Danqing Chen
Danqing Chen has a total of 8 co-authors. Here are the top co-authors by number of shared publications:
- Feng Li
Grid Planning and Research Centre, Guangdong Power Grid Co., Ltd., Guangzhou 510000, China
2 shared publications - Guoteng Wang
College of Electrical Engineering, Zhejiang University, Hangzhou 310027, China
2 shared publications - Hao Yu
Grid Planning & Research Center of Guangdong Power Grid Co., Ltd., Guangzhou 510060, China
2 shared publications - Honglin Chen
Grid Planning & Research Center of Guangdong Power Grid Co., Ltd., Guangzhou 510060, China
2 shared publications - Shuxin Luo
Power Grid Planning and Research Center, Guangdong Power Grid Co., Ltd., Guangzhou 510080, China
2 shared publications - Ying Huang
College of Electrical Engineering, Zhejiang University, Hangzhou 310027, China
2 shared publications
Latest Publications
- Open Access
- 11 August 2025
- Published by MDPI AG in Electronics
- Vol. 14 (16) , 3195
Topology Selection for Large-Scale Offshore Wind Power HVDC Direct Transmission to Load Centers: Influencing Factors and Construction Principles
The development and utilization of large-scale offshore wind power (OWP) are critical measures for achieving global energy transition. To address the demands of future large-scale OWP centralized development and transmission, this study systematically investigates the influencing factors and construction principles for topology selection in offshore wind power high-voltage direct current (HVDC) transmission systems delivering power to load centers. First, under the context of expanding the offshore wind power transmission scale, the necessity of transmitting OWP via HVDC overhead lines directly to load centers after landing is theoretically discussed. Five key topological influencing factors are then analyzed: offshore wind power collection schemes, multi-terminal HVDC network configurations, DC fault isolation mechanisms, offshore converter station architectures, and voltage source converter HVDC (VSC-HVDC) receiving terminal landing modes. Corresponding topology construction principles for direct HVDC transmission to load centers are proposed to guide system design. Finally, the feasibility of the proposed principles is validated through a case study of a multi-terminal HVDC system integrated into an actual regional power grid, demonstrating practical applicability.
- 11 August 2025
- Published by MDPI AG in Electronics
- Vol. 14 (16) , 3195
Open AccessTopology Selection for Large-Scale Offshore Wind Power HVDC Direct Transmission to Load Centers: Influencing Factors and Construction Principles
The development and utilization of large-scale offshore wind power (OWP) are critical measures for achieving global energy transition. To address the demands of future large-scale OWP centralized development and transmission, this study systematically investigates the influencing factors and construction principles for topology selection in offshore wind power high-voltage direct current (HVDC) transmission systems delivering power to load centers. First, under the context of expanding the offshore wind power transmission scale, the necessity of transmitting OWP via HVDC overhead lines directly to load centers after landing is theoretically discussed. Five key topological influencing factors are then analyzed: offshore wind power collection schemes, multi-terminal HVDC network configurations, DC fault isolation mechanisms, offshore converter station architectures, and voltage source converter HVDC (VSC-HVDC) receiving terminal landing modes. Corresponding topology construction principles for direct HVDC transmission to load centers are proposed to guide system design. Finally, the feasibility of the proposed principles is validated through a case study of a multi-terminal HVDC system integrated into an actual regional power grid, demonstrating practical applicability.
- Open Access
- 23 June 2025
- Published by MDPI AG in Electronics
- Vol. 14 (13) , 2543
Black-Start Strategy for Offshore Wind Power Delivery System Based on Series-Connected DRU-MMC Hybrid Converter
The series-connected DRU-MMC hybrid converter, with its compact size and cost-effectiveness, presents an attractive solution for long-distance offshore wind power transmission. However, its application is limited by the DRU’s unidirectional power flow and the voltage mismatch between the auxiliary MMC and the onshore MMC during black-start operations. To overcome these challenges, a four-stage black-start strategy utilizing an auxiliary step-down transformer connected to the onshore MMC is proposed. The proposed strategy operates as follows: The onshore MMC first lowers its valve-side voltage via an auxiliary transformer, enabling reduced DC-side voltage. With the DRU bypassed, the offshore MMC draws startup power through the DC link, then switches to V/f mode with wind turbine curtailment to reduce DC current below the DRU bypass threshold. After stable, low-power operation, the DRU is integrated. The onshore MMC then restores rated DC voltage and disconnects the transformer, allowing gradual wind turbine reconnection to complete black-start. The simulation results confirm the approach’s feasibility under conditions where all wind turbines operate in grid-following mode.
- 23 June 2025
- Published by MDPI AG in Electronics
- Vol. 14 (13) , 2543
Open AccessBlack-Start Strategy for Offshore Wind Power Delivery System Based on Series-Connected DRU-MMC Hybrid Converter
The series-connected DRU-MMC hybrid converter, with its compact size and cost-effectiveness, presents an attractive solution for long-distance offshore wind power transmission. However, its application is limited by the DRU’s unidirectional power flow and the voltage mismatch between the auxiliary MMC and the onshore MMC during black-start operations. To overcome these challenges, a four-stage black-start strategy utilizing an auxiliary step-down transformer connected to the onshore MMC is proposed. The proposed strategy operates as follows: The onshore MMC first lowers its valve-side voltage via an auxiliary transformer, enabling reduced DC-side voltage. With the DRU bypassed, the offshore MMC draws startup power through the DC link, then switches to V/f mode with wind turbine curtailment to reduce DC current below the DRU bypass threshold. After stable, low-power operation, the DRU is integrated. The onshore MMC then restores rated DC voltage and disconnects the transformer, allowing gradual wind turbine reconnection to complete black-start. The simulation results confirm the approach’s feasibility under conditions where all wind turbines operate in grid-following mode.