Xianghao Sun
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Xianghao Sun has a total of 14 co-authors. Here are the top co-authors by number of shared publications:
- Dunwen Liu
School of Resources and Safety Engineering, Central South University, Changsha 410083, China
4 shared publications - Chengtao Yang
School of Resources and Safety Engineering, Central South University, Changsha 410083, China
2 shared publications - Dan Yuan
School of Resources and Safety Engineering, Central South University, Changsha 410083, China
2 shared publications - Tao Ao
School of Resource and Safety Engineering, Central South University, Changsha 410083, China
2 shared publications - Xiaofei Sun
Road & Bridge South China Engineering Co., LTD., Zhongshan 528403, China
2 shared publications Bin Li
1 shared publication
Latest Publications
- Open Access
- 25 June 2026
- Published by MDPI AG in Fractal and Fractional
- Vol. 10 (7) , 430
Multiple Fractal Analysis and Prediction of the Settlement of the Upper Existing Highway Pavement Induced by Shallow-Buried Tunnel Construction
In recent years, it has become inevitable to dig underneath existing highways when excavating tunnels. The soil settlement induced by ground excavation may adversely affect existing highways. In this study, a settlement monitoring system is used to obtain the settlement sequence of multiple measurement points on the pavement. Multifractal detrended fluctuation analysis (MF-DFA) is used to focus on analyzing the multiple fractal features of the pavement settlement rate. The results show that the settlement rates of the highway caused by the tunnel excavation and construction process all show multiple fractal characteristics. The fluctuations in the measurement points above and near the entrance of the tunnel are more complex and intense. Based on the moving-average method (MA), convolutional neural network (CNN), and Extreme Learning Machine (ELM), MA-CNN and MA-ELM prediction models are constructed to predict the settlement value sequences of the fluctuating points. The results indicate that the MA-ELM prediction model demonstrates superior predictive performance (with R2 values of 0.956, 0.950, and 0.979 on the test set). Further, with the help of the Dung Beetle Optimizer (DBO), a meta-heuristic algorithm for parameter optimization, the hybrid model DBO-MA-ELM greatly improves the prediction performance (R2 of 0.975, 0.997, 0.998 for the testing set).
- 25 June 2026
- Published by MDPI AG in Fractal and Fractional
- Vol. 10 (7) , 430
Open AccessMultiple Fractal Analysis and Prediction of the Settlement of the Upper Existing Highway Pavement Induced by Shallow-Buried Tunnel Construction
In recent years, it has become inevitable to dig underneath existing highways when excavating tunnels. The soil settlement induced by ground excavation may adversely affect existing highways. In this study, a settlement monitoring system is used to obtain the settlement sequence of multiple measurement points on the pavement. Multifractal detrended fluctuation analysis (MF-DFA) is used to focus on analyzing the multiple fractal features of the pavement settlement rate. The results show that the settlement rates of the highway caused by the tunnel excavation and construction process all show multiple fractal characteristics. The fluctuations in the measurement points above and near the entrance of the tunnel are more complex and intense. Based on the moving-average method (MA), convolutional neural network (CNN), and Extreme Learning Machine (ELM), MA-CNN and MA-ELM prediction models are constructed to predict the settlement value sequences of the fluctuating points. The results indicate that the MA-ELM prediction model demonstrates superior predictive performance (with R2 values of 0.956, 0.950, and 0.979 on the test set). Further, with the help of the Dung Beetle Optimizer (DBO), a meta-heuristic algorithm for parameter optimization, the hybrid model DBO-MA-ELM greatly improves the prediction performance (R2 of 0.975, 0.997, 0.998 for the testing set).
- Open Access
- 1 June 2026
- Published by MDPI AG in Applied Sciences
- Vol. 16 (11) , 5503
Carbon Emission Calculation and Prediction of Asphalt Pavement Construction in Long Tunnel Based on Hybrid Life Cycle Assessment
Long asphalt tunnels serve as critical infrastructure for urban public transport, yet their construction entails substantial energy consumption and carbon emissions. This study aims to quantify and predict carbon emissions from asphalt pavement construction in long tunnels. Adopting Hybrid Life Cycle Assessment (HLCA), the asphalt paving process is divided into five stages: material production, transportation, on-site paving, milling, and ventilation. Four construction schemes are formulated via detailed calculation and analysis. A carbon emission factor database specific to long tunnel asphalt pavement construction in Guangxi is established, and a quantitative model is developed using the emission coefficient method to calculate carbon emissions of each scheme, among which Scheme 2 is determined as the optimal low-carbon construction scheme. The calculation model is validated via numerical software, and a carbon emission prediction dataset is constructed. Three prediction models, namely GA-BPNN, conventional SVR, and BPNN, are established. The results indicate that the GA-BPNN model achieves the highest predictive accuracy among the three models. This study further improves the calculation and prediction methods for carbon emissions in long tunnel asphalt pavement construction, providing theoretical support for carbon reduction and low-carbon construction management.
- 1 June 2026
- Published by MDPI AG in Applied Sciences
- Vol. 16 (11) , 5503
Open AccessCarbon Emission Calculation and Prediction of Asphalt Pavement Construction in Long Tunnel Based on Hybrid Life Cycle Assessment
Long asphalt tunnels serve as critical infrastructure for urban public transport, yet their construction entails substantial energy consumption and carbon emissions. This study aims to quantify and predict carbon emissions from asphalt pavement construction in long tunnels. Adopting Hybrid Life Cycle Assessment (HLCA), the asphalt paving process is divided into five stages: material production, transportation, on-site paving, milling, and ventilation. Four construction schemes are formulated via detailed calculation and analysis. A carbon emission factor database specific to long tunnel asphalt pavement construction in Guangxi is established, and a quantitative model is developed using the emission coefficient method to calculate carbon emissions of each scheme, among which Scheme 2 is determined as the optimal low-carbon construction scheme. The calculation model is validated via numerical software, and a carbon emission prediction dataset is constructed. Three prediction models, namely GA-BPNN, conventional SVR, and BPNN, are established. The results indicate that the GA-BPNN model achieves the highest predictive accuracy among the three models. This study further improves the calculation and prediction methods for carbon emissions in long tunnel asphalt pavement construction, providing theoretical support for carbon reduction and low-carbon construction management.
- Open Access
- 17 January 2025
- Published by MDPI AG in Mathematics
- Vol. 13 (2) , 286
Analytical Solution for Surrounding Rock Pressure of Deep-Buried Four-Hole Closely Spaced Double-Arch Tunnel
Research on the calculation method of deep-buried surrounding rock pressure is an important subject in engineering mathematics. The existing calculation methods are mainly the two-hole closely spaced tunnel, double-arch tunnel, three-hole closely spaced tunnel, and three-arch tunnel. The four-hole closely spaced double-arch tunnel has the characteristics of both the double-arch tunnel and closely spaced tunnel, and its surrounding rock pressure distribution is more complicated. In this paper, the research is carried out based on Protodyakonov’s theory and the concept of process load. The influence of the post-construction tunnel on the supporting structure of the pre-construction tunnel is also considered. The calculation model of the surrounding rock pressure of the deep-buried four-hole closely spaced double-arch tunnel is established, and the calculation formula of the surrounding rock pressure is deduced and verified. Finally, the influences of the rock column parameters, excavation procedure, tunnel span, and middle partition wall on the surrounding rock pressure are analyzed.
- 17 January 2025
- Published by MDPI AG in Mathematics
- Vol. 13 (2) , 286
Open AccessAnalytical Solution for Surrounding Rock Pressure of Deep-Buried Four-Hole Closely Spaced Double-Arch Tunnel
Research on the calculation method of deep-buried surrounding rock pressure is an important subject in engineering mathematics. The existing calculation methods are mainly the two-hole closely spaced tunnel, double-arch tunnel, three-hole closely spaced tunnel, and three-arch tunnel. The four-hole closely spaced double-arch tunnel has the characteristics of both the double-arch tunnel and closely spaced tunnel, and its surrounding rock pressure distribution is more complicated. In this paper, the research is carried out based on Protodyakonov’s theory and the concept of process load. The influence of the post-construction tunnel on the supporting structure of the pre-construction tunnel is also considered. The calculation model of the surrounding rock pressure of the deep-buried four-hole closely spaced double-arch tunnel is established, and the calculation formula of the surrounding rock pressure is deduced and verified. Finally, the influences of the rock column parameters, excavation procedure, tunnel span, and middle partition wall on the surrounding rock pressure are analyzed.
- Open Access
Study on the Vibration Propagation Law and Stress Distribution Characteristics in Double-Arch Tunnels During Blasting
Highway tunnel construction in mountainous areas of China has been developing rapidly. The influence of drilling and blasting on the existing tunnel structure has become a key factor affecting the safety and stability of tunnel construction. The double-arch tunnel has unique structural characteristics. The propagation characteristics of blasting vibrations and the resulting stress responses exhibit a certain level of complexity. There is little research on the influence of single-line blasting excavation of double-arch tunnel on the other line tunnel. This paper analyzes the blasting vibration of a double-arch tunnel by ANSYS/LS-DYNA. The propagation law of blasting vibration velocity and stress distribution law of blasting vibration in different sections of the tunnel is revealed. At the same time, the relationship between the peak particle velocity (PPV) and tensile stress is established, and the threshold vibration velocity is proposed. It provides a scientific basis for tunnel design and construction. The propagation of blasting vibration in the adjacent roadway is affected by the middle pilot tunnel. The peak vibration velocity of different parts decreases with the increase in distance. The monitoring of vibration velocity and stress in section A of the right line of the adjacent tunnel should be strengthened, especially in the tunnel vault, blast-facing side wall, and arch foot. The difference in vibration strength across different tunnel parts provides a basis for optimizing the structure. It helps strengthen the parts susceptible to vibration during the design stage of the multi-arch tunnel, improving the tunnel’s safety and stability.
Open AccessStudy on the Vibration Propagation Law and Stress Distribution Characteristics in Double-Arch Tunnels During Blasting
Highway tunnel construction in mountainous areas of China has been developing rapidly. The influence of drilling and blasting on the existing tunnel structure has become a key factor affecting the safety and stability of tunnel construction. The double-arch tunnel has unique structural characteristics. The propagation characteristics of blasting vibrations and the resulting stress responses exhibit a certain level of complexity. There is little research on the influence of single-line blasting excavation of double-arch tunnel on the other line tunnel. This paper analyzes the blasting vibration of a double-arch tunnel by ANSYS/LS-DYNA. The propagation law of blasting vibration velocity and stress distribution law of blasting vibration in different sections of the tunnel is revealed. At the same time, the relationship between the peak particle velocity (PPV) and tensile stress is established, and the threshold vibration velocity is proposed. It provides a scientific basis for tunnel design and construction. The propagation of blasting vibration in the adjacent roadway is affected by the middle pilot tunnel. The peak vibration velocity of different parts decreases with the increase in distance. The monitoring of vibration velocity and stress in section A of the right line of the adjacent tunnel should be strengthened, especially in the tunnel vault, blast-facing side wall, and arch foot. The difference in vibration strength across different tunnel parts provides a basis for optimizing the structure. It helps strengthen the parts susceptible to vibration during the design stage of the multi-arch tunnel, improving the tunnel’s safety and stability.
- Open Access
- 27 April 2024
- Published by Atlantis Press SARL
- p. 299-307
Research Status and Development of Blasting Vibration Monitoring Technology for Tunnel Construction Adjacent to Ancient Buildings
- 27 April 2024
- Published by Atlantis Press SARL
- p. 299-307
Open AccessResearch Status and Development of Blasting Vibration Monitoring Technology for Tunnel Construction Adjacent to Ancient Buildings