Lukas Schork
Lukas Schork has a total of 6 co-authors. Here are the top co-authors by number of shared publications:
- Anastasia Dushina
DLR Institute of Networked Energy Systems
1 shared publication - Christoph Streuling
Institute of Vehicle Concepts, DLR, Berlin, Germany
1 shared publication - John Selbig
Stadler Deutschland GmbH, Berlin, Germany
1 shared publication - Moritz Schenker
Institute of Vehicle Concepts, German Aerospace Center (DLR), Pfaffenwaldring 38-40, 70569 Stuttgart, Germany
1 shared publication - Peter Klement
DLR Institute of Networked Energy Systems, Oldenburg, Germany
1 shared publication - Stefan Arens
Institute of Networked Energy Systems, DLR, Oldenburg, Germany
1 shared publication
Latest Publications
- Open Access
- 14 November 2026
- Published by Springer Nature in Energy Informatics
- Vol. 9 (1) , 82
Pareto optimization of BEMU traction battery capacity and recharging infrastructure
The increasing integration of the energy and transport sectors requires efficient solutions for electrifying rail networks. Battery-powered trains (battery electric multiple units - BEMUs) offer a promising alternative to full electrification, but their range is limited by the current state of battery technology and recharging infrastructure. This study presents an optimization model that simultaneously optimizes the recharging infrastructure and traction batteries of the trains, enabling a system design based on BEMU power demand and timetable data. The model considers various factors, including route topology, timetable, charging infrastructure, and battery aging. A case study of a non-electrified mountain line considering two combinations of optimization targets and a case study for a long-distance line with partial electrification demonstrate the flexibility of the model and its applicability for different optimization tasks. The optimization results provide insights into the optimal dimensioning of charging infrastructure and batteries, considering factors such as heating ventilation and air conditioning (HVAC) demand, end-of-life capacity, discrete power of charging infrastructure, and battery replacement. Pareto-optimal system configurations are determined on the basis of stakeholder annuities (BEMU vs. electrification) and annuities versus minimal capacity buffer of the traction battery. Results indicate that Pareto-optimal BEMU annuities for the mountain line range from 1.27 to 1.31 mil€/a, whereas electrification annuities range from 0.50 to 1.36 mil€/a. This emphasizes designing systems for low electrification costs rather than low BEMU costs. The energy buffer of the traction batteries were increased by 37.2% by increasing the total annuity by 1.5%. A sensitivity analysis regarding parameters that define the Pareto front is conducted, which shows a shift in the Pareto fronts as a function of the sensitive parameters.
- 14 November 2026
- Published by Springer Nature in Energy Informatics
- Vol. 9 (1) , 82
Open AccessPareto optimization of BEMU traction battery capacity and recharging infrastructure
The increasing integration of the energy and transport sectors requires efficient solutions for electrifying rail networks. Battery-powered trains (battery electric multiple units - BEMUs) offer a promising alternative to full electrification, but their range is limited by the current state of battery technology and recharging infrastructure. This study presents an optimization model that simultaneously optimizes the recharging infrastructure and traction batteries of the trains, enabling a system design based on BEMU power demand and timetable data. The model considers various factors, including route topology, timetable, charging infrastructure, and battery aging. A case study of a non-electrified mountain line considering two combinations of optimization targets and a case study for a long-distance line with partial electrification demonstrate the flexibility of the model and its applicability for different optimization tasks. The optimization results provide insights into the optimal dimensioning of charging infrastructure and batteries, considering factors such as heating ventilation and air conditioning (HVAC) demand, end-of-life capacity, discrete power of charging infrastructure, and battery replacement. Pareto-optimal system configurations are determined on the basis of stakeholder annuities (BEMU vs. electrification) and annuities versus minimal capacity buffer of the traction battery. Results indicate that Pareto-optimal BEMU annuities for the mountain line range from 1.27 to 1.31 mil€/a, whereas electrification annuities range from 0.50 to 1.36 mil€/a. This emphasizes designing systems for low electrification costs rather than low BEMU costs. The energy buffer of the traction batteries were increased by 37.2% by increasing the total annuity by 1.5%. A sensitivity analysis regarding parameters that define the Pareto front is conducted, which shows a shift in the Pareto fronts as a function of the sensitive parameters.