

    A governance-embedded decision-support framework for sustainable project portfolio selection in the Western Balkans

    by Nikola Jovanović, Aca Jovanović, Ivana Berić

    Sustainable project portfolio management increasingly requires organizations to move beyond project-by-project appraisal and to justify portfolio choices through transparent, strategy-oriented, and ESG-sensitive decision logic. This paper develops a governance-embedded decision-support framework for sustainable project portfolio selection in industrial systems in the Western Balkans. Building on literature from strategic project management, project portfolio management, sustainability, ESG, multi-criteria decision-making, and multi-objective optimization, the study reframes the central challenge as an evaluation-optimization gap: sustainability criteria are often defined and used for project scoring, while fewer approaches show how these scores become feasible portfolio configurations under budget, capacity, timing, risk, and policy constraints. The proposed framework connects strategic screening, sustainability criteria operationalization, MCDM-based evaluation, Pareto-oriented MOO, backlog management, and periodic portfolio rebalancing. The contribution is conceptual and methodological: it offers an integrated architecture for turning sustainability priorities into defensible portfolio-level decisions in a regional context shaped by modernization needs, energy-transition pressure, capital limitations, and increasing alignment with European sustainability expectations.

  • Open Access

    Building information modeling (BIM) as a tool for enhancing technical solutions in mining design: A case study of the main process building in Brskovo, Montenegro

    by Nikola Jovanović, Jelena Stefanović, Miloš Živanović, Zlatko Pavlović, Nikola Miljković, Jelena Đorđević, Nikola Lekić

    Modern mining systems require advanced architectural and construction solutions to ensure functionality, safety, and efficiency. Traditional two-dimensional design methods are increasingly insufficient for managing complex facilities. Building Information Modeling (BIM) offers a modern, integrated approach to digital project modeling. This paper examines the use of BIM tools in mining facility design, focusing on architectural and structural aspects. It highlights key benefits such as improved technical coordination, visualization, and documentation quality, while addressing implementation challenges. Through practical examples, the study demonstrates the potential of BIM to enhance the efficiency and quality of mining design processes.

  • Open Access

    Effect of recycled asphalt (RAP) and copper slag (CS) as partial substitution of natural aggregate in asphalt mixtures

    by Jelena Đorđević, Jelena Stefanović, Sandra Guševac, Nevena Marković, Zoran Avramović, Nikola Jovanović, Nikola Lekić

    The expansion of the road network requires the use of a large amount of natural resources. On the other hand, industrial development leads to the creation and deposition of a large amount of industrial waste. Large amounts of this waste accumulate in landfills close to the production process and represent a major environmental and economic problem, which can be solved by reusing industrial waste in the construction sector. Many researchers dealt with the topic of using copper slag as a partial replacement of natural aggregate in asphalt mixtures and as a result obtained favorable physical and mechanical characteristics of asphalt mixtures. One of the negative impacts of this alternative material is the high porosity of the slag, which required a higher amount of bitumen in the asphalt mixtures. However, this problem is solved by adding recycled asphalt (RAP-Recycled asphalt pavement) in the mixes.

  • Open Access

    Limestone aggregate purification as a part of the crushing and sieving at the "Kaona" quarry

    by Nikola Miljković, Ivan Stojičić, Miloš Živanović, Nikola Jovanović, Jelena Stefanović

    As a part of the Main Mining Design for limestone processing at the Open Pit Kaona - Kučevo, a new Crushing Plant has been designed. This paper includes a part of technological process for additional cleaning of limestone with a fraction of -20+0 mm before the primary crushing.