Xingzhong Nong
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Xingzhong Nong has a total of 5 co-authors. Here are the top co-authors by number of shared publications:
- Chen Liu
China Railway (Guangzhou) Investment & Development Co., Ltd., Guangzhou 510620, China
1 shared publication - Hui Li
China Railway (Guangzhou) Investment & Development Co., Ltd., Guangzhou 510620, China
1 shared publication - Tao Yang
School of Urban Planning and Municipal Engineering, Xi’an Polytechnic University, Xi’an 710600, China
1 shared publication - Xujie Li
China Railway (Guangzhou) Investment & Development Co., Ltd., Guangzhou 510620, China
1 shared publication - Xujie Li
China Railway (Guangzhou) Investment & Development Co., Ltd., Guangzhou 510620, China
1 shared publication
Latest Publications
- Open Access
Research on the Initial Launching Technology of Subway Shield Tunneling in Complex Terrain and Numerical Simulation of Soil Deformation
Using the shield project of the Cai Cang Section tunnel of the Guangzhou Metro Line 13 to solve the problem that shield construction is difficult to start in a narrow space and it is easy to disturb the surrounding buildings and pipelines, the corresponding shield tunneling parameters, construction and transportation plans, residual soil management plans, and grouting reinforcement plans are designed. These are tailored according to different working conditions. Meanwhile, the MIDAS GTS 2022 numerical simulation software is applied to simulate and analyze the impact of shield tunneling construction on soil deformation, and to compare the effects before and after reinforcement of the soil layer during shield tunneling. The results show the amount of disturbance of building pipelines along the tunnel are effectively controlled by designing the corresponding shield tunneling parameters for three working conditions: contact reinforcement zone, entering reinforcement zone, and exiting reinforcement zone. In narrow spaces, three kinds of construction transportation modes (namely, horizontal transportation in the tunnel, translation transportation in the cross passage, and vertical transportation) ensure the smooth transportation of pipe segments and the smooth discharge of shield dregs. After the reinforced area is constructed, secondary grouting with cement mortar effectively reduces the erosion concrete segments by underground water. By comparing the deformation of the tunnel soil layer before and after reinforcement, it is found that the maximum surface deformation of the soil layer is significantly reduced after reinforcement. Specifically, the maximum settlement and maximum uplift are 0.782 mm and 1.87 mm respectively, which represent a reduction of 1.548 mm in the maximum surface settlement, and 0.16 mm in the maximum uplift compared with the unreinforced soil layer. This indicates that setting up a soil reinforcement zone during the initial launching stage can effectively reduce soil deformation. The Cai Cang Section tunnel shield project successfully completed the shield construction in a narrow space, which can be a reference and guide for similar projects.
Open AccessResearch on the Initial Launching Technology of Subway Shield Tunneling in Complex Terrain and Numerical Simulation of Soil Deformation
Using the shield project of the Cai Cang Section tunnel of the Guangzhou Metro Line 13 to solve the problem that shield construction is difficult to start in a narrow space and it is easy to disturb the surrounding buildings and pipelines, the corresponding shield tunneling parameters, construction and transportation plans, residual soil management plans, and grouting reinforcement plans are designed. These are tailored according to different working conditions. Meanwhile, the MIDAS GTS 2022 numerical simulation software is applied to simulate and analyze the impact of shield tunneling construction on soil deformation, and to compare the effects before and after reinforcement of the soil layer during shield tunneling. The results show the amount of disturbance of building pipelines along the tunnel are effectively controlled by designing the corresponding shield tunneling parameters for three working conditions: contact reinforcement zone, entering reinforcement zone, and exiting reinforcement zone. In narrow spaces, three kinds of construction transportation modes (namely, horizontal transportation in the tunnel, translation transportation in the cross passage, and vertical transportation) ensure the smooth transportation of pipe segments and the smooth discharge of shield dregs. After the reinforced area is constructed, secondary grouting with cement mortar effectively reduces the erosion concrete segments by underground water. By comparing the deformation of the tunnel soil layer before and after reinforcement, it is found that the maximum surface deformation of the soil layer is significantly reduced after reinforcement. Specifically, the maximum settlement and maximum uplift are 0.782 mm and 1.87 mm respectively, which represent a reduction of 1.548 mm in the maximum surface settlement, and 0.16 mm in the maximum uplift compared with the unreinforced soil layer. This indicates that setting up a soil reinforcement zone during the initial launching stage can effectively reduce soil deformation. The Cai Cang Section tunnel shield project successfully completed the shield construction in a narrow space, which can be a reference and guide for similar projects.