SWShanshan Wu

Shanshan Wu

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Shanshan Wu has a total of 7 co-authors. Here are the top co-authors by number of shared publications:

  • Gen Qiao

    Faculty of Railway and Architecture, Chongqing Vocational College of Public Transportation, Chongqing, China

    2 shared publications
  • Shek Poi Ngian

    Faculty of Civil Engineering, Universiti Teknologi Malaysia, Johor Bahru, Johor, Malaysia

    2 shared publications
  • Baharin Bin Mesir

    Faculty of Civil Engineering, Universiti Teknologi Malaysia, Johor Bahru, Johor, Malaysia

    1 shared publication
  • Bolin Jiang

    Department of Science and Technology, Chongqing Vocational Institute of Engineering, Chongqing, China

    1 shared publication
  • Mohd Zamri Ramli

    Faculty of Civil Engineering, Universiti Teknologi Malaysia, Johor Bahru, Johor, Malaysia

    1 shared publication
  • Mohd Zamri Ramli

    Faculty of Civil Enginnering, Universiti Teknologi Malaysia, Johor Bahru, Malaysia

    1 shared publication

Latest Publications

  • Open Access

    Real-Time Synchronization of Building Information Modelling (BIM) and Windows Forms Application (WFA)

    by Shanshan Wu, Mohd Zamri Ramli, Shek Poi Ngian, Baharin Bin Mesir, Gen Qiao, Yan Chen

    In order to promote the digital transformation of the AEC engineering industry towards data-driven high-quality development, efficient information integration and real-time synchronization of Building Information Modelling (BIM) are crucial. However, existing research, especially in the field of bridges, is not deep and mature enough. Therefore, this study aims to develop a Windows Forms Application (WFA) based system for rapid modelling and real-time synchronization in the BIM software. The four main objectives are as follows: the development of structural parameter acquisition application for steel box girder bridge; the secondary development of 3D modeling software; the development of the BIM co-design platform for steel box girder-bridge; and the study of the application of the BIM co-design platform for steel box girder bridge in the project. To achieve these objectives, a software development life cycle (SDLC) approach is used to develop a system applied to steel box girder bridges through five phases: planning, analysis, design, implementation, and testing. Fundamentally, the platform consisting of the developed WFA and BIM software saves resources, dramatically reduces repetitive work, ensures the effectiveness of model information transfer and real-time data update, improves information integration of steel box girder bridges, and realizes the construction of a digital city.