Ming Qiao
Research Subjects
Ming Qiao has a total of 5 co-authors. Here are the top co-authors by number of shared publications:
- Bing Zhang
China Railway (Guangzhou) Investment & Development Co., Ltd., Guangzhou 510335, China
1 shared publication - Hui Li
China Railway (Guangzhou) Investment & Development Co., Ltd., Guangzhou 510620, China
1 shared publication - Tao Yang
School of Urban Planning and Municipal Engineering, Xi’an Polytechnic University, Xi’an 710600, China
1 shared publication - Xujie Li
China Railway (Guangzhou) Investment & Development Co., Ltd., Guangzhou 510620, China
1 shared publication - Yabin Cheng
China Railway (Guangzhou) Investment & Development Co., Ltd., Guangzhou 510335, China
1 shared publication
Latest Publications
- Open Access
Construction Scheme and Influence Analysis of Horizontal Small-Clear-Distance Shield Tunnel
Based on the construction project of Guangzhou Metro Line 13, this paper explores the special construction scheme for the safety of horizontal small-clear-distance shield tunnel construction, which adopts the construction of a tunnel first and a station later in the actual project to reduce the impact on the tunnel segment and the existing bridge piles. At the same time, the MIDAS GTS(2022R1) geotechnical and structural finite element analysis software is used to simulate and analyze the shield excavation process by using the stratum–structure modeling method, and the effect of grouting reinforcement in the tunnel is compared and analyzed. Through the research and analysis of the displacement and deformation of the model, the rationality and effectiveness of grouting reinforcement are explored to ensure the smooth implementation of the special construction scheme. The test results show that the implementation of grouting reinforcement measures in the tunnel can effectively control the horizontal deformation of the existing bridge piles and the horizontal deformation of the left line segment of the small-clear-distance section, and the above two deformation indexes are reduced by 67.7% and 72.1%, respectively, compared with the non-reinforcement condition. The settlement deformation of the segment and the surrounding existing bridge piles meets the requirements of the code, so the construction scheme is basically feasible.
Open AccessConstruction Scheme and Influence Analysis of Horizontal Small-Clear-Distance Shield Tunnel
Based on the construction project of Guangzhou Metro Line 13, this paper explores the special construction scheme for the safety of horizontal small-clear-distance shield tunnel construction, which adopts the construction of a tunnel first and a station later in the actual project to reduce the impact on the tunnel segment and the existing bridge piles. At the same time, the MIDAS GTS(2022R1) geotechnical and structural finite element analysis software is used to simulate and analyze the shield excavation process by using the stratum–structure modeling method, and the effect of grouting reinforcement in the tunnel is compared and analyzed. Through the research and analysis of the displacement and deformation of the model, the rationality and effectiveness of grouting reinforcement are explored to ensure the smooth implementation of the special construction scheme. The test results show that the implementation of grouting reinforcement measures in the tunnel can effectively control the horizontal deformation of the existing bridge piles and the horizontal deformation of the left line segment of the small-clear-distance section, and the above two deformation indexes are reduced by 67.7% and 72.1%, respectively, compared with the non-reinforcement condition. The settlement deformation of the segment and the surrounding existing bridge piles meets the requirements of the code, so the construction scheme is basically feasible.