Krzysztof Piotr Kawa
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Krzysztof Piotr Kawa has a total of 10 co-authors. Here are the top co-authors by number of shared publications:
Bruno Balhan
Accelerator Beam Transfer Group, CERN, Geneva, Switzerland
2 shared publications- Friedrich Lackner
CERN, Geneva 23, Switzerland
2 shared publications Cedric Baud
CERN, Geneva 23, Switzerland
1 shared publication- Jan Borburgh
European Organization for Nuclear Research
1 shared publication L. Porta
CERN, Geneva 23, Switzerland
1 shared publicationMelvyn Rouchouse
CERN, Geneva 23, Switzerland
1 shared publication
Latest Publications
- Open Access
- 9 February 2026
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 36 (3) , 1-5
Development of an Experimental Test Stand and Machine Learning Surrogate Models for Capturing Complex Responses in Pulsed Septa
The complex electromagnetic and structural response of pulsed septum electromagnets is currently being studied, aiming to reveal insights into the prediction of their life cycles. The fault prediction remains a key challenge, requiring efforts in modelling and onsite instrumentation. Recently, a high-fidelity numerical model was developed, which allowed us to deepen our understanding of the system’s behavior. The insight on critical stress/strain conditions are now allowing to better understand early fatigue observations in the coil conductor and required peripheral equipment. As a next step, a numerical parametric study has been conducted, enabling the prediction of the mechanical and electromagnetic dynamic response under different operation conditions. A stringent experimental campaign has been carried out to validate these results. These tests required developing the test setup, including careful selection of non-contact and on-device instrumentation, as well as the data acquisition system. The setup has demonstrated the feasibility of potential implementation in the CERN accelerator complex. In parallel, significant efforts have been made to study the possibility of using Machine Learning (ML) models to reduce the time-consuming simulation process based on analytical solvers. Several custom loss functions reflecting physical constraints, as well as augmentation techniques, have been implemented to overcome the challenge of a strongly limited dataset size. The created ML pipelines and dedicated Graphical User Interface (GUI) are now enabling instantaneous response of the device’s model. The paper will summarize the efforts and project status with the long-term vision to develop a digital twin for septum magnets.
- 9 February 2026
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 36 (3) , 1-5
Open AccessDevelopment of an Experimental Test Stand and Machine Learning Surrogate Models for Capturing Complex Responses in Pulsed Septa
The complex electromagnetic and structural response of pulsed septum electromagnets is currently being studied, aiming to reveal insights into the prediction of their life cycles. The fault prediction remains a key challenge, requiring efforts in modelling and onsite instrumentation. Recently, a high-fidelity numerical model was developed, which allowed us to deepen our understanding of the system’s behavior. The insight on critical stress/strain conditions are now allowing to better understand early fatigue observations in the coil conductor and required peripheral equipment. As a next step, a numerical parametric study has been conducted, enabling the prediction of the mechanical and electromagnetic dynamic response under different operation conditions. A stringent experimental campaign has been carried out to validate these results. These tests required developing the test setup, including careful selection of non-contact and on-device instrumentation, as well as the data acquisition system. The setup has demonstrated the feasibility of potential implementation in the CERN accelerator complex. In parallel, significant efforts have been made to study the possibility of using Machine Learning (ML) models to reduce the time-consuming simulation process based on analytical solvers. Several custom loss functions reflecting physical constraints, as well as augmentation techniques, have been implemented to overcome the challenge of a strongly limited dataset size. The created ML pipelines and dedicated Graphical User Interface (GUI) are now enabling instantaneous response of the device’s model. The paper will summarize the efforts and project status with the long-term vision to develop a digital twin for septum magnets.
- Open Access
- 21 November 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 36 (3) , 1-5
A New Eddy Current Septum Magnet for Fast Extraction from CERN's Proton Synchrotron
A new eddy current septum for the fast extraction from CERN's Proton Synchrotron (PS) has been designed and constructed. This development aims to improve the magnet's reliability, extend its service interval, and reduce radiation exposure for maintenance personnel. The new eddy current device is set to replace the existing direct-drive magnet and its ageing power converter. This paper summarizes the electromagnetic design calculations, the mechanical concept and the subsequent detailed design implementation. It also describes the magnet's construction process and the results from the comprehensive validation tests, including magnetic field measurements, to achieve operational readiness ahead of commissioning in the Proton Synchrotron accelerator.
- 21 November 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 36 (3) , 1-5
Open AccessA New Eddy Current Septum Magnet for Fast Extraction from CERN's Proton Synchrotron
A new eddy current septum for the fast extraction from CERN's Proton Synchrotron (PS) has been designed and constructed. This development aims to improve the magnet's reliability, extend its service interval, and reduce radiation exposure for maintenance personnel. The new eddy current device is set to replace the existing direct-drive magnet and its ageing power converter. This paper summarizes the electromagnetic design calculations, the mechanical concept and the subsequent detailed design implementation. It also describes the magnet's construction process and the results from the comprehensive validation tests, including magnetic field measurements, to achieve operational readiness ahead of commissioning in the Proton Synchrotron accelerator.