YGYiwen Gao

Yiwen Gao

*This is an algorithmically generated author record based on publicly available information.

Yiwen Gao has a total of 9 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Operation-Index-Driven Evaluation of Source-Grid-Load-Storage Distribution Networks via Digital Dynamic Modeling

    by Cheng Long, Hua Zhang, Xueneng Su, Yiwen Gao, Qian Xie, Kun Zheng

    This paper proposes an operation-index-driven intelligent generation method for distribution network simulation models, integrating model library predefinition, multi-level equivalent modeling, and multi-agent collaboration into an automated pipeline. Three agents collaborate through a unified message bus, task queue, and device model library as follows: Monitor Agent performs time-series data acquisition, national-standard threshold evaluation, and topology verification to trigger modeling tasks; Energy-flow-Model Agent uses a hierarchical model library and LLM (Large Language Model) to automatically match standardized models, parses CIM topology, and applies Thevenin/Ward/three-phase admittance matrix multi-level equivalent modeling to construct Energy Flow Network (EFN) computation graphs; Device-Model-Data Agent supplies missing impedance parameters via a public device standard library. The pipeline automatically generates 15 min granularity current-state assessment models synchronized with operating conditions. Validation on eight consecutive days of 10 kV feeder field measurements (96-time sections/day, 91 transformer areas) shows three-phase voltage mean MAPE of 2.52% and 98.9% correct trigger rate with no false activations or missed detections, achieving end-to-end automation from archive parsing to model generation.

  • Open Access

    Dynamic Intelligent Method for Voltage Violation Management in High-Renewable-Penetration Distribution Networks

    by Hua Zhang, Cheng Long, Xueneng Su, Yiwen Gao, Qian Xie, Kun Zheng

    This paper proposes a dynamic intelligent method for voltage violation management in high-renewable-penetration distribution networks. The method employs a dual-agent architecture: DERMS_Agent coordinates task scheduling, data management, and computational resource allocation, while Solution_Agent performs three-phase unbalanced power flow calculation and MIQP-based voltage violation joint optimization. Four key technical contributions are presented. (i) An asymmetric nodal admittance matrix is developed to incorporate transformer tap-phase-shift and capacitor branches within a unified formulation. (ii) Five categories of analytical sensitivities are systematically derived, covering transformer tap, phase shift, and capacitor compensation effects for both voltage regulation and harmonic suppression. (iii) A three-parameter MIQP joint optimization model is constructed with voltage deviation minimization as the objective and three-phase unbalance and resonance avoidance as constraints. (iv) A two-stage hybrid solution strategy combining Ipopt continuous relaxation with Gurobi neighborhood enumeration is designed to achieve real-time solvability. Validation on a real 10 kV feeder with 91 transformer areas over 768 time sections (8 days) demonstrates a 95.6% voltage violation resolution rate within the first three polling cycles and an average single-section solution time of 0.83 s, satisfying the real-time requirements of 15 min operational control cycles.

  • Open Access

    AI-Based Customized Simulation Setup, Process Control, and Result Processing Technology for Distribution Networks

    by Cheng Long, Hua Zhang, Xueneng Su, Yiwen Gao, Qian Xie, Kun Zheng

    To address the two fundamental contradictions in distribution network digital simulation systems: “diversified simulation requirements versus standardized configuration” and “massive simulation outputs versus sparse decision-making information”, this paper builds upon existing work on Common Information Model (CIM)-based automatic simulation model generation and dynamic voltage regulation simulation and further constructs a user-oriented intelligent simulation service layer. This layer is collaboratively composed of an Orchestration_Agent (simulation orchestration agent) and an Analysis_Agent (result analysis agent), tasked with three responsibilities: based on multi-level simulation granularity (L0–L3) and a simulation template library, leveraging a large language model (LLM) to achieve natural language requirements parsing and automatic workflow orchestration; based on a simulation knowledge graph, implementing parameter recommendation, verification, and anomaly-adaptive recovery for process control; and based on a hybrid architecture of rule templates, statistical analysis, and causal graph models, achieving automatic result analysis, root cause reasoning, and structured report generation, with case feedback driving knowledge base iteration. Validation was conducted on data from a real 10 kV feeder with 91 distribution transformer areas over 30 consecutive days (2880 time cross-sections): comprehensive requirements-parsing accuracy of 96.3%, automatic parameter configuration coverage rate of 94.7%, anomaly identification recall/precision of 94.0%/96.9%, root cause reasoning accuracy of 92.1%, and the median end-to-end time per simulation shortened from approximately 36 min under the manual mode to 4.7 min. The results demonstrate that the proposed service layer provides a viable engineering technology pathway for the evolution of distribution network simulation from tool-oriented to service-oriented.

  • Open Access

    Research on Bo-BiLSTM-Based Synchronous Load Transfer Control Technology for Distribution Networks

    by Cheng Long, Hua Zhang, Xueneng Su, Yiwen Gao, Wei Luo

    The operational modes and fault characteristics of distribution networks incorporating distributed generation are becoming increasingly complex. This complexity increases the difficulty of predicting switch control action times and leads to scattered samples with data scarcity. Consequently, it imposes higher demands on rapid fault isolation and load transfer control following system failures. To address this issue, this paper proposes a switch action time prediction and synchronous load transfer control method based on Bayesian optimization of bidirectional long short-term memory (Bo-BiLSTM) networks. A distribution network simulation model incorporating distributed generation was constructed using MATLAB/Simulink (R2023a). Three-phase voltage and current at the Point of Common Coupling (PCC) were extracted as feature parameters to establish a switch operation timing database. Bayesian optimization was employed to tune the BiLSTM hyperparameters, constructing the Bo-BiLSTM prediction model to achieve high-precision forecasting of switch operation times under fault conditions. Subsequently, a load-synchronized transfer control strategy was proposed based on the prediction results. A dynamic delay mechanism was designed to achieve “open first and then close” sequential coordinated control. Physical experiments verified that the time difference between opening and closing was controlled within 2–12 milliseconds (ms), meeting the engineering requirement of less than 20 ms. The results demonstrate that the proposed control method enhances switch operation time prediction accuracy while effectively supporting rapid fault isolation and seamless load transfer in distribution networks, thereby improving system reliability and control precision.

  • Open Access

    Research on Synchronous Transfer Control Technology for Distribution Network Load Based on Imprecise Probability

    by Hua Zhang, Cheng Long, Xueneng Su, Yiwen Gao, Wei Luo

    As the penetration rate of distributed power sources increases and distribution network structures grow increasingly complex, the uncertainty in switch action control during load transfer has become a critical issue affecting grid safety and reliability. Traditional control methods based on precise probability-based predictive control are susceptible to bias introduced by prior settings under small-sample conditions, making it difficult to meet the stringent requirements of time-synchronized control. To address this, this study proposes an imprecise probability-based synchronous load transfer control method for distribution networks. By integrating the Imprecise Dirichlet model (IDM) with a Naive Credal Classifier (NCC), it constructs an interval predictive control model for switching action timing. This approach effectively mitigates the prior dependency issue and enhances estimation robustness under small-sample conditions. Combined with a dynamic delay strategy, this approach strictly controls the interval between disconnection and reconnection actions within 20 ms, preventing circulating current risks and ensuring transfer reliability. The simulation and experimental results demonstrate that the proposed method outperforms traditional Bayesian classifiers in both time prediction control accuracy and model robustness, providing a theoretical foundation and a reference for engineering applications for secure action control in distribution networks.

  • Open Access

    Research on Bo-BiLSTM-Based Synchronous Load Transfer Control Technology for Distribution Networks

    by Cheng Long, Hua Zhang, Xueneng Su, Yiwen Gao, Wei Luo

    The operational modes and fault characteristics of distribution networks incorporating distributed generation are becoming increasingly complex. This complexity increases the difficulty of predicting switch control action times, leads to scattered samples and data scarcity, and imposes higher demands on rapid fault isolation and load transfer control following system failures. To address this issue, this paper proposes a switch action time prediction and synchronous load transfer control method based on Bayesian optimization of bidirectional long short-term memory networks (Bo-BiLSTM). A distribution network simulation model incorporating distributed generation was constructed using MATLAB/Simulink. Three-phase voltage and current at the point of common coupling (PCC) were extracted as feature parameters to establish a switch operation timing database. Bayesian optimization was employed to tune the BiLSTM hyperparameters, constructing the Bo-BiLSTM prediction model to achieve high-precision forecasting of switch operation times under fault conditions. Subsequently, a load-synchronized transfer control strategy was proposed based on the prediction results. A dynamic delay mechanism was designed to achieve “disconnect-first, reconnect-later” sequential coordinated control. Physical experiments verified that the time difference between disconnection and reconnection was controlled within 2–12 ms, meeting the engineering requirement of less than 20 ms. Results demonstrate that the proposed control method enhances switch operation time prediction accuracy while effectively supporting rapid fault isolation and seamless load transfer in distribution networks, thereby improving system reliability and control precision.

  • Open Access

    Research on Distribution Network Load Synchronous Transfer Control Technology Based on Imprecise Probability

    by Hua Zhang, Cheng Long, Xueneng Su, Yiwen Gao, Wei Luo

    As the penetration rate of distributed power sources increases and distribution network structures grow increasingly complex, the uncertainty in switch action control during load transfer has become a critical issue affecting grid safety and reliability. Traditional control methods based on precise probability-based predictive control are susceptible to bias introduced by prior settings under small-sample conditions, making it difficult to meet the stringent requirements of time-synchronized control. To address this, this study proposes an imprecise probability-based synchronous load transfer control method for distribution networks. By integrating the Imprecise Dirichlet model (IDM) with a Naive Credal Classifier (NCC), it constructs an interval predictive control model for switching action timing. This approach effectively mitigates the prior-dependency issue and enhances estimation robustness under small sample conditions. Combined with a dynamic delay strategy, this approach strictly controls the interval between disconnection and reconnection actions within 20 ms, preventing circulating current risks and ensuring transfer reliability. Simulation and experimental results demonstrate that the proposed method outperforms traditional Bayesian classifiers in both time prediction control accuracy and model robustness, providing a theoretical foundation and a reference for engineering applications for secure action control in distribution networks.