HLHui Li

Hui Li

*This is an algorithmically generated author record based on publicly available information.

Hui Li has a total of 9 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Research on the Initial Launching Technology of Subway Shield Tunneling in Complex Terrain and Numerical Simulation of Soil Deformation

    by Jiangka Wang, Hui Li, Xujie Li, Xingzhong Nong, Chen Liu, Tao Yang

    Using the shield project of the Cai Cang Section tunnel of the Guangzhou Metro Line 13 to solve the problem that shield construction is difficult to start in a narrow space and it is easy to disturb the surrounding buildings and pipelines, the corresponding shield tunneling parameters, construction and transportation plans, residual soil management plans, and grouting reinforcement plans are designed. These are tailored according to different working conditions. Meanwhile, the MIDAS GTS 2022 numerical simulation software is applied to simulate and analyze the impact of shield tunneling construction on soil deformation, and to compare the effects before and after reinforcement of the soil layer during shield tunneling. The results show the amount of disturbance of building pipelines along the tunnel are effectively controlled by designing the corresponding shield tunneling parameters for three working conditions: contact reinforcement zone, entering reinforcement zone, and exiting reinforcement zone. In narrow spaces, three kinds of construction transportation modes (namely, horizontal transportation in the tunnel, translation transportation in the cross passage, and vertical transportation) ensure the smooth transportation of pipe segments and the smooth discharge of shield dregs. After the reinforced area is constructed, secondary grouting with cement mortar effectively reduces the erosion concrete segments by underground water. By comparing the deformation of the tunnel soil layer before and after reinforcement, it is found that the maximum surface deformation of the soil layer is significantly reduced after reinforcement. Specifically, the maximum settlement and maximum uplift are 0.782 mm and 1.87 mm respectively, which represent a reduction of 1.548 mm in the maximum surface settlement, and 0.16 mm in the maximum uplift compared with the unreinforced soil layer. This indicates that setting up a soil reinforcement zone during the initial launching stage can effectively reduce soil deformation. The Cai Cang Section tunnel shield project successfully completed the shield construction in a narrow space, which can be a reference and guide for similar projects.


  • Open Access

    Construction Scheme and Influence Analysis of Horizontal Small-Clear-Distance Shield Tunnel

    by Xujie Li, Hui Li, Yabin Cheng, Bing Zhang, Ming Qiao, Tao Yang

    Based on the construction project of Guangzhou Metro Line 13, this paper explores the special construction scheme for the safety of horizontal small-clear-distance shield tunnel construction, which adopts the construction of a tunnel first and a station later in the actual project to reduce the impact on the tunnel segment and the existing bridge piles. At the same time, the MIDAS GTS(2022R1) geotechnical and structural finite element analysis software is used to simulate and analyze the shield excavation process by using the stratum–structure modeling method, and the effect of grouting reinforcement in the tunnel is compared and analyzed. Through the research and analysis of the displacement and deformation of the model, the rationality and effectiveness of grouting reinforcement are explored to ensure the smooth implementation of the special construction scheme. The test results show that the implementation of grouting reinforcement measures in the tunnel can effectively control the horizontal deformation of the existing bridge piles and the horizontal deformation of the left line segment of the small-clear-distance section, and the above two deformation indexes are reduced by 67.7% and 72.1%, respectively, compared with the non-reinforcement condition. The settlement deformation of the segment and the surrounding existing bridge piles meets the requirements of the code, so the construction scheme is basically feasible.