Neziha Yilmaz
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Neziha Yilmaz has a total of 4 co-authors. Here are the top co-authors by number of shared publications:
- Esin Ergen
Istanbul Technical University Department of Civil Engineering
2 shared publications - Ahmet Muhtar Citipitioglu
TAV Construction
1 shared publication - Deniz Artan
Istanbul Teknik Üniversitesi
1 shared publication - Isilay Tekce
Özyeğin University Faculty of Architecture and Design
1 shared publication
Latest Publications
- 9 February 2026
- Published by Teknik Dergi in Turkish Journal of Civil Engineering
- Vol. 37 (4) , 99-127
Yapı Bilgi Modellemesi ile Tümleşik Termal Konfor Değerlendirme Sistemi
Termal konfor yapılarda kullanıcı memnuniyetini, sağlığını, üretkenliğini ve enerji tüketimini etkilemektedir. Bu çalışmada, ofis binaları için kullanıcı geri bildirimlerinin gerekli bağlamsal bilgi öğeleriyle (örneğin, bina elemanları ve bina geometrisi) zenginleştirilerek toplanmasını sağlayan ve karar vericilere yapı bilgi modellemesi (BIM) ile entegre şekilde sunan bir termal konfor değerlendirme sistemi geliştirilmiştir. Çalışmanın yöntemi, Yapısal Eşitlik Modeli ile termal konfor ölçüm modeli geliştirilmesi ve önerilen BIM ile tümleşik termal konfor değerlendirme sisteminin prototipi oluşturularak bir ofis binasında vaka analiziyle doğrulamasını içerir. Sonuçlar, geliştirilen sistemin kullanıcı geri bildirimlerinin etkin şekilde toplanmasını ve analiz edilmesini sağladığını göstermektedir. Önerilen sistemin ofislerde enerji tüketimini optimize ederek termal konforu iyileştirmesi ve böylece kullanıcı memnuniyeti, sağlığı, üretkenliğine katkıda bulunması beklenmektedir.
- 9 February 2026
- Published by Teknik Dergi in Turkish Journal of Civil Engineering
- Vol. 37 (4) , 99-127
Yapı Bilgi Modellemesi ile Tümleşik Termal Konfor Değerlendirme Sistemi
Termal konfor yapılarda kullanıcı memnuniyetini, sağlığını, üretkenliğini ve enerji tüketimini etkilemektedir. Bu çalışmada, ofis binaları için kullanıcı geri bildirimlerinin gerekli bağlamsal bilgi öğeleriyle (örneğin, bina elemanları ve bina geometrisi) zenginleştirilerek toplanmasını sağlayan ve karar vericilere yapı bilgi modellemesi (BIM) ile entegre şekilde sunan bir termal konfor değerlendirme sistemi geliştirilmiştir. Çalışmanın yöntemi, Yapısal Eşitlik Modeli ile termal konfor ölçüm modeli geliştirilmesi ve önerilen BIM ile tümleşik termal konfor değerlendirme sisteminin prototipi oluşturularak bir ofis binasında vaka analiziyle doğrulamasını içerir. Sonuçlar, geliştirilen sistemin kullanıcı geri bildirimlerinin etkin şekilde toplanmasını ve analiz edilmesini sağladığını göstermektedir. Önerilen sistemin ofislerde enerji tüketimini optimize ederek termal konforu iyileştirmesi ve böylece kullanıcı memnuniyeti, sağlığı, üretkenliğine katkıda bulunması beklenmektedir.
- 20 October 2025
- Published by Emerald Publishing in Smart and Sustainable Built Environment
- p. 1-21
Enhancing RFI management in construction through machine learning-driven predictive models
Purpose: Request for information (RFI) documents are essential for communication and issue resolution in construction projects; however, prolonged RFI resolution times can impact project timelines. This study aims to predict RFI closure durations as they are created and addressed to help identify and prioritize RFIs likely to remain open longer. Design/methodology/approach: A dataset of 3,628 RFI documents from a large-scale airport project was used. Five machine learning (ML) algorithms, support vector machine (SVM), logistic regression (LR), K-nearest neighbors (KNN), decision tree (DT) and random forest (RF), were used to create a multi-model prediction framework for RFI closure durations. The models incorporated both categorical metadata and textual data with a staged input structure simulating real project conditions. Findings: The most effective algorithms for predicting RFI closure durations were SVM for the model using only RFI metadata parameters as input, and DT when using RFI metadata parameters together with RFI response durations as input. Prediction accuracy improved significantly after using the first response durations, ranging from 59% to 92% for the different models presented. Practical implications: Integrated into common data environments, the models enable real-time prediction and prioritization of RFIs, helping teams reduce delays and optimize resources. They also support digital transformation in construction and suggest potential for policy development around predictive analytics in project management. Originality/value: This study created prediction models for prioritizing RFIs based on their expected closure durations and identified the most effective ML algorithms for different input variables.
- 20 October 2025
- Published by Emerald Publishing in Smart and Sustainable Built Environment
- p. 1-21
Enhancing RFI management in construction through machine learning-driven predictive models
Purpose: Request for information (RFI) documents are essential for communication and issue resolution in construction projects; however, prolonged RFI resolution times can impact project timelines. This study aims to predict RFI closure durations as they are created and addressed to help identify and prioritize RFIs likely to remain open longer. Design/methodology/approach: A dataset of 3,628 RFI documents from a large-scale airport project was used. Five machine learning (ML) algorithms, support vector machine (SVM), logistic regression (LR), K-nearest neighbors (KNN), decision tree (DT) and random forest (RF), were used to create a multi-model prediction framework for RFI closure durations. The models incorporated both categorical metadata and textual data with a staged input structure simulating real project conditions. Findings: The most effective algorithms for predicting RFI closure durations were SVM for the model using only RFI metadata parameters as input, and DT when using RFI metadata parameters together with RFI response durations as input. Prediction accuracy improved significantly after using the first response durations, ranging from 59% to 92% for the different models presented. Practical implications: Integrated into common data environments, the models enable real-time prediction and prioritization of RFIs, helping teams reduce delays and optimize resources. They also support digital transformation in construction and suggest potential for policy development around predictive analytics in project management. Originality/value: This study created prediction models for prioritizing RFIs based on their expected closure durations and identified the most effective ML algorithms for different input variables.