Milica Nikolić
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Milica Nikolić has a total of 4 co-authors. Here are the top co-authors by number of shared publications:
- Aleksandra Parezanović
University of Belgrade
1 shared publication - Ana Nadaždi
University of Belgrade
1 shared publication - Zoran Stojadinović
Faculty of Civil Engineering, University of Belgrade, Belgrade, Serbia
1 shared publication - Zorana Petojević
University of Belgrade
1 shared publication
Latest Publications
- 29 October 2026
- Published by Serbian Project Management Association
- p. 132-137
Integrating Project Control and Change Management in Construction Projects Using the ADKAR Model
A well-run project control cycle in construction tracks quantities, time, cost and quality, and the corrective measures that follow from it often come down to a requirement that someone start working differently. This transition is not explicitly addressed in the literature reviewed in this paper, even though it takes place whenever a control report initiates a measure that someone has to carry out. The paper proposes a conceptual integration by mapping the ADKAR model of individual change onto the project control cycle, with the point of overlap located at the corrective measure step. The operational plan sits outside ADKAR, while Progress Measurement and Trend Analysis together generate Awareness out of the control data themselves, and the corrective measure internally carries Hiatt’s original sequence from Desire to Reinforcement. Through this mapping, the corrective measure acquires a second side, as an implementation event carried out by people and as a small, recurring change event within a single control iteration.
- 29 October 2026
- Published by Serbian Project Management Association
- p. 132-137
Integrating Project Control and Change Management in Construction Projects Using the ADKAR Model
A well-run project control cycle in construction tracks quantities, time, cost and quality, and the corrective measures that follow from it often come down to a requirement that someone start working differently. This transition is not explicitly addressed in the literature reviewed in this paper, even though it takes place whenever a control report initiates a measure that someone has to carry out. The paper proposes a conceptual integration by mapping the ADKAR model of individual change onto the project control cycle, with the point of overlap located at the corrective measure step. The operational plan sits outside ADKAR, while Progress Measurement and Trend Analysis together generate Awareness out of the control data themselves, and the corrective measure internally carries Hiatt’s original sequence from Desire to Reinforcement. Through this mapping, the corrective measure acquires a second side, as an implementation event carried out by people and as a small, recurring change event within a single control iteration.
- Open Access
- 15 October 2026
- Published by Springer Nature
- p. 426-433
How Well Do Circularity Indicators Describe Recovery Potential in Existing Buildings at the End of Life? A Case Study in Belgrade, Serbia
- 15 October 2026
- Published by Springer Nature
- p. 426-433
Open AccessHow Well Do Circularity Indicators Describe Recovery Potential in Existing Buildings at the End of Life? A Case Study in Belgrade, Serbia