Dunwen Liu
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Dunwen Liu has a total of 44 co-authors. Here are the top co-authors by number of shared publications:
- Yu Tang
College of Water Resources and Civil Engineering, Hunan Agricultural University, Changsha 410128, China
18 shared publications - Wanmao Zhang
School of Resources and Safety Engineering, Central South University, Changsha 410083, China
8 shared publications - Yinghua Jian
School of Resources and Safety Engineering, Central South University, Changsha 410083, China
8 shared publications - Chengtao Yang
School of Resources and Safety Engineering, Central South University, Changsha 410083, China
6 shared publications - Weichao Qiu
Road & Bridge North China Engineering Co., Ltd., Beijing 101100, China
6 shared publications - Xiaofei Sun
Road & Bridge South China Engineering Co., LTD., Zhongshan 528403, China
6 shared publications
Latest Publications
- Open Access
- 25 June 2026
- Published by MDPI AG in Fractal and Fractional
- Vol. 10 (7) , 430
Multiple Fractal Analysis and Prediction of the Settlement of the Upper Existing Highway Pavement Induced by Shallow-Buried Tunnel Construction
In recent years, it has become inevitable to dig underneath existing highways when excavating tunnels. The soil settlement induced by ground excavation may adversely affect existing highways. In this study, a settlement monitoring system is used to obtain the settlement sequence of multiple measurement points on the pavement. Multifractal detrended fluctuation analysis (MF-DFA) is used to focus on analyzing the multiple fractal features of the pavement settlement rate. The results show that the settlement rates of the highway caused by the tunnel excavation and construction process all show multiple fractal characteristics. The fluctuations in the measurement points above and near the entrance of the tunnel are more complex and intense. Based on the moving-average method (MA), convolutional neural network (CNN), and Extreme Learning Machine (ELM), MA-CNN and MA-ELM prediction models are constructed to predict the settlement value sequences of the fluctuating points. The results indicate that the MA-ELM prediction model demonstrates superior predictive performance (with R2 values of 0.956, 0.950, and 0.979 on the test set). Further, with the help of the Dung Beetle Optimizer (DBO), a meta-heuristic algorithm for parameter optimization, the hybrid model DBO-MA-ELM greatly improves the prediction performance (R2 of 0.975, 0.997, 0.998 for the testing set).
- 25 June 2026
- Published by MDPI AG in Fractal and Fractional
- Vol. 10 (7) , 430
Open AccessMultiple Fractal Analysis and Prediction of the Settlement of the Upper Existing Highway Pavement Induced by Shallow-Buried Tunnel Construction
In recent years, it has become inevitable to dig underneath existing highways when excavating tunnels. The soil settlement induced by ground excavation may adversely affect existing highways. In this study, a settlement monitoring system is used to obtain the settlement sequence of multiple measurement points on the pavement. Multifractal detrended fluctuation analysis (MF-DFA) is used to focus on analyzing the multiple fractal features of the pavement settlement rate. The results show that the settlement rates of the highway caused by the tunnel excavation and construction process all show multiple fractal characteristics. The fluctuations in the measurement points above and near the entrance of the tunnel are more complex and intense. Based on the moving-average method (MA), convolutional neural network (CNN), and Extreme Learning Machine (ELM), MA-CNN and MA-ELM prediction models are constructed to predict the settlement value sequences of the fluctuating points. The results indicate that the MA-ELM prediction model demonstrates superior predictive performance (with R2 values of 0.956, 0.950, and 0.979 on the test set). Further, with the help of the Dung Beetle Optimizer (DBO), a meta-heuristic algorithm for parameter optimization, the hybrid model DBO-MA-ELM greatly improves the prediction performance (R2 of 0.975, 0.997, 0.998 for the testing set).
- Open Access
- 1 June 2026
- Published by MDPI AG in Applied Sciences
- Vol. 16 (11) , 5503
Carbon Emission Calculation and Prediction of Asphalt Pavement Construction in Long Tunnel Based on Hybrid Life Cycle Assessment
Long asphalt tunnels serve as critical infrastructure for urban public transport, yet their construction entails substantial energy consumption and carbon emissions. This study aims to quantify and predict carbon emissions from asphalt pavement construction in long tunnels. Adopting Hybrid Life Cycle Assessment (HLCA), the asphalt paving process is divided into five stages: material production, transportation, on-site paving, milling, and ventilation. Four construction schemes are formulated via detailed calculation and analysis. A carbon emission factor database specific to long tunnel asphalt pavement construction in Guangxi is established, and a quantitative model is developed using the emission coefficient method to calculate carbon emissions of each scheme, among which Scheme 2 is determined as the optimal low-carbon construction scheme. The calculation model is validated via numerical software, and a carbon emission prediction dataset is constructed. Three prediction models, namely GA-BPNN, conventional SVR, and BPNN, are established. The results indicate that the GA-BPNN model achieves the highest predictive accuracy among the three models. This study further improves the calculation and prediction methods for carbon emissions in long tunnel asphalt pavement construction, providing theoretical support for carbon reduction and low-carbon construction management.
- 1 June 2026
- Published by MDPI AG in Applied Sciences
- Vol. 16 (11) , 5503
Open AccessCarbon Emission Calculation and Prediction of Asphalt Pavement Construction in Long Tunnel Based on Hybrid Life Cycle Assessment
Long asphalt tunnels serve as critical infrastructure for urban public transport, yet their construction entails substantial energy consumption and carbon emissions. This study aims to quantify and predict carbon emissions from asphalt pavement construction in long tunnels. Adopting Hybrid Life Cycle Assessment (HLCA), the asphalt paving process is divided into five stages: material production, transportation, on-site paving, milling, and ventilation. Four construction schemes are formulated via detailed calculation and analysis. A carbon emission factor database specific to long tunnel asphalt pavement construction in Guangxi is established, and a quantitative model is developed using the emission coefficient method to calculate carbon emissions of each scheme, among which Scheme 2 is determined as the optimal low-carbon construction scheme. The calculation model is validated via numerical software, and a carbon emission prediction dataset is constructed. Three prediction models, namely GA-BPNN, conventional SVR, and BPNN, are established. The results indicate that the GA-BPNN model achieves the highest predictive accuracy among the three models. This study further improves the calculation and prediction methods for carbon emissions in long tunnel asphalt pavement construction, providing theoretical support for carbon reduction and low-carbon construction management.
- Open Access
- 26 September 2025
- Published by MDPI AG in Applied Sciences
- Vol. 15 (19) , 10465
Research on Deterioration Characteristics of Tuffaceous Sandstone Under Acidic Wet–Dry Cycles
Conducted against the background of a highway project in Zhuji, Zhejiang Province, this study investigates the deterioration behavior of tuffaceous sandstone under the combined action of acid rain and wet–dry cycles. Laboratory experiments were carried out to explore its mechanical properties and damage evolution mechanisms. Standard specimens prepared from field rock samples were subjected to wet–dry cycles using an acidic solution with pH ≈ 5.0. By integrating uniaxial compression, Brazilian splitting, ultrasonic wave monitoring, and acoustic emission techniques, a systematic analysis was carried out to evaluate the degradation of mechanical parameters, the evolution of wave velocity, and the underlying damage and failure mechanisms. The results indicate the following: (1) With the increase in the number of acidic dry–wet cycles, the compressive and tensile strengths of tuffaceous sandstone decrease significantly; the deterioration rate first decreases and then increases, with 150 cycles identified as the critical threshold for strength deterioration, beyond which the material enters a stage of rapid degradation. (2) The evolution of ultrasonic wave velocity shows a significant negative correlation with strength deterioration, and the attenuation rate of wave velocity exhibits a consistent trend with the number of cycles as that of strength deterioration. (3) Acoustic emission RA-AF analysis reveals that tensile cracks in tuffaceous sandstone gradually decrease while shear cracks slowly increase, with cracks primarily developing along the weakly cemented tuffaceous areas. (4) This study established fitting formulas for the deterioration of compressive and tensile strengths with the number of cycles, as well as a damage calculation formula based on changes in wave velocity. (5) This study provides practical support for mitigating natural disasters, such as slope instability, induced by this type of combined weathering.
- 26 September 2025
- Published by MDPI AG in Applied Sciences
- Vol. 15 (19) , 10465
Open AccessResearch on Deterioration Characteristics of Tuffaceous Sandstone Under Acidic Wet–Dry Cycles
Conducted against the background of a highway project in Zhuji, Zhejiang Province, this study investigates the deterioration behavior of tuffaceous sandstone under the combined action of acid rain and wet–dry cycles. Laboratory experiments were carried out to explore its mechanical properties and damage evolution mechanisms. Standard specimens prepared from field rock samples were subjected to wet–dry cycles using an acidic solution with pH ≈ 5.0. By integrating uniaxial compression, Brazilian splitting, ultrasonic wave monitoring, and acoustic emission techniques, a systematic analysis was carried out to evaluate the degradation of mechanical parameters, the evolution of wave velocity, and the underlying damage and failure mechanisms. The results indicate the following: (1) With the increase in the number of acidic dry–wet cycles, the compressive and tensile strengths of tuffaceous sandstone decrease significantly; the deterioration rate first decreases and then increases, with 150 cycles identified as the critical threshold for strength deterioration, beyond which the material enters a stage of rapid degradation. (2) The evolution of ultrasonic wave velocity shows a significant negative correlation with strength deterioration, and the attenuation rate of wave velocity exhibits a consistent trend with the number of cycles as that of strength deterioration. (3) Acoustic emission RA-AF analysis reveals that tensile cracks in tuffaceous sandstone gradually decrease while shear cracks slowly increase, with cracks primarily developing along the weakly cemented tuffaceous areas. (4) This study established fitting formulas for the deterioration of compressive and tensile strengths with the number of cycles, as well as a damage calculation formula based on changes in wave velocity. (5) This study provides practical support for mitigating natural disasters, such as slope instability, induced by this type of combined weathering.
- Open Access
Investigation of Borehole Network Parameters for Rock Breaking via High-Pressure Gas Expansion in Subway Safety Passages of Environmentally Sensitive Zones
To address the challenge of determining the borehole layout scheme in the practical application of high-pressure gas expansion rock breaking, this study takes the excavation of the safety passage at Kaixuan Road Station on the North Extension Line 2 of Chongqing Metro Line 18 as the engineering background. The rock-breaking capacity was evaluated by analyzing the damaged zone volume caused by gas expansion using FLAC3D 6.0 numerical simulation software, and vibration monitoring was conducted for the historical buildings on the surface. This study revealed the following: (1) When the borehole depth is 1.2 m and the charge length is 0.6 m, the optimal angle is 70°, with the optimal vertical and horizontal spacing between holes being 1200 mm and 2000 mm, respectively. (2) The numerical simulations indicated that by adjusting the charge density, the optimized sandstone borehole network parameters could be applied to mudstone strata, and the rock-breaking effect was similar. The difference in the volume of the damaged zones obtained in the two strata was less than 3%. (3) The vibration analysis demonstrated that the peak particle velocity generated by high-pressure gas expansion rock fracturing at the ancient building directly above was 0.06316 cm/s, which was lower than the threshold value of 0.1 cm/s and approximately 67.95% lower than that of explosive blasting. Furthermore, when the tunnel depth exceeded 29 m, the vibration velocity of surface structures remained within the safety range. The results verified the feasibility of applying the same borehole network parameters to different strata, providing theoretical support for the practical application of high-pressure gas expansion rock fracturing technology in engineering projects.
Open AccessInvestigation of Borehole Network Parameters for Rock Breaking via High-Pressure Gas Expansion in Subway Safety Passages of Environmentally Sensitive Zones
To address the challenge of determining the borehole layout scheme in the practical application of high-pressure gas expansion rock breaking, this study takes the excavation of the safety passage at Kaixuan Road Station on the North Extension Line 2 of Chongqing Metro Line 18 as the engineering background. The rock-breaking capacity was evaluated by analyzing the damaged zone volume caused by gas expansion using FLAC3D 6.0 numerical simulation software, and vibration monitoring was conducted for the historical buildings on the surface. This study revealed the following: (1) When the borehole depth is 1.2 m and the charge length is 0.6 m, the optimal angle is 70°, with the optimal vertical and horizontal spacing between holes being 1200 mm and 2000 mm, respectively. (2) The numerical simulations indicated that by adjusting the charge density, the optimized sandstone borehole network parameters could be applied to mudstone strata, and the rock-breaking effect was similar. The difference in the volume of the damaged zones obtained in the two strata was less than 3%. (3) The vibration analysis demonstrated that the peak particle velocity generated by high-pressure gas expansion rock fracturing at the ancient building directly above was 0.06316 cm/s, which was lower than the threshold value of 0.1 cm/s and approximately 67.95% lower than that of explosive blasting. Furthermore, when the tunnel depth exceeded 29 m, the vibration velocity of surface structures remained within the safety range. The results verified the feasibility of applying the same borehole network parameters to different strata, providing theoretical support for the practical application of high-pressure gas expansion rock fracturing technology in engineering projects.
- Open Access
- 31 August 2025
- Published by MDPI AG in Applied Sciences
- Vol. 15 (17) , 9616
Feasibility and Optimization Study on the Replacement of Core Rock Columns with Temporary Steel Supports in the Construction of Large-Section Subway Tunnels in Interbedded Rock Masses
With the development of subway transportation, how to excavate large-section tunnels and find more convenient and reliable support methods has become an issue that cannot be ignored. This paper addresses issues such as low construction efficiency of core rock columns during the construction of large-section subway tunnels in sandstone–mudstone interbedded geological conditions. It proposes an optimized support scheme that replaces traditional core rock columns with temporary steel supports (steel columns). Finite element analysis was used to compare the deformation of the surrounding rock when retaining the core rock columns, using temporary steel columns to replace the core rock columns, and not providing additional support. Five interlayer positions and four interlayer angles were analyzed to identify the most dangerous geological conditions. Based on this analysis, the reasonable spacing of the temporary steel columns was investigated. The results indicate that temporary steel columns and core rock columns can effectively reduce vertical deformation of the surrounding rock, with steel columns showing slightly better results. Replacing core rock columns with steel columns is feasible. To control tunnel rock mass deformation, this project should ensure that the spacing between temporary steel columns is maintained between 21.88 m and 56.80 m. However, in construction sections with good rock mass conditions, the spacing can be extended as long as safety is ensured.
- 31 August 2025
- Published by MDPI AG in Applied Sciences
- Vol. 15 (17) , 9616
Open AccessFeasibility and Optimization Study on the Replacement of Core Rock Columns with Temporary Steel Supports in the Construction of Large-Section Subway Tunnels in Interbedded Rock Masses
With the development of subway transportation, how to excavate large-section tunnels and find more convenient and reliable support methods has become an issue that cannot be ignored. This paper addresses issues such as low construction efficiency of core rock columns during the construction of large-section subway tunnels in sandstone–mudstone interbedded geological conditions. It proposes an optimized support scheme that replaces traditional core rock columns with temporary steel supports (steel columns). Finite element analysis was used to compare the deformation of the surrounding rock when retaining the core rock columns, using temporary steel columns to replace the core rock columns, and not providing additional support. Five interlayer positions and four interlayer angles were analyzed to identify the most dangerous geological conditions. Based on this analysis, the reasonable spacing of the temporary steel columns was investigated. The results indicate that temporary steel columns and core rock columns can effectively reduce vertical deformation of the surrounding rock, with steel columns showing slightly better results. Replacing core rock columns with steel columns is feasible. To control tunnel rock mass deformation, this project should ensure that the spacing between temporary steel columns is maintained between 21.88 m and 56.80 m. However, in construction sections with good rock mass conditions, the spacing can be extended as long as safety is ensured.
- Open Access
- 25 July 2025
- Published by Association for Computing Machinery (ACM)
- p. 55-63
Numerical Simulation of Tunnel Blasting Based on Digital Detonator Initiation
- 25 July 2025
- Published by Association for Computing Machinery (ACM)
- p. 55-63
Open AccessNumerical Simulation of Tunnel Blasting Based on Digital Detonator Initiation
- Open Access
- 17 April 2025
- Published by MDPI AG in Fractal and Fractional
- Vol. 9 (4) , 254
Compression Damage Precursors of Silane-Protected Concrete Under Sulfate Erosion Based on Acoustic Emission Characterization
Concrete materials exposed to sulfate-rich geological environments are prone to structural durability degradation due to chemical erosion. Silane-based protective materials can enhance the durability of concrete structures under harsh environmental conditions. This study investigates the evolution of acoustic emission (AE) precursor characteristics in silane-protected, sulfate-eroded concrete specimens during uniaxial compression failure. Unlike existing research focused primarily on protective material properties, this work establishes a novel framework linking “silane treatment–AE parameters–failure precursor identification”, thereby bridging the research gap in damage evolution analysis of sulfate-eroded concrete under silane protection. Uniaxial compressive strength tests and AE monitoring were conducted on both silane-protected and unprotected sulfate-eroded concrete specimens. A diagnostic system integrating dynamic analysis of the acoustic emission b-value, mutation detection of energy concentration index ρ, and multifractal detrended fluctuation analysis (MF-DFA) was developed. The results demonstrate that silane-protected specimens exhibited a distinct b-value escalation followed by an abrupt decline prior to peak load, whereas unprotected specimens showed disordered fluctuations. The mutation point of energy concentration ρ for silane-protected specimens occurred at 0.83 σc, representing a 9.2% threshold elevation compared to 0.76 σc for unprotected specimens, confirming delayed damage accumulation in protected specimens. MF-DFA revealed narrowing spectrum width () in unprotected specimens, indicating reduced heterogeneity in AE signals, while protected specimens maintained significant multifractal divergence. peak localization revealed that weak AE signals dominated during early loading stages in both groups, with crack evolution primarily involving sliding and friction. During the mid-late elastic phase, crack propagation became the predominant failure mode. Experimental evidence confirms the engineering significance of silane protection in extending service life of concrete structures in sulfate environments. The proposed multi-parameter AE diagnostic methodology provides quantitative criteria for the safety monitoring of protected concrete structures in sulfate-rich conditions.- 17 April 2025
- Published by MDPI AG in Fractal and Fractional
- Vol. 9 (4) , 254
Open AccessCompression Damage Precursors of Silane-Protected Concrete Under Sulfate Erosion Based on Acoustic Emission Characterization
Concrete materials exposed to sulfate-rich geological environments are prone to structural durability degradation due to chemical erosion. Silane-based protective materials can enhance the durability of concrete structures under harsh environmental conditions. This study investigates the evolution of acoustic emission (AE) precursor characteristics in silane-protected, sulfate-eroded concrete specimens during uniaxial compression failure. Unlike existing research focused primarily on protective material properties, this work establishes a novel framework linking “silane treatment–AE parameters–failure precursor identification”, thereby bridging the research gap in damage evolution analysis of sulfate-eroded concrete under silane protection. Uniaxial compressive strength tests and AE monitoring were conducted on both silane-protected and unprotected sulfate-eroded concrete specimens. A diagnostic system integrating dynamic analysis of the acoustic emission b-value, mutation detection of energy concentration index ρ, and multifractal detrended fluctuation analysis (MF-DFA) was developed. The results demonstrate that silane-protected specimens exhibited a distinct b-value escalation followed by an abrupt decline prior to peak load, whereas unprotected specimens showed disordered fluctuations. The mutation point of energy concentration ρ for silane-protected specimens occurred at 0.83 σc, representing a 9.2% threshold elevation compared to 0.76 σc for unprotected specimens, confirming delayed damage accumulation in protected specimens. MF-DFA revealed narrowing spectrum width () in unprotected specimens, indicating reduced heterogeneity in AE signals, while protected specimens maintained significant multifractal divergence. peak localization revealed that weak AE signals dominated during early loading stages in both groups, with crack evolution primarily involving sliding and friction. During the mid-late elastic phase, crack propagation became the predominant failure mode. Experimental evidence confirms the engineering significance of silane protection in extending service life of concrete structures in sulfate environments. The proposed multi-parameter AE diagnostic methodology provides quantitative criteria for the safety monitoring of protected concrete structures in sulfate-rich conditions. - Open Access
- 17 January 2025
- Published by MDPI AG in Mathematics
- Vol. 13 (2) , 286
Analytical Solution for Surrounding Rock Pressure of Deep-Buried Four-Hole Closely Spaced Double-Arch Tunnel
Research on the calculation method of deep-buried surrounding rock pressure is an important subject in engineering mathematics. The existing calculation methods are mainly the two-hole closely spaced tunnel, double-arch tunnel, three-hole closely spaced tunnel, and three-arch tunnel. The four-hole closely spaced double-arch tunnel has the characteristics of both the double-arch tunnel and closely spaced tunnel, and its surrounding rock pressure distribution is more complicated. In this paper, the research is carried out based on Protodyakonov’s theory and the concept of process load. The influence of the post-construction tunnel on the supporting structure of the pre-construction tunnel is also considered. The calculation model of the surrounding rock pressure of the deep-buried four-hole closely spaced double-arch tunnel is established, and the calculation formula of the surrounding rock pressure is deduced and verified. Finally, the influences of the rock column parameters, excavation procedure, tunnel span, and middle partition wall on the surrounding rock pressure are analyzed.
- 17 January 2025
- Published by MDPI AG in Mathematics
- Vol. 13 (2) , 286
Open AccessAnalytical Solution for Surrounding Rock Pressure of Deep-Buried Four-Hole Closely Spaced Double-Arch Tunnel
Research on the calculation method of deep-buried surrounding rock pressure is an important subject in engineering mathematics. The existing calculation methods are mainly the two-hole closely spaced tunnel, double-arch tunnel, three-hole closely spaced tunnel, and three-arch tunnel. The four-hole closely spaced double-arch tunnel has the characteristics of both the double-arch tunnel and closely spaced tunnel, and its surrounding rock pressure distribution is more complicated. In this paper, the research is carried out based on Protodyakonov’s theory and the concept of process load. The influence of the post-construction tunnel on the supporting structure of the pre-construction tunnel is also considered. The calculation model of the surrounding rock pressure of the deep-buried four-hole closely spaced double-arch tunnel is established, and the calculation formula of the surrounding rock pressure is deduced and verified. Finally, the influences of the rock column parameters, excavation procedure, tunnel span, and middle partition wall on the surrounding rock pressure are analyzed.
- Open Access
Study on the Vibration Propagation Law and Stress Distribution Characteristics in Double-Arch Tunnels During Blasting
Highway tunnel construction in mountainous areas of China has been developing rapidly. The influence of drilling and blasting on the existing tunnel structure has become a key factor affecting the safety and stability of tunnel construction. The double-arch tunnel has unique structural characteristics. The propagation characteristics of blasting vibrations and the resulting stress responses exhibit a certain level of complexity. There is little research on the influence of single-line blasting excavation of double-arch tunnel on the other line tunnel. This paper analyzes the blasting vibration of a double-arch tunnel by ANSYS/LS-DYNA. The propagation law of blasting vibration velocity and stress distribution law of blasting vibration in different sections of the tunnel is revealed. At the same time, the relationship between the peak particle velocity (PPV) and tensile stress is established, and the threshold vibration velocity is proposed. It provides a scientific basis for tunnel design and construction. The propagation of blasting vibration in the adjacent roadway is affected by the middle pilot tunnel. The peak vibration velocity of different parts decreases with the increase in distance. The monitoring of vibration velocity and stress in section A of the right line of the adjacent tunnel should be strengthened, especially in the tunnel vault, blast-facing side wall, and arch foot. The difference in vibration strength across different tunnel parts provides a basis for optimizing the structure. It helps strengthen the parts susceptible to vibration during the design stage of the multi-arch tunnel, improving the tunnel’s safety and stability.
Open AccessStudy on the Vibration Propagation Law and Stress Distribution Characteristics in Double-Arch Tunnels During Blasting
Highway tunnel construction in mountainous areas of China has been developing rapidly. The influence of drilling and blasting on the existing tunnel structure has become a key factor affecting the safety and stability of tunnel construction. The double-arch tunnel has unique structural characteristics. The propagation characteristics of blasting vibrations and the resulting stress responses exhibit a certain level of complexity. There is little research on the influence of single-line blasting excavation of double-arch tunnel on the other line tunnel. This paper analyzes the blasting vibration of a double-arch tunnel by ANSYS/LS-DYNA. The propagation law of blasting vibration velocity and stress distribution law of blasting vibration in different sections of the tunnel is revealed. At the same time, the relationship between the peak particle velocity (PPV) and tensile stress is established, and the threshold vibration velocity is proposed. It provides a scientific basis for tunnel design and construction. The propagation of blasting vibration in the adjacent roadway is affected by the middle pilot tunnel. The peak vibration velocity of different parts decreases with the increase in distance. The monitoring of vibration velocity and stress in section A of the right line of the adjacent tunnel should be strengthened, especially in the tunnel vault, blast-facing side wall, and arch foot. The difference in vibration strength across different tunnel parts provides a basis for optimizing the structure. It helps strengthen the parts susceptible to vibration during the design stage of the multi-arch tunnel, improving the tunnel’s safety and stability.
- 15 November 2024
- Published by Springer Nature in Journal of Civil Structural Health Monitoring
- Vol. 15 (4) , 1271-1287
Clustering evaluation of internal structural defects in ancient and replica antique green bricks based on ultrasonic detection
- 15 November 2024
- Published by Springer Nature in Journal of Civil Structural Health Monitoring
- Vol. 15 (4) , 1271-1287
Clustering evaluation of internal structural defects in ancient and replica antique green bricks based on ultrasonic detection