Chenghu Wang
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Chenghu Wang has a total of 5 co-authors. Here are the top co-authors by number of shared publications:
- Caixia Jin
College of Mechanical and Electrical Engineering, Wenzhou University, Zhejiang, 325035, P. R. China
1 shared publication - Faqun Qi
College of Mechanical and Electrical Engineering Wenzhou University Wenzhou China
1 shared publication - Hongming Zhou
Wenzhou Polytechnic, Zhejiang, 325035, P. R. China
1 shared publication - Mi Li
Office of State-Owned Assets and Laboratory Management, Wenzhou University, Zhejiang, 325035, P. R. China
1 shared publication - Weizhen You
College of Mechanical and Electrical Engineering Wenzhou University Wenzhou China
1 shared publication
Latest Publications
- 23 June 2025
- Published by World Scientific Pub Co Pte Ltd in Asia-Pacific Journal of Operational Research
- Vol. 43 (02)
Energy–Saving Oriented Maintenance and Inventory Policy for a Two–Unit Buffered Serial System
This paper investigates the joint optimization of maintenance and inventory policy for a two–unit buffered serial system. The system comprises a production unit, an assembly unit, and an intermediate buffer. When the production unit deteriorates to the preventive maintenance (PM) threshold, the unit is restored to a state as good as new by PM. When the production unit degrades to the corrective maintenance (CM) threshold, the unit is replaced by CM. As for the assembly unit, when it fails, it is replaced by CM. Unlike previous studies, where intermediate buffer inventory strategies and upstream and downstream components were studied separately, in this paper the size of the buffer inventory interacts with the operating speeds of both components. Moreover, we use a semi–Markov decision process to obtain the transition probability, expected sojourn time and expected cost of the system. The optimal PM, CM, and intermediate buffer thresholds are derived by minimizing the long–run average cost of the system. Finally, the effectiveness of the proposed policy is verified by comparing the models.
- 23 June 2025
- Published by World Scientific Pub Co Pte Ltd in Asia-Pacific Journal of Operational Research
- Vol. 43 (02)
Energy–Saving Oriented Maintenance and Inventory Policy for a Two–Unit Buffered Serial System
This paper investigates the joint optimization of maintenance and inventory policy for a two–unit buffered serial system. The system comprises a production unit, an assembly unit, and an intermediate buffer. When the production unit deteriorates to the preventive maintenance (PM) threshold, the unit is restored to a state as good as new by PM. When the production unit degrades to the corrective maintenance (CM) threshold, the unit is replaced by CM. As for the assembly unit, when it fails, it is replaced by CM. Unlike previous studies, where intermediate buffer inventory strategies and upstream and downstream components were studied separately, in this paper the size of the buffer inventory interacts with the operating speeds of both components. Moreover, we use a semi–Markov decision process to obtain the transition probability, expected sojourn time and expected cost of the system. The optimal PM, CM, and intermediate buffer thresholds are derived by minimizing the long–run average cost of the system. Finally, the effectiveness of the proposed policy is verified by comparing the models.