RSRanjan Kumar Shrivastava

Ranjan Kumar Shrivastava

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Ranjan Kumar Shrivastava has a total of 2 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • From risk management to AI-enabled governance: five intellectual orientations in EPC and infrastructure project risk governance

    by Ranjan Kumar Shrivastava, Arjita Biswas

    Purpose: This study aims to synthesise the intellectual development of engineering–procurement–construction and infrastructure project risk governance and examine whether bibliometric evidence supports five overlapping intellectual orientations. Design/methodology/approach: The study combined bibliometric analysis with Bibliometrix/Biblioshiny, VOSviewer and a scripted workflow to examine 173 Scopus-indexed publications (1999–2026). The analytical corpus was derived through relevance validation of 678 candidate records, with provenance checked against an 801-row master ledger. Fifteen provisional 2026 records were excluded from temporal comparisons. Findings: The analysis identified five orientations: risk analysis and control (53 documents), performance and overrun (80), governance and relational mechanisms (52), digital information integration (7) and artificial intelligence (AI)-enabled decision support (18). The share of period publications addressing performance and overrun increased from 34.7 % in 1999–2018 to 59.7 % in 2023–2025, whereas the digital and AI orientations remained comparatively limited. These patterns concern the published literature and do not establish organizational maturity or realised capability. Research limitations/implications: Scopus coverage, title/abstract-based relevance validation, citation lag, analytical thresholds and interpretive coding delimit the findings. Project-level research is required to test the proposed relationships. Practical implications: The orientations provide structured review prompts for risk processes, outcome linkage, decision rights, information integration and human oversight of predictive systems; they are not intended as a diagnostic maturity instrument. Originality/value: The study connects construction risk, megaproject governance and construction AI through an auditable corpus and an evidence-bounded conceptual framework.

  • Risk governance, cost overruns and schedule delays in EPC projects: a PRISMA-guided systematic review and governance–risk–performance taxonomy

    by Ranjan Kumar Shrivastava, Arjita Biswas

    Purpose: Engineering–Procurement–Construction (EPC) projects continue to experience cost overruns and schedule delays despite extensive research on project risks. Existing studies largely examine governance mechanisms and risk factors separately, limiting the understanding of how governance arrangements are associated with project outcomes. This study addresses this gap by developing an integrated Governance–Risk–Performance perspective for complex EPC and infrastructure project contexts. Design/methodology/approach: A PRISMA-guided systematic literature review of the Scopus database identified 180 peer-reviewed studies published between 2005 and 2026. Structured data extraction, binary explicit-evidence coding, thematic synthesis and a 6 × 6 cross-tabulation matrix were used to map study-level co-occurrences between six governance mechanisms and six project-risk categories. Findings: The review identified six standardized governance mechanisms and six project-risk categories across the 180 reviewed studies. The interaction matrix contained co-occurrence evidence in all 36 governance–risk combinations. Governance or management recommendations and frameworks (G6) showed the highest co-occurrence with organizational, operational, interface or management risk (R5) and general, project or external risk evidence (R6), with 157 studies in each interaction. Among the more specific mechanisms, coordination, collaboration, partnering and integration (G5) showed the strongest associations with R6 and R5, occurring in 77 and 76 studies, respectively. These findings indicate that EPC risks are discussed in relation to multiple governance mechanisms rather than through isolated one-to-one relationships. Practitioners should therefore assess governance arrangements across the entire project-risk portfolio, while future research should empirically test the relationships mapped by the proposed taxonomy. Originality/value: This study moves beyond conventional factor-frequency reviews by mapping recurring co-occurrences between governance mechanisms and project-risk categories. The resulting taxonomy provides a structured diagnostic foundation for future empirical research and practical assessment of governance arrangements discussed alongside cost and schedule risks. Future studies should test these mapped relationships using project-level and longitudinal evidence.

  • Open Access

    Dual open trenches for seismic isolation of soil–structure systems: 2D–3D finite-element comparison and reduced-order time-domain analysis

    by Ranjan Kumar Shrivastava

    Most trench-isolation studies are formulated for harmonic, impact, or moving loads, whereas the seismic response of a coupled soil–foundation–structure system depends on broadband input, structural feedback, and three-dimensional wave paths. This study evaluates multiple open trenches by direct time-domain finite-element analysis under the 1940 El Centro and 2001 Bhuj–Ahmedabad earthquake motions. Eight-node plane-strain and three-dimensional elements were combined with Newmark average-acceleration integration and load-dependent Lanczos reduction. The best two-trench plane-strain configuration (D/L0 = 3, Lst/L0 = 3, Ltt/L0 = 10) produced a peak displacement ratio of 0.688, equivalent to a 31.2% reduction. The 3D optimum achieved essentially the same peak reduction (ratio 0.69; 31.0%) using a shallower and more compact layout (D/L0 = 1.5, Lst/L0 = 3, Ltt/L0 = 4, finite length L/L0 = 6). Thus, the 3D optimum required half the normalized depth and 40% of the plane-strain spacing. A separate plane-strain configuration reached an instantaneous displacement ratio of 0.30 after 4.5 s, corresponding to a 70% instantaneous reduction. Two trenches consistently improved on a single trench, while additional trenches produced negligible incremental benefit. The finite-element wave-propagation formulation reproduces the principal attenuation trends in Woods’ field measurements with and without a trench. Lanczos bases of 20/1152 and 50/2166 coordinates captured the selected 2D and 3D responses, reducing coordinate counts by 98.26% and 97.69%. The results show that useful seismic attenuation can be obtained with dual trenches, but geometry selected from plane strain is unnecessarily deep and widely spaced when finite-length 3D transmission paths are represented.