Weizhen You
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Weizhen You has a total of 6 co-authors. Here are the top co-authors by number of shared publications:
- Faqun Qi
College of Mechanical and Electrical Engineering Wenzhou University Wenzhou China
2 shared publications - Caixia Jin
College of Mechanical and Electrical Engineering, Wenzhou University, Zhejiang, 325035, P. R. China
1 shared publication - Chenghu Wang
College of Mechanical and Electrical Engineering, Wenzhou University, Zhejiang, 325035, P. R. China
1 shared publication - Hongming Zhou
Wenzhou Polytechnic, Zhejiang, 325035, P. R. China
1 shared publication Lun Shao
Laboratoire de Tribologie et Dynamique des Systèmes Ecole Centrale de Lyon Ecully France
1 shared publication- Mi Li
Office of State-Owned Assets and Laboratory Management, Wenzhou University, Zhejiang, 325035, P. R. China
1 shared publication
Latest Publications
- 10 February 2026
- Published by Wiley in Quality and Reliability Engineering International
- Vol. 42 (5) , 1908-1922
A Hybrid Method Combining Importance Sampling and Ensemble Learning for Structural Reliability Analysis
This paper proposes a hybrid structural reliability analysis (SRA) method by integrating importance sampling (IS) with ensemble learning (EL) surrogate models. The uncertainty space is defined as a joint distribution that involves uncertainties of dynamic load and structural properties. Different from general strategies which develop surrogate models to approximate limit state functions (LSF), this study applies surrogate models to fit the probability function of conditional failure events for which the structural properties are assumed deterministic. The regression problem between the structural samples and the conditional failure probability (CFP) is analyzed and the EL models are used as surrogates to fit this problem. Moreover, the estimation of the CFPs is accelerated by an IS technique, which is particularly efficient in rare events analysis. The EL model is built to predict the CFPs on a prediction set, and the overall failure probability is estimated as the expectation of these CFPs. Numerical simulations under assumptions of Gaussian/non‐Gaussian uncertainties of the structures are designed and implemented to demonstrate the efficiency and accuracy of the proposed method.
- 10 February 2026
- Published by Wiley in Quality and Reliability Engineering International
- Vol. 42 (5) , 1908-1922
A Hybrid Method Combining Importance Sampling and Ensemble Learning for Structural Reliability Analysis
This paper proposes a hybrid structural reliability analysis (SRA) method by integrating importance sampling (IS) with ensemble learning (EL) surrogate models. The uncertainty space is defined as a joint distribution that involves uncertainties of dynamic load and structural properties. Different from general strategies which develop surrogate models to approximate limit state functions (LSF), this study applies surrogate models to fit the probability function of conditional failure events for which the structural properties are assumed deterministic. The regression problem between the structural samples and the conditional failure probability (CFP) is analyzed and the EL models are used as surrogates to fit this problem. Moreover, the estimation of the CFPs is accelerated by an IS technique, which is particularly efficient in rare events analysis. The EL model is built to predict the CFPs on a prediction set, and the overall failure probability is estimated as the expectation of these CFPs. Numerical simulations under assumptions of Gaussian/non‐Gaussian uncertainties of the structures are designed and implemented to demonstrate the efficiency and accuracy of the proposed method.
- 23 June 2025
- Published by World Scientific Pub Co Pte Ltd in Asia-Pacific Journal of Operational Research
- Vol. 43 (02)
Energy–Saving Oriented Maintenance and Inventory Policy for a Two–Unit Buffered Serial System
This paper investigates the joint optimization of maintenance and inventory policy for a two–unit buffered serial system. The system comprises a production unit, an assembly unit, and an intermediate buffer. When the production unit deteriorates to the preventive maintenance (PM) threshold, the unit is restored to a state as good as new by PM. When the production unit degrades to the corrective maintenance (CM) threshold, the unit is replaced by CM. As for the assembly unit, when it fails, it is replaced by CM. Unlike previous studies, where intermediate buffer inventory strategies and upstream and downstream components were studied separately, in this paper the size of the buffer inventory interacts with the operating speeds of both components. Moreover, we use a semi–Markov decision process to obtain the transition probability, expected sojourn time and expected cost of the system. The optimal PM, CM, and intermediate buffer thresholds are derived by minimizing the long–run average cost of the system. Finally, the effectiveness of the proposed policy is verified by comparing the models.
- 23 June 2025
- Published by World Scientific Pub Co Pte Ltd in Asia-Pacific Journal of Operational Research
- Vol. 43 (02)
Energy–Saving Oriented Maintenance and Inventory Policy for a Two–Unit Buffered Serial System
This paper investigates the joint optimization of maintenance and inventory policy for a two–unit buffered serial system. The system comprises a production unit, an assembly unit, and an intermediate buffer. When the production unit deteriorates to the preventive maintenance (PM) threshold, the unit is restored to a state as good as new by PM. When the production unit degrades to the corrective maintenance (CM) threshold, the unit is replaced by CM. As for the assembly unit, when it fails, it is replaced by CM. Unlike previous studies, where intermediate buffer inventory strategies and upstream and downstream components were studied separately, in this paper the size of the buffer inventory interacts with the operating speeds of both components. Moreover, we use a semi–Markov decision process to obtain the transition probability, expected sojourn time and expected cost of the system. The optimal PM, CM, and intermediate buffer thresholds are derived by minimizing the long–run average cost of the system. Finally, the effectiveness of the proposed policy is verified by comparing the models.