Nurisra Nurisra
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Nurisra Nurisra has a total of 9 co-authors. Here are the top co-authors by number of shared publications:
- Mubarak Mubarak
Department of Civil Engineering, Faculty of Engineering, Universitas Syiah Kuala, Banda Aceh 23111, Indonesia
2 shared publications Cut Fahrina
Syiah Kuala University
1 shared publicationCut Zukhrina Oktaviani
Syiah Kuala University
1 shared publication- Febriyanti Maulina
Universitas Syiah Kuala
1 shared publication - Muhammad Jamil
Jurusan Teknik Sipil, Universitas Syiah Kuala
1 shared publication - Nafisah Al-Huda
Jurusan Teknik Sipil, Universitas Syiah Kuala
1 shared publication
Latest Publications
- Open Access
- 10 December 2024
- Published by LPPM Unsyiah in Journal of The Civil Engineering Student
- Vol. 6 (3) , 130-136
Potensi Kemunculan Risiko Untuk Faktor Material, Peralatan, Metode Konstruksi, dan Tenaga Kerja Pada Proyek Jalan Lingkungan
Proyek jalan lingkungan merupakan proyek jalan umum yang dioperasikan untuk penyediaan layanan lalu lintas angkutan lingkungan. Sumber daya adalah fase penting dalam pelaksanaan dan faktor penentu pencapaian tujuan dan sasaran proyek. Oleh karenanya, perencanaan sumber daya proyek haruslah baik, tepat dan terorganisir demi memperoleh sasaran proyek. Baik buruk kinerja pekerjaan ditentukan oleh biaya, waktu dan mutu yang dicapai. Untuk memperoleh tujuan tersebut diperlukannya manajemen proyek. Namun pada waktu pelaksanaan proyek sering mengalami risiko dan oleh karena itu manajemen risiko perlu dilakukan guna meminimalisir risiko yang muncul. Hal lain juga menunjang munculnya risiko ialah adanya penyebaran pandemi virus Covid-19 yang meningkat pada tahun 2021 dan mempengaruhi waktu, biaya dan mutu proyek. Tujuan dari penelitian ini ialah mengetahui faktor risiko sumber daya dan risk frequency yang terjadi pada pelaksanaan proyek jalan lingkungan pada 4 Kabupaten/Kota di Provinsi Aceh. Data sekunder penelitian ini diperoleh dari hasil studi literatur, sedangkan data primer diperoleh dari jawaban responden pada kuesioner. Pengujian data dilakukan dengan uji data validitas dan reliabilitas kemudian dilakukan anaisis data deskriptif dan analisis Frequency Index. Berdasarkan hasil penelitian didapatkan 34 variabel risiko yang terjadi pada pelaksanaan proyek dan variabel risiko kenaikan harga material adalah variabel yang paling tertinggi dengan nilai FI diperoleh 0,730.
- 10 December 2024
- Published by LPPM Unsyiah in Journal of The Civil Engineering Student
- Vol. 6 (3) , 130-136
Open AccessPotensi Kemunculan Risiko Untuk Faktor Material, Peralatan, Metode Konstruksi, dan Tenaga Kerja Pada Proyek Jalan Lingkungan
Proyek jalan lingkungan merupakan proyek jalan umum yang dioperasikan untuk penyediaan layanan lalu lintas angkutan lingkungan. Sumber daya adalah fase penting dalam pelaksanaan dan faktor penentu pencapaian tujuan dan sasaran proyek. Oleh karenanya, perencanaan sumber daya proyek haruslah baik, tepat dan terorganisir demi memperoleh sasaran proyek. Baik buruk kinerja pekerjaan ditentukan oleh biaya, waktu dan mutu yang dicapai. Untuk memperoleh tujuan tersebut diperlukannya manajemen proyek. Namun pada waktu pelaksanaan proyek sering mengalami risiko dan oleh karena itu manajemen risiko perlu dilakukan guna meminimalisir risiko yang muncul. Hal lain juga menunjang munculnya risiko ialah adanya penyebaran pandemi virus Covid-19 yang meningkat pada tahun 2021 dan mempengaruhi waktu, biaya dan mutu proyek. Tujuan dari penelitian ini ialah mengetahui faktor risiko sumber daya dan risk frequency yang terjadi pada pelaksanaan proyek jalan lingkungan pada 4 Kabupaten/Kota di Provinsi Aceh. Data sekunder penelitian ini diperoleh dari hasil studi literatur, sedangkan data primer diperoleh dari jawaban responden pada kuesioner. Pengujian data dilakukan dengan uji data validitas dan reliabilitas kemudian dilakukan anaisis data deskriptif dan analisis Frequency Index. Berdasarkan hasil penelitian didapatkan 34 variabel risiko yang terjadi pada pelaksanaan proyek dan variabel risiko kenaikan harga material adalah variabel yang paling tertinggi dengan nilai FI diperoleh 0,730.
- Open Access
- 22 June 2023
- Published by LPPM Unsyiah in Journal of The Civil Engineering Student
- Vol. 5 (2) , 176-182
Analisis Frekuensi Indeks untuk Penilaian Potensi Kemunculan Risiko Pada Proyek Rumah Dhuafa
Analisis Frekuensi Indeks untuk Penilaian Potensi Kemunculan Risiko Pada Proyek Rumah Dhuafa
- 22 June 2023
- Published by LPPM Unsyiah in Journal of The Civil Engineering Student
- Vol. 5 (2) , 176-182
Open AccessAnalisis Frekuensi Indeks untuk Penilaian Potensi Kemunculan Risiko Pada Proyek Rumah Dhuafa
Analisis Frekuensi Indeks untuk Penilaian Potensi Kemunculan Risiko Pada Proyek Rumah Dhuafa
- Open Access
- 27 April 2022
- Published by LPPM Unsyiah in Journal of The Civil Engineering Student
- Vol. 4 (1) , 57-63
Risiko Pada Tahap Persiapan Proyek Pembangunan Irigasi Berbasis Masyarakat Di Aceh Besar
Program Percepatan Peningkatan Tata Guna Air Irigasi (P3-TGAI) merupakan salah satu program pembangunan irigasi berbasis masyarakat. Program ini termasuk proyek konstruksi berbasis masyarakat yang memiliki risiko pada tiap pelaksanaannya. Mulai dari tahap persiapan, tahap perencanaan, tahap pelaksanaan, hingga tahap penyelesaian. Permasalahan proyek konstruksi berbasis masyarakat yang pernah diangkat pada penelitian sebelumnya yaitu seperti sekolah (Manelele, 2008) dan rumah pasca bencana (Malahayati, 2019), yang ditemukan risiko dalam pelaksanaanya. Penelitian ini bertujuan untuk mengidentifikasi faktor risiko dan faktor risiko dominan tahap persiapan dalam proyek pembangunan irigasi berbasis masyarakat. Sumber data berasal dari data primer dan sekunder. Data primer didapatkan dengan menyebarkan kuesioner kepada 25 responden yang memiliki berprofesi sebagai Konsultan Manajemen Balai (KMB) dan Tim Pedamping Masyarakat (TPM) wilayah Aceh Besar. Sedangkan data sekunder didapatkan dari teori pendukung, jurnal, dan studi literatur yang berkaitan dengan penelitian. Pengujian instrumen dilakukan dengan uji validitas dan reliabilitas. Metode penelitian yang digunakan yaitu analisisf frequency index untuk mengetahui tingkatan risiko dan variabel risiko yang dominan. Hasil penelitian teridentifikasi 33 faktor risiko sesuai tingkatan risiko dari tingkat tertinggi sampai dengan tingkat terendah. Risiko dominan terdapat pada peristiwa jadwal pelatihan TPM yang padat/singkat dengan nilai risiko yaitu 0,488 dengan tingkat risiko pada tingkatan sedang.
- 27 April 2022
- Published by LPPM Unsyiah in Journal of The Civil Engineering Student
- Vol. 4 (1) , 57-63
Open AccessRisiko Pada Tahap Persiapan Proyek Pembangunan Irigasi Berbasis Masyarakat Di Aceh Besar
Program Percepatan Peningkatan Tata Guna Air Irigasi (P3-TGAI) merupakan salah satu program pembangunan irigasi berbasis masyarakat. Program ini termasuk proyek konstruksi berbasis masyarakat yang memiliki risiko pada tiap pelaksanaannya. Mulai dari tahap persiapan, tahap perencanaan, tahap pelaksanaan, hingga tahap penyelesaian. Permasalahan proyek konstruksi berbasis masyarakat yang pernah diangkat pada penelitian sebelumnya yaitu seperti sekolah (Manelele, 2008) dan rumah pasca bencana (Malahayati, 2019), yang ditemukan risiko dalam pelaksanaanya. Penelitian ini bertujuan untuk mengidentifikasi faktor risiko dan faktor risiko dominan tahap persiapan dalam proyek pembangunan irigasi berbasis masyarakat. Sumber data berasal dari data primer dan sekunder. Data primer didapatkan dengan menyebarkan kuesioner kepada 25 responden yang memiliki berprofesi sebagai Konsultan Manajemen Balai (KMB) dan Tim Pedamping Masyarakat (TPM) wilayah Aceh Besar. Sedangkan data sekunder didapatkan dari teori pendukung, jurnal, dan studi literatur yang berkaitan dengan penelitian. Pengujian instrumen dilakukan dengan uji validitas dan reliabilitas. Metode penelitian yang digunakan yaitu analisisf frequency index untuk mengetahui tingkatan risiko dan variabel risiko yang dominan. Hasil penelitian teridentifikasi 33 faktor risiko sesuai tingkatan risiko dari tingkat tertinggi sampai dengan tingkat terendah. Risiko dominan terdapat pada peristiwa jadwal pelatihan TPM yang padat/singkat dengan nilai risiko yaitu 0,488 dengan tingkat risiko pada tingkatan sedang.