Yaoyu Zhu
Research Subjects
Research Interests
Yaoyu Zhu has a total of 17 co-authors. Here are the top co-authors by number of shared publications:
Li Zhu
2 shared publicationsDangxian Xu
1 shared publicationGuan-Yuan Zhao
1 shared publicationHai-Lin Wu
1 shared publication- Huadong Cheng
Shanghai Institute of Optics and Fine Mechanics
1 shared publication Jia-Huan Li
1 shared publication
Latest Publications
- Open Access
- 14 December 2025
- Published by Association for Computing Machinery (ACM)
- p. 96-101
Fatigue Life evaluation of Bridge Cables Considering Corrosion Development
- 14 December 2025
- Published by Association for Computing Machinery (ACM)
- p. 96-101
Open AccessFatigue Life evaluation of Bridge Cables Considering Corrosion Development
- 11 November 2025
- Published by Elsevier in Measurement
- Vol. 259
A feature point matching approach based on deep learning for structural vibration displacement measurement
- 11 November 2025
- Published by Elsevier in Measurement
- Vol. 259
A feature point matching approach based on deep learning for structural vibration displacement measurement
- Open Access
- 15 July 2025
- Published by Elsevier in Case Studies in Construction Materials
- Vol. 23
Study and evaluation method of concrete erosion under a wind–sand flow load
- 15 July 2025
- Published by Elsevier in Case Studies in Construction Materials
- Vol. 23
Open AccessStudy and evaluation method of concrete erosion under a wind–sand flow load
- 14 October 2022
- Published by Taylor & Francis
- p. 482-492
Stress analysis of the cable tower during hoisting construction of a self-ascending crane of the Shunde Bridge
The common form of cable tower of the cable-stayed bridge is an H-shaped cable tower. Because the transverse direction of the bridge forms a certain included angle with the vertical plane, the stress of the cable tower is relatively large under the action of self-weight. In addition, the section and beam are hoisted by the climbing crane, which makes the cable tower in a more unfavorable working condition. Therefore, the 1/2 symmetrical model of the cable tower is established by using ABAQUS (a large commercial general finite element software), According to 9 kinds of adverse working conditions in construction, the corresponding boundary conditions are established and the corresponding loads are applied, and the cable tower stress under each adverse working condition is calculated. The results show that the maximum mise stress of the steel plate under various working conditions is 35.2Mpa, which meets the requirements of the specification. The maximum principal tensile stress of concrete is 2.5 MPa, which meets the specification requirements. The maximum principal compressive stress is 12.7 MPa, meeting the specification requirements. Three conclusions are further summarized: (1) most of the maximum stress of the steel plate in the construction process occurs at the bottom of the lower beam of the composite tower; (2) During the hoisting of the composite tower, the maximum tensile stress of concrete appears at the anchorage between a crane and cable tower, while during the hoisting of a steel tower, the maximum tensile stress of concrete appears at the steel-concrete joint section; (3) During hoisting, the maximum stress of the steel plate at the anchorage between the crane and the tower wall shall not exceed 20MPa, which mainly occurs when hoisting the section of the composite tower. At the same time, the corresponding reasons are analyzed to provide strong support for the optimization of the construction scheme.
- 14 October 2022
- Published by Taylor & Francis
- p. 482-492
Stress analysis of the cable tower during hoisting construction of a self-ascending crane of the Shunde Bridge
The common form of cable tower of the cable-stayed bridge is an H-shaped cable tower. Because the transverse direction of the bridge forms a certain included angle with the vertical plane, the stress of the cable tower is relatively large under the action of self-weight. In addition, the section and beam are hoisted by the climbing crane, which makes the cable tower in a more unfavorable working condition. Therefore, the 1/2 symmetrical model of the cable tower is established by using ABAQUS (a large commercial general finite element software), According to 9 kinds of adverse working conditions in construction, the corresponding boundary conditions are established and the corresponding loads are applied, and the cable tower stress under each adverse working condition is calculated. The results show that the maximum mise stress of the steel plate under various working conditions is 35.2Mpa, which meets the requirements of the specification. The maximum principal tensile stress of concrete is 2.5 MPa, which meets the specification requirements. The maximum principal compressive stress is 12.7 MPa, meeting the specification requirements. Three conclusions are further summarized: (1) most of the maximum stress of the steel plate in the construction process occurs at the bottom of the lower beam of the composite tower; (2) During the hoisting of the composite tower, the maximum tensile stress of concrete appears at the anchorage between a crane and cable tower, while during the hoisting of a steel tower, the maximum tensile stress of concrete appears at the steel-concrete joint section; (3) During hoisting, the maximum stress of the steel plate at the anchorage between the crane and the tower wall shall not exceed 20MPa, which mainly occurs when hoisting the section of the composite tower. At the same time, the corresponding reasons are analyzed to provide strong support for the optimization of the construction scheme.