Arjita Biswas
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Arjita Biswas has a total of 5 co-authors. Here are the top co-authors by number of shared publications:
Hariom Khungar
Ramdeobaba Univ
1 shared publication- Ranjan Kumar Shrivastava
NICMAR University School of Construction Pune and Department of Civil, NTPC Limited, Korba, India
1 shared publication Sandeep Sathe
MIT World Peace Univ
1 shared publicationShubhangi Shekokar
MIT World Peace Univ
1 shared publication- Venkatesh Wadki
School of Civil Engineering, REVA University, Bengaluru, India
1 shared publication
Latest Publications
- 2 November 2026
- Published by Emerald Publishing in Journal of Engineering, Design and Technology
- p. 1-21
From risk management to AI-enabled governance: five intellectual orientations in EPC and infrastructure project risk governance
Purpose: This study aims to synthesise the intellectual development of engineering–procurement–construction and infrastructure project risk governance and examine whether bibliometric evidence supports five overlapping intellectual orientations. Design/methodology/approach: The study combined bibliometric analysis with Bibliometrix/Biblioshiny, VOSviewer and a scripted workflow to examine 173 Scopus-indexed publications (1999–2026). The analytical corpus was derived through relevance validation of 678 candidate records, with provenance checked against an 801-row master ledger. Fifteen provisional 2026 records were excluded from temporal comparisons. Findings: The analysis identified five orientations: risk analysis and control (53 documents), performance and overrun (80), governance and relational mechanisms (52), digital information integration (7) and artificial intelligence (AI)-enabled decision support (18). The share of period publications addressing performance and overrun increased from 34.7 % in 1999–2018 to 59.7 % in 2023–2025, whereas the digital and AI orientations remained comparatively limited. These patterns concern the published literature and do not establish organizational maturity or realised capability. Research limitations/implications: Scopus coverage, title/abstract-based relevance validation, citation lag, analytical thresholds and interpretive coding delimit the findings. Project-level research is required to test the proposed relationships. Practical implications: The orientations provide structured review prompts for risk processes, outcome linkage, decision rights, information integration and human oversight of predictive systems; they are not intended as a diagnostic maturity instrument. Originality/value: The study connects construction risk, megaproject governance and construction AI through an auditable corpus and an evidence-bounded conceptual framework.
- 2 November 2026
- Published by Emerald Publishing in Journal of Engineering, Design and Technology
- p. 1-21
From risk management to AI-enabled governance: five intellectual orientations in EPC and infrastructure project risk governance
Purpose: This study aims to synthesise the intellectual development of engineering–procurement–construction and infrastructure project risk governance and examine whether bibliometric evidence supports five overlapping intellectual orientations. Design/methodology/approach: The study combined bibliometric analysis with Bibliometrix/Biblioshiny, VOSviewer and a scripted workflow to examine 173 Scopus-indexed publications (1999–2026). The analytical corpus was derived through relevance validation of 678 candidate records, with provenance checked against an 801-row master ledger. Fifteen provisional 2026 records were excluded from temporal comparisons. Findings: The analysis identified five orientations: risk analysis and control (53 documents), performance and overrun (80), governance and relational mechanisms (52), digital information integration (7) and artificial intelligence (AI)-enabled decision support (18). The share of period publications addressing performance and overrun increased from 34.7 % in 1999–2018 to 59.7 % in 2023–2025, whereas the digital and AI orientations remained comparatively limited. These patterns concern the published literature and do not establish organizational maturity or realised capability. Research limitations/implications: Scopus coverage, title/abstract-based relevance validation, citation lag, analytical thresholds and interpretive coding delimit the findings. Project-level research is required to test the proposed relationships. Practical implications: The orientations provide structured review prompts for risk processes, outcome linkage, decision rights, information integration and human oversight of predictive systems; they are not intended as a diagnostic maturity instrument. Originality/value: The study connects construction risk, megaproject governance and construction AI through an auditable corpus and an evidence-bounded conceptual framework.
- 1 August 2026
- Published by American Society of Civil Engineers (ASCE) in Journal of Structural Design and Construction Practice
- Vol. 31 (3)
Exploring the Effectiveness of Hybrid Fiber–Reinforced Geopolymer Concrete
- 1 August 2026
- Published by American Society of Civil Engineers (ASCE) in Journal of Structural Design and Construction Practice
- Vol. 31 (3)
Exploring the Effectiveness of Hybrid Fiber–Reinforced Geopolymer Concrete