Jakob Giez
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Jakob Giez has a total of 6 co-authors. Here are the top co-authors by number of shared publications:
- Andrea Pulella
Microwaves and Radar Institute, German Aerospace Center, Weling, Germany
1 shared publication - Kersten Schmidt
Microwaves and Radar Institute, German Aerospace Center (DLR), 82234 Oberpfaffenhofen, Germany
1 shared publication - Marco Schwerdt
Deutsches Zentrum für Luft- und Raumfahrt e.V., Institut für Hochfrequenztechnik und Radarsysteme, 82234 Weßling, Germany
1 shared publication - Matteo Nannini
Microwaves and Radar Institute, SAR Technology Department, German Aerospace Center (DLR), 82234 Wessling, Germany
1 shared publication - Patrick Klenk
German Aerospace Center (DLR), Microwaves and Radar Institute, Oberpfaffenhofen, D-82234 Wessling, Germany
1 shared publication - Pau Prats-Iraola
Microwaves and Radar Institute, German Aerospace Center (DLR), Weling, Germany
1 shared publication
Latest Publications
- Open Access
- 7 April 2026
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Journal of Selected Topics in Applied Earth Observations and Remote Sensing
- Vol. 19 (19391404) , 15833-15853
Independent SAR System Calibration of Sentinel-1C
Sentinel-1 C is the third satellite of the Sentinel-1 mission. Launched in late 2024, it ensures seamless continuity of C-band SAR data for global monitoring of the Earth surface in the framework of the Copernicus program. In parallel to the commissioning of Sentinel-1 C by the European Space Agency (ESA), an independent verification of the system calibration has been performed by the German Aerospace Center (DLR) under an ESA contract. Based on an efficient calibration strategy, this paper describes the different activities performed and discusses in detail the results and main findings of DLR during the commissioning phase (CP) of Sentinel-1 C. The main goal is to provide a comprehensive compendium of the SAR calibration and performance status of S1C at the beginning of its operational mission: At the end of the commissioning phase we find that S1C achieves or even exceeds all SAR performance requirements put forth and is ready for its nominal mission operations.
- 7 April 2026
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Journal of Selected Topics in Applied Earth Observations and Remote Sensing
- Vol. 19 (19391404) , 15833-15853
Open AccessIndependent SAR System Calibration of Sentinel-1C
Sentinel-1 C is the third satellite of the Sentinel-1 mission. Launched in late 2024, it ensures seamless continuity of C-band SAR data for global monitoring of the Earth surface in the framework of the Copernicus program. In parallel to the commissioning of Sentinel-1 C by the European Space Agency (ESA), an independent verification of the system calibration has been performed by the German Aerospace Center (DLR) under an ESA contract. Based on an efficient calibration strategy, this paper describes the different activities performed and discusses in detail the results and main findings of DLR during the commissioning phase (CP) of Sentinel-1 C. The main goal is to provide a comprehensive compendium of the SAR calibration and performance status of S1C at the beginning of its operational mission: At the end of the commissioning phase we find that S1C achieves or even exceeds all SAR performance requirements put forth and is ready for its nominal mission operations.