Said Saif Salim Almaawali
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Said Saif Salim Almaawali has a total of 7 co-authors. Here are the top co-authors by number of shared publications:
- Abubakar S. Mahmoud
Department of Facilities and Construction Project Management, International College of Engineering and Management, Affiliated with the University of Lancashire, UK, P.O. Box 2511, Muscat 111, Oman
1 shared publication - Ali Istanbullu
Civil and Construction Engineering Department, College of Engineering, A’Sharqiyah University, P.O. Box 42, Ibra 400, Oman
1 shared publication Ameera Alsiyabi
1 shared publication- Majed A. A. Aldahdooh
Department of Facilities and Construction Project Management, International College of Engineering and Management, Affiliated with the University of Lancashire, UK, P.O. Box 2511, Muscat 111, Oman
1 shared publication - Mustafa Maher Al-Tayeb
Department of Civil Engineering, Faculty of Engineering, Hasan Kalyoncu University, Şahinbey, Gaziantep 27410, Türkiye
1 shared publication - Rami Hamad
Department of Facilities and Construction Project Management, International College of Engineering and Management, Affiliated with the University of Lancashire, UK, P.O. Box 2511, Muscat 111, Oman
1 shared publication
Latest Publications
- Open Access
Selection–Performance Decoupling in Construction Contractor Assurance: A Configurational Theory of Displayed Provision and Enacted Capability
Construction clients assess contractor assurance before award, and the instruments they commonly use, including prequalification questionnaires, industry assessment standards and management-system certificates, report a single position on a single continuum. This conceptual paper develops a theory that instead treats construction contractor assurance as two different kinds of dimensions: enacted assurance capability, the routines a contractor performs, and displayed assurance provision, the artefacts through which those routines are represented to outsiders. The two differ in a property that configurational theory has not treated as consequential, namely what it costs an external assessor to establish a contractor’s position on each. Where assessment is predominantly documentary, and assessors face binding limits on budget, access and time, displayed provision is cheaper to verify and is therefore argued to receive greater relative weight in prequalification and selection, whereas enacted capability retains the stronger direct association with delivery performance. The paper names this divergence selection–performance decoupling and distinguishes it from the policy–practice decoupling described within organisations. Integrating capability theory, institutional theory and work on organisational routines, it derives four contractor archetypes, Embedded, Declarative, Silent and Minimal, and six propositions with explicit scope conditions and falsification criteria, developed for health and safety assurance. It identifies a reflexivity problem in contractor assessment: instruments assess the cheaper dimension more reliably than the practice it represents, and conventional improvement may deepen rather than correct this. A three-stage assessment model is proposed. The paper is a theory-development contribution; it reports no empirical tests, and it advances propositions as falsifiable claims rather than findings.
Open AccessSelection–Performance Decoupling in Construction Contractor Assurance: A Configurational Theory of Displayed Provision and Enacted Capability
Construction clients assess contractor assurance before award, and the instruments they commonly use, including prequalification questionnaires, industry assessment standards and management-system certificates, report a single position on a single continuum. This conceptual paper develops a theory that instead treats construction contractor assurance as two different kinds of dimensions: enacted assurance capability, the routines a contractor performs, and displayed assurance provision, the artefacts through which those routines are represented to outsiders. The two differ in a property that configurational theory has not treated as consequential, namely what it costs an external assessor to establish a contractor’s position on each. Where assessment is predominantly documentary, and assessors face binding limits on budget, access and time, displayed provision is cheaper to verify and is therefore argued to receive greater relative weight in prequalification and selection, whereas enacted capability retains the stronger direct association with delivery performance. The paper names this divergence selection–performance decoupling and distinguishes it from the policy–practice decoupling described within organisations. Integrating capability theory, institutional theory and work on organisational routines, it derives four contractor archetypes, Embedded, Declarative, Silent and Minimal, and six propositions with explicit scope conditions and falsification criteria, developed for health and safety assurance. It identifies a reflexivity problem in contractor assessment: instruments assess the cheaper dimension more reliably than the practice it represents, and conventional improvement may deepen rather than correct this. A three-stage assessment model is proposed. The paper is a theory-development contribution; it reports no empirical tests, and it advances propositions as falsifiable claims rather than findings.
- Open Access
- 1 February 2023
- Published by Qatar University Press
- p. 419-425
Influence of Adding Demolition Wastes on the Mechanical Properties of Concrete in Sultanate of Oman
Nowadays the global trend in construction industry is to reduce the cost, saving energy and preserving the environment. Using other industries' waste material as a construction material is one of several methods followed to meet these trends. Management of solid waste is considered as one of the most significant environmental issues not only in a country like Oman, but globally as well. Around 1.7 million tons of solid waste is yearly generated in Oman. More than 120 million tons of constriction demolition waste is yearly generated over the world. Besides, 10-30 % of solid wastes produced from construction field (concrete wastes and aggregate) in Oman is just dumped in the landfill area without any further use. In this paper, the influence of replacing the demolition waste with coarse aggregate on the mechanical properties of concrete was studied in terms of compressive, flexural, and tensile strengths, and workability. The concrete properties were evaluated by replacing of 20, 30 and 40% of coarse aggregates with demolition waste in the mix proportion of C-35 concrete and the experiment's results were compared with each other as well as with the conventional one, based on two different periods of 7 and 28 days. The results were satisfactory so it could be concluded that replacing of up to 40% of coarse aggregates with construction and demolition waste is still safe and not causing dramatic reduction in the concrete strength.
- 1 February 2023
- Published by Qatar University Press
- p. 419-425
Open AccessInfluence of Adding Demolition Wastes on the Mechanical Properties of Concrete in Sultanate of Oman
Nowadays the global trend in construction industry is to reduce the cost, saving energy and preserving the environment. Using other industries' waste material as a construction material is one of several methods followed to meet these trends. Management of solid waste is considered as one of the most significant environmental issues not only in a country like Oman, but globally as well. Around 1.7 million tons of solid waste is yearly generated in Oman. More than 120 million tons of constriction demolition waste is yearly generated over the world. Besides, 10-30 % of solid wastes produced from construction field (concrete wastes and aggregate) in Oman is just dumped in the landfill area without any further use. In this paper, the influence of replacing the demolition waste with coarse aggregate on the mechanical properties of concrete was studied in terms of compressive, flexural, and tensile strengths, and workability. The concrete properties were evaluated by replacing of 20, 30 and 40% of coarse aggregates with demolition waste in the mix proportion of C-35 concrete and the experiment's results were compared with each other as well as with the conventional one, based on two different periods of 7 and 28 days. The results were satisfactory so it could be concluded that replacing of up to 40% of coarse aggregates with construction and demolition waste is still safe and not causing dramatic reduction in the concrete strength.