International Journal of Hydropower and Civil Engineering
Published by AkiNik Publications
- Scilit
- Climate Change
- Water Resources
- Geotechnical Engineering
- Sustainability Studies
- Reliability Engineering
- AI & Machine Learning
Publications Analysis
Publications in 2016-2026
Open Access Publications in 2016-2026
- Total Citations
- 8
- Total Publications
- 38
- Average Citations
- 0.21
- Cited Publications
- 6
- Cited Publications %
- 15.8%
- Self Citations
- 0
- Self Citations %
- 0%
- h5_index
- 2
- Monthly Citation Metric (MCM)
- 0.32
- Q1
- 0
- Med
- 0
- Q3
- 1
- 99%
- 2.6
- Max
- 3
- Citing Source Titles
- Citing Publishers
Latest Publications
- Open Access
- 1 July 2026
- Published by AkiNik Publications in International Journal of Hydropower and Civil Engineering
- Vol. 7 (2) , 54-58
Rapid drawdown, dormant landslide, dam abutment, coupled analysis, seepage-deformation, factor of safety, reservoir operation, pore pressure, slope stability, Hardening Soil model
Himalayan rivers carry some of the highest suspended sediment loads on earth, and the silt-laden water that passes through run-of-river turbines erodes runner blades at rates that far exceed the design assumptions derived from European and North American operating experience. This research quantified the spatial distribution and severity of silt erosion on the 13 runner blades of a 45 MW Francis turbine at a run-of-river station on the Bhagirathi River in Uttarakhand, India. The turbine had accumulated 38,400 operating hours since its last major overhaul when a scheduled inspection in April 2024 provided access for detailed measurement. Blade thickness was mapped at 126 grid points per blade (five spanwise sections, each with 25-28 chordwise measurement stations) using a portable ultrasonic thickness gauge. Silt concentration data logged at the intake over the preceding 18 months showed a mean of 11.4 g/L during the monsoon season (June-September) and 2.3 g/L during the dry season, with instantaneous peaks exceeding 40 g/L during glacial lake outburst flood events. The leading edge of the blade experienced the highest mean erosion rate of 0.187 mm per 1000 operating hours 2.97 times the rate at the pressure side (0.063 mm/1000 h). A power-law regression between silt concentration and erosion rate yielded an exponent of 1.38 (r = 0.93, p < 0.001), confirming that erosion accelerates non-linearly with sediment load. Residual life was estimated by extrapolating the measured thickness loss to the minimum allowable wall thickness specified by the turbine manufacturer; the leading edge is projected to reach the limit after an additional 2,940 hours (approximately 0.5 years at current utilisation), while the pressure side retains an estimated 9.2 years of service. Two figures and three tables summarise the erosion map, the concentration-erosion relationship and the residual life estimates. These findings support a shift from fixed-interval to condition-based overhaul scheduling, with the leading edge as the life-limiting zone.
- 1 July 2026
- Published by AkiNik Publications in International Journal of Hydropower and Civil Engineering
- Vol. 7 (2) , 54-58
Open AccessRapid drawdown, dormant landslide, dam abutment, coupled analysis, seepage-deformation, factor of safety, reservoir operation, pore pressure, slope stability, Hardening Soil model
Himalayan rivers carry some of the highest suspended sediment loads on earth, and the silt-laden water that passes through run-of-river turbines erodes runner blades at rates that far exceed the design assumptions derived from European and North American operating experience. This research quantified the spatial distribution and severity of silt erosion on the 13 runner blades of a 45 MW Francis turbine at a run-of-river station on the Bhagirathi River in Uttarakhand, India. The turbine had accumulated 38,400 operating hours since its last major overhaul when a scheduled inspection in April 2024 provided access for detailed measurement. Blade thickness was mapped at 126 grid points per blade (five spanwise sections, each with 25-28 chordwise measurement stations) using a portable ultrasonic thickness gauge. Silt concentration data logged at the intake over the preceding 18 months showed a mean of 11.4 g/L during the monsoon season (June-September) and 2.3 g/L during the dry season, with instantaneous peaks exceeding 40 g/L during glacial lake outburst flood events. The leading edge of the blade experienced the highest mean erosion rate of 0.187 mm per 1000 operating hours 2.97 times the rate at the pressure side (0.063 mm/1000 h). A power-law regression between silt concentration and erosion rate yielded an exponent of 1.38 (r = 0.93, p < 0.001), confirming that erosion accelerates non-linearly with sediment load. Residual life was estimated by extrapolating the measured thickness loss to the minimum allowable wall thickness specified by the turbine manufacturer; the leading edge is projected to reach the limit after an additional 2,940 hours (approximately 0.5 years at current utilisation), while the pressure side retains an estimated 9.2 years of service. Two figures and three tables summarise the erosion map, the concentration-erosion relationship and the residual life estimates. These findings support a shift from fixed-interval to condition-based overhaul scheduling, with the leading edge as the life-limiting zone.
- Open Access
- 1 July 2026
- Published by AkiNik Publications in International Journal of Hydropower and Civil Engineering
- Vol. 7 (2) , 49-53
Coupled seepage-deformation analysis of dormant landslide reactivation risk in dam abutment slopes under rapid reservoir drawdown conditions
Leading geotechnical authorities have long warned that dormant landslides in dam abutment slopes may reactivate during rapid reservoir drawdown, yet most dam safety assessments still treat the abutment as a static boundary condition. This research applied a fully coupled seepage-deformation finite-element model to evaluate the reactivation risk of a documented dormant rotational landslide in the left abutment of a 62 m-high concrete gravity dam in the southern Apennines near Potenza, Italy. The model was built in PLAXIS 2D using the Hardening Soil constitutive model with permeability updated at each time step as a function of void ratio (e-k coupling). Five drawdown rates 0.5, 1.0, 2.0, 3.0 and 5.0 m/day were simulated over a 30-day window. The coupled analysis predicted a minimum factor of safety (FOS) of 0.89 at the fastest drawdown rate, compared with 1.41 from an uncoupled analysis of the same scenario an overestimation of 58% by the conventional uncoupled approach. The FOS dropped below 1.0 at a drawdown rate of approximately 3.8 m/day in the coupled model, whereas the uncoupled model never predicted instability within the tested range. Two figures and three tables present the FOS comparison, the coupled modelling framework and the sensitivity of the critical drawdown rate to soil permeability and shear strength parameters. These results demonstrate that coupled seepage-deformation analysis is essential for drawdown risk assessment of abutment slopes containing dormant landslides, because the uncoupled approach systematically overestimates stability by ignoring the feedback between pore-pressure dissipation and soil deformation.
- 1 July 2026
- Published by AkiNik Publications in International Journal of Hydropower and Civil Engineering
- Vol. 7 (2) , 49-53
Open AccessCoupled seepage-deformation analysis of dormant landslide reactivation risk in dam abutment slopes under rapid reservoir drawdown conditions
Leading geotechnical authorities have long warned that dormant landslides in dam abutment slopes may reactivate during rapid reservoir drawdown, yet most dam safety assessments still treat the abutment as a static boundary condition. This research applied a fully coupled seepage-deformation finite-element model to evaluate the reactivation risk of a documented dormant rotational landslide in the left abutment of a 62 m-high concrete gravity dam in the southern Apennines near Potenza, Italy. The model was built in PLAXIS 2D using the Hardening Soil constitutive model with permeability updated at each time step as a function of void ratio (e-k coupling). Five drawdown rates 0.5, 1.0, 2.0, 3.0 and 5.0 m/day were simulated over a 30-day window. The coupled analysis predicted a minimum factor of safety (FOS) of 0.89 at the fastest drawdown rate, compared with 1.41 from an uncoupled analysis of the same scenario an overestimation of 58% by the conventional uncoupled approach. The FOS dropped below 1.0 at a drawdown rate of approximately 3.8 m/day in the coupled model, whereas the uncoupled model never predicted instability within the tested range. Two figures and three tables present the FOS comparison, the coupled modelling framework and the sensitivity of the critical drawdown rate to soil permeability and shear strength parameters. These results demonstrate that coupled seepage-deformation analysis is essential for drawdown risk assessment of abutment slopes containing dormant landslides, because the uncoupled approach systematically overestimates stability by ignoring the feedback between pore-pressure dissipation and soil deformation.
- Open Access
- 1 July 2026
- Published by AkiNik Publications in International Journal of Hydropower and Civil Engineering
- Vol. 7 (2) , 43-48
Influence of pre-existing lift joint cracks on nonlinear seismic response and sliding stability of concrete gravity dams under near-fault pulse-like ground motions
The 2017 post-earthquake inspection of a 78 m-high concrete gravity dam in northwestern Iran revealed that horizontal lift joint cracks extending to 30% of the base width had been present before the seismic event, yet had not been included in the original seismic safety assessment. This research investigated how such pre-existing lift joint cracks influence the nonlinear dynamic response and sliding stability of concrete gravity dams subjected to near-fault pulse-like ground motions. A two-dimensional finite-element model of a representative 80 m-high gravity dam was developed in ABAQUS using the concrete damaged plasticity (CDP) constitutive model, with discrete crack planes inserted at three lift joint elevations. Four crack-depth scenarios were analysed intact, shallow (0.15H), medium (0.30H) and deep (0.50H) under a suite of seven near-fault pulse-like records scaled to five peak ground acceleration (PGA) levels from 0.15 g to 0.55 g. The analysis accounted for dam-reservoir-foundation interaction through acoustic fluid elements and Lysmer-Kuhlmann absorbing boundaries. Results showed that a deep pre-existing crack at the base increased peak crest displacement by 166% (from 34.7 mm to 92.4 mm) and residual sliding by 357% (from 13.6 mm to 62.1 mm) at PGA = 0.55 g relative to the intact dam. The radar chart of normalised response parameters confirmed that every metric worsened monotonically with crack depth. The sliding safety factor dropped below 1.0 at PGA = 0.35 g for the deep-crack scenario, compared with PGA = 0.55 g for the intact dam a reduction in the critical PGA of 36%. Four figures and two tables present the parametric results, the failure mechanism and the sensitivity of sliding to PGA and crack depth. These findings show that seismic safety evaluations of existing gravity dams must include a realistic representation of lift joint cracks, because the conventional assumption of a monolithic cross-section can overestimate the critical PGA by more than one-third.
- 1 July 2026
- Published by AkiNik Publications in International Journal of Hydropower and Civil Engineering
- Vol. 7 (2) , 43-48
Open AccessInfluence of pre-existing lift joint cracks on nonlinear seismic response and sliding stability of concrete gravity dams under near-fault pulse-like ground motions
The 2017 post-earthquake inspection of a 78 m-high concrete gravity dam in northwestern Iran revealed that horizontal lift joint cracks extending to 30% of the base width had been present before the seismic event, yet had not been included in the original seismic safety assessment. This research investigated how such pre-existing lift joint cracks influence the nonlinear dynamic response and sliding stability of concrete gravity dams subjected to near-fault pulse-like ground motions. A two-dimensional finite-element model of a representative 80 m-high gravity dam was developed in ABAQUS using the concrete damaged plasticity (CDP) constitutive model, with discrete crack planes inserted at three lift joint elevations. Four crack-depth scenarios were analysed intact, shallow (0.15H), medium (0.30H) and deep (0.50H) under a suite of seven near-fault pulse-like records scaled to five peak ground acceleration (PGA) levels from 0.15 g to 0.55 g. The analysis accounted for dam-reservoir-foundation interaction through acoustic fluid elements and Lysmer-Kuhlmann absorbing boundaries. Results showed that a deep pre-existing crack at the base increased peak crest displacement by 166% (from 34.7 mm to 92.4 mm) and residual sliding by 357% (from 13.6 mm to 62.1 mm) at PGA = 0.55 g relative to the intact dam. The radar chart of normalised response parameters confirmed that every metric worsened monotonically with crack depth. The sliding safety factor dropped below 1.0 at PGA = 0.35 g for the deep-crack scenario, compared with PGA = 0.55 g for the intact dam a reduction in the critical PGA of 36%. Four figures and two tables present the parametric results, the failure mechanism and the sensitivity of sliding to PGA and crack depth. These findings show that seismic safety evaluations of existing gravity dams must include a realistic representation of lift joint cracks, because the conventional assumption of a monolithic cross-section can overestimate the critical PGA by more than one-third.
- Open Access
- 1 July 2026
- Published by AkiNik Publications in International Journal of Hydropower and Civil Engineering
- Vol. 7 (2) , 38-42
Energy recovery potential and hydraulic impact assessment of inline micro-turbines replacing pressure-reducing valves in gravity-fed water supply networks
While pressure-reducing valves (PRVs) in water distribution networks dissipate excess hydraulic energy as heat and noise, inline micro-turbines can convert that same energy into electricity. This research assessed the energy recovery potential and downstream hydraulic impact of replacing five PRVs with inline micro-turbines in a gravity-fed water supply network serving 47,000 inhabitants near Coimbra, Portugal. A calibrated EPANET hydraulic model of the network was used to extract flow and pressure data at each PRV location over a 12-month period (January to December 2024). Turbine sizing followed a best-efficiency-point selection procedure, and energy recovery was estimated from the product of available head, flow rate and turbine efficiency at each 15-minute time step. The combined annual energy recovery across five sites was 312.8 MWh, with PRV-1 on the trunk main contributing the largest share (34.2%). Downstream pressure remained within the regulatory band (20-60 m) at all demand nodes under all tested scenarios. Three figures and two tables present the energy distribution, the assessment methodology and the site-by-site feasibility ranking. The estimated payback period ranged from 3.7 to 8.4 years depending on site, making all five installations economically viable under current Portuguese feed-in tariff conditions.
- 1 July 2026
- Published by AkiNik Publications in International Journal of Hydropower and Civil Engineering
- Vol. 7 (2) , 38-42
Open AccessEnergy recovery potential and hydraulic impact assessment of inline micro-turbines replacing pressure-reducing valves in gravity-fed water supply networks
While pressure-reducing valves (PRVs) in water distribution networks dissipate excess hydraulic energy as heat and noise, inline micro-turbines can convert that same energy into electricity. This research assessed the energy recovery potential and downstream hydraulic impact of replacing five PRVs with inline micro-turbines in a gravity-fed water supply network serving 47,000 inhabitants near Coimbra, Portugal. A calibrated EPANET hydraulic model of the network was used to extract flow and pressure data at each PRV location over a 12-month period (January to December 2024). Turbine sizing followed a best-efficiency-point selection procedure, and energy recovery was estimated from the product of available head, flow rate and turbine efficiency at each 15-minute time step. The combined annual energy recovery across five sites was 312.8 MWh, with PRV-1 on the trunk main contributing the largest share (34.2%). Downstream pressure remained within the regulatory band (20-60 m) at all demand nodes under all tested scenarios. Three figures and two tables present the energy distribution, the assessment methodology and the site-by-site feasibility ranking. The estimated payback period ranged from 3.7 to 8.4 years depending on site, making all five installations economically viable under current Portuguese feed-in tariff conditions.
- Open Access
- 1 July 2026
- Published by AkiNik Publications in International Journal of Hydropower and Civil Engineering
- Vol. 7 (2) , 33-37
Structural performance of prefabricated ultra-high-performance concrete overlay panels as a retrofit solution for deteriorated spillway chute slabs
Spillway chute slabs on ageing concrete dams are increasingly showing signs of surface erosion, cavitation damage and reinforcement corrosion that compromise hydraulic performance and structural safety. This research evaluated prefabricated ultra-high-performance concrete (UHPC) overlay panels as a non-demolition retrofit for deteriorated spillway chutes. Thirty UHPC panels (1,200 x 600 x 40 mm) were manufactured using heat-cured fibre-reinforced cementitious composites with 2% steel fibres by volume, achieving a mean 28-day compressive strength of 152.7 MPa. The panels were bonded to a full-scale mock-up of a degraded spillway chute slab at the Chungju Institute of Water Resources Technology, South Korea, between March 2024 and November 2024. Bond strength was measured by pull-off testing at 30 grid locations across the overlay, yielding a mean of 2.58 MPa with a spatial pattern showing higher values in the central zone (3.12 MPa at Row C, Col 3) and lower values at the edges (2.09 MPa). Structural load testing applied a 250 kN point load at midspan, producing a maximum deflection of 1.87 mm in the overlaid section versus 4.63 mm in the bare deteriorated slab a 60% reduction in deformation. No debonding or cracking was observed in the UHPC layer at the maximum test load. Three figures and two tables present the bond strength distribution, the installation workflow and the mechanical property comparison between UHPC and conventional concrete. A cost comparison showed that the UHPC overlay retrofit costs approximately 38% less per square metre than full slab replacement when mobilisation and dewatering are included. These results indicate that prefabricated UHPC overlays are a structurally effective and economically attractive rehabilitation strategy for spillway infrastructure nearing the end of its design life.
- 1 July 2026
- Published by AkiNik Publications in International Journal of Hydropower and Civil Engineering
- Vol. 7 (2) , 33-37
Open AccessStructural performance of prefabricated ultra-high-performance concrete overlay panels as a retrofit solution for deteriorated spillway chute slabs
Spillway chute slabs on ageing concrete dams are increasingly showing signs of surface erosion, cavitation damage and reinforcement corrosion that compromise hydraulic performance and structural safety. This research evaluated prefabricated ultra-high-performance concrete (UHPC) overlay panels as a non-demolition retrofit for deteriorated spillway chutes. Thirty UHPC panels (1,200 x 600 x 40 mm) were manufactured using heat-cured fibre-reinforced cementitious composites with 2% steel fibres by volume, achieving a mean 28-day compressive strength of 152.7 MPa. The panels were bonded to a full-scale mock-up of a degraded spillway chute slab at the Chungju Institute of Water Resources Technology, South Korea, between March 2024 and November 2024. Bond strength was measured by pull-off testing at 30 grid locations across the overlay, yielding a mean of 2.58 MPa with a spatial pattern showing higher values in the central zone (3.12 MPa at Row C, Col 3) and lower values at the edges (2.09 MPa). Structural load testing applied a 250 kN point load at midspan, producing a maximum deflection of 1.87 mm in the overlaid section versus 4.63 mm in the bare deteriorated slab a 60% reduction in deformation. No debonding or cracking was observed in the UHPC layer at the maximum test load. Three figures and two tables present the bond strength distribution, the installation workflow and the mechanical property comparison between UHPC and conventional concrete. A cost comparison showed that the UHPC overlay retrofit costs approximately 38% less per square metre than full slab replacement when mobilisation and dewatering are included. These results indicate that prefabricated UHPC overlays are a structurally effective and economically attractive rehabilitation strategy for spillway infrastructure nearing the end of its design life.
- Open Access
- 1 July 2026
- Published by AkiNik Publications in International Journal of Hydropower and Civil Engineering
- Vol. 7 (2) , 28-32
Load-settlement behavior of geosynthetic-encased stone columns supporting irrigation canal embankments constructed on soft organic clay
Geosynthetic-encased stone columns (GESCs) are ground improvement elements in which a conventional granular column is wrapped in a high-stiffness geotextile or geogrid sleeve that provides lateral confinement, preventing the radial bulging that limits the load capacity of ordinary stone columns in very soft soils. This research investigated the load-settlement response of GESCs installed beneath a prototype irrigation canal embankment founded on soft organic clay in the lower Mun River floodplain near Nakhon Ratchasima, Thailand. Twelve instrumented stone columns six encased in a woven polypropylene geotextile with an ultimate tensile strength of 200 kN/m and six left unencased as controls were installed by the displacement method to a depth of 8.5 m through organic clay with an undrained shear strength of 8-14 kPa and a natural moisture content of 92-118%. A 3.2 m-high trial embankment was constructed over the treated zone in stages over 16 weeks between March and June 2024, with settlement plates, inclinometers and piezometers monitored continuously until November 2024. At the design embankment pressure of 150 kPa, the median settlement of the encased columns was 23.4 mm compared with 41.7 mm for the ordinary columns and 68.3 mm for the untreated ground reductions of 44% and 66% respectively. The stress concentration ratio for the encased columns reached 4.8, versus 2.9 for the ordinary columns, confirming that the geosynthetic sleeve stiffens the column and attracts a larger share of the applied load. A correlation analysis between column diameter ratio (post-installation diameter divided by design diameter) and settlement showed a Spearman coefficient of -0.74 (p < 0.001) for encased columns, indicating that columns that expanded more during installation settled less. Three tables and two figures a box plot of settlement distributions and a cycle diagram of the load transfer mechanism present the key outcomes. The encased columns also showed 63% less lateral displacement at the column mid-depth than the ordinary columns, confirming the confinement function of the geosynthetic. Cost analysis showed a 24% premium for encasement over ordinary stone columns, offset by a 31% reduction in required column length due to the higher load capacity per unit length. These results support the use of GESCs as a cost-effective ground improvement solution for irrigation canal embankments on soft organic deposits where ordinary stone columns would undergo excessive bulging.
- 1 July 2026
- Published by AkiNik Publications in International Journal of Hydropower and Civil Engineering
- Vol. 7 (2) , 28-32
Open AccessLoad-settlement behavior of geosynthetic-encased stone columns supporting irrigation canal embankments constructed on soft organic clay
Geosynthetic-encased stone columns (GESCs) are ground improvement elements in which a conventional granular column is wrapped in a high-stiffness geotextile or geogrid sleeve that provides lateral confinement, preventing the radial bulging that limits the load capacity of ordinary stone columns in very soft soils. This research investigated the load-settlement response of GESCs installed beneath a prototype irrigation canal embankment founded on soft organic clay in the lower Mun River floodplain near Nakhon Ratchasima, Thailand. Twelve instrumented stone columns six encased in a woven polypropylene geotextile with an ultimate tensile strength of 200 kN/m and six left unencased as controls were installed by the displacement method to a depth of 8.5 m through organic clay with an undrained shear strength of 8-14 kPa and a natural moisture content of 92-118%. A 3.2 m-high trial embankment was constructed over the treated zone in stages over 16 weeks between March and June 2024, with settlement plates, inclinometers and piezometers monitored continuously until November 2024. At the design embankment pressure of 150 kPa, the median settlement of the encased columns was 23.4 mm compared with 41.7 mm for the ordinary columns and 68.3 mm for the untreated ground reductions of 44% and 66% respectively. The stress concentration ratio for the encased columns reached 4.8, versus 2.9 for the ordinary columns, confirming that the geosynthetic sleeve stiffens the column and attracts a larger share of the applied load. A correlation analysis between column diameter ratio (post-installation diameter divided by design diameter) and settlement showed a Spearman coefficient of -0.74 (p < 0.001) for encased columns, indicating that columns that expanded more during installation settled less. Three tables and two figures a box plot of settlement distributions and a cycle diagram of the load transfer mechanism present the key outcomes. The encased columns also showed 63% less lateral displacement at the column mid-depth than the ordinary columns, confirming the confinement function of the geosynthetic. Cost analysis showed a 24% premium for encasement over ordinary stone columns, offset by a 31% reduction in required column length due to the higher load capacity per unit length. These results support the use of GESCs as a cost-effective ground improvement solution for irrigation canal embankments on soft organic deposits where ordinary stone columns would undergo excessive bulging.
- Open Access
- 1 July 2026
- Published by AkiNik Publications in International Journal of Hydropower and Civil Engineering
- Vol. 7 (2) , 22-27
Performance assessment of 3D-printed cementitious canal lining sections under combined cyclic wetting-drying and hydraulic abrasion loading
When Australia began lining its irrigation canals with concrete in the 1950s, the technology relied entirely on slip-form or hand-cast placement methods that have remained largely unchanged for seven decades. This research evaluated an alternative: robotic 3D printing of cementitious canal lining sections using a gantry-mounted extrusion system. Twelve full-scale lining panels (600 mm wide, 1,200 mm long, 75 mm thick) were produced six by 3D printing and six by conventional cast-in-place methods and subjected to 150 accelerated wetting-drying (W-D) cycles followed by 48 hours of hydraulic abrasion testing in a rotating-drum apparatus. The research was carried out at a materials testing laboratory in Shepparton, Victoria, between February 2024 and December 2024. After 150 W-D cycles the 3D-printed panels retained 74.2% of their initial flexural strength versus 62.4% for the cast panels, a statistically significant difference (p = 0.008, two-sample t-test). Cumulative mass loss was 2.97% for printed and 4.23% for cast specimens. In the subsequent abrasion test, the printed panels lost 1.28 mm of surface depth compared with 2.04 mm for cast panels over 48 hours. Four figures and two tables summarise the degradation curves, the printing process schematic, the abrasion response and the durability metrics. The superior durability of the printed specimens is attributed to the denser packing achieved by the extrusion nozzle and the absence of formwork-induced surface voids. A cost analysis showed that the printed panels were 18% more expensive per square metre at current small-batch volumes but would reach cost parity at a production rate of approximately 1,200 square metres per day. These findings suggest that 3D-printed canal linings are technically viable for rehabilitation of ageing irrigation infrastructure and may become economically competitive as the technology scales.
- 1 July 2026
- Published by AkiNik Publications in International Journal of Hydropower and Civil Engineering
- Vol. 7 (2) , 22-27
Open AccessPerformance assessment of 3D-printed cementitious canal lining sections under combined cyclic wetting-drying and hydraulic abrasion loading
When Australia began lining its irrigation canals with concrete in the 1950s, the technology relied entirely on slip-form or hand-cast placement methods that have remained largely unchanged for seven decades. This research evaluated an alternative: robotic 3D printing of cementitious canal lining sections using a gantry-mounted extrusion system. Twelve full-scale lining panels (600 mm wide, 1,200 mm long, 75 mm thick) were produced six by 3D printing and six by conventional cast-in-place methods and subjected to 150 accelerated wetting-drying (W-D) cycles followed by 48 hours of hydraulic abrasion testing in a rotating-drum apparatus. The research was carried out at a materials testing laboratory in Shepparton, Victoria, between February 2024 and December 2024. After 150 W-D cycles the 3D-printed panels retained 74.2% of their initial flexural strength versus 62.4% for the cast panels, a statistically significant difference (p = 0.008, two-sample t-test). Cumulative mass loss was 2.97% for printed and 4.23% for cast specimens. In the subsequent abrasion test, the printed panels lost 1.28 mm of surface depth compared with 2.04 mm for cast panels over 48 hours. Four figures and two tables summarise the degradation curves, the printing process schematic, the abrasion response and the durability metrics. The superior durability of the printed specimens is attributed to the denser packing achieved by the extrusion nozzle and the absence of formwork-induced surface voids. A cost analysis showed that the printed panels were 18% more expensive per square metre at current small-batch volumes but would reach cost parity at a production rate of approximately 1,200 square metres per day. These findings suggest that 3D-printed canal linings are technically viable for rehabilitation of ageing irrigation infrastructure and may become economically competitive as the technology scales.
- Open Access
- 1 July 2026
- Published by AkiNik Publications in International Journal of Hydropower and Civil Engineering
- Vol. 7 (2) , 17-21
Development of a fuzzy-AHP based multi-criteria decision framework for selecting optimal sediment management strategies in run-of-river hydropower reservoirs
Sediment accumulation is the single greatest threat to the operational longevity of run-of-river hydropower reservoirs in the East African highlands. This research developed and applied a fuzzy analytic hierarchy process (fuzzy-AHP) multi-criteria decision framework to rank five sediment management strategies for a 40 MW run-of-river scheme on the Tis Issat diversion near Bahir Dar, Ethiopia. Six evaluation criteria spanning technical effectiveness, economic feasibility and environmental acceptability were structured into a three-level hierarchy. Twelve domain experts hydropower engineers, environmental scientists and water-resource economists provided pairwise comparison judgements using a nine-point linguistic scale that was converted to triangular fuzzy numbers to capture the imprecision inherent in expert opinion. Consistency ratios for all individual judgement matrices fell below the 0.10 threshold recommended by Saaty, confirming acceptable internal coherence. After defuzzification by the centroid method, sediment flushing received the highest composite priority score of 0.247, followed by sluicing at 0.213, dredging at 0.198, sediment bypass tunnelling at 0.178 and upstream check dams at 0.164. A sensitivity analysis that varied the weight of the cost criterion from 0.08 to 0.28 showed that the ranking remained stable across 78% of the tested range, reversing only when cost weight exceeded 0.24, at which point dredging overtook flushing. Two figures and three tables present the framework architecture, criteria weights and strategy scores. The framework is transferable to other sediment-laden catchments and provides a transparent, replicable basis for investment decisions that standard benefit-cost analysis alone cannot deliver.
- 1 July 2026
- Published by AkiNik Publications in International Journal of Hydropower and Civil Engineering
- Vol. 7 (2) , 17-21
Open AccessDevelopment of a fuzzy-AHP based multi-criteria decision framework for selecting optimal sediment management strategies in run-of-river hydropower reservoirs
Sediment accumulation is the single greatest threat to the operational longevity of run-of-river hydropower reservoirs in the East African highlands. This research developed and applied a fuzzy analytic hierarchy process (fuzzy-AHP) multi-criteria decision framework to rank five sediment management strategies for a 40 MW run-of-river scheme on the Tis Issat diversion near Bahir Dar, Ethiopia. Six evaluation criteria spanning technical effectiveness, economic feasibility and environmental acceptability were structured into a three-level hierarchy. Twelve domain experts hydropower engineers, environmental scientists and water-resource economists provided pairwise comparison judgements using a nine-point linguistic scale that was converted to triangular fuzzy numbers to capture the imprecision inherent in expert opinion. Consistency ratios for all individual judgement matrices fell below the 0.10 threshold recommended by Saaty, confirming acceptable internal coherence. After defuzzification by the centroid method, sediment flushing received the highest composite priority score of 0.247, followed by sluicing at 0.213, dredging at 0.198, sediment bypass tunnelling at 0.178 and upstream check dams at 0.164. A sensitivity analysis that varied the weight of the cost criterion from 0.08 to 0.28 showed that the ranking remained stable across 78% of the tested range, reversing only when cost weight exceeded 0.24, at which point dredging overtook flushing. Two figures and three tables present the framework architecture, criteria weights and strategy scores. The framework is transferable to other sediment-laden catchments and provides a transparent, replicable basis for investment decisions that standard benefit-cost analysis alone cannot deliver.
- Open Access
- 1 July 2026
- Published by AkiNik Publications in International Journal of Hydropower and Civil Engineering
- Vol. 7 (2) , 11-16
Effect of sustained turbine-induced low-frequency vibrations on long-term fatigue degradation of anchor bolts in hydropower draft tube concrete linings
Approximately 68% of reported anchor bolt replacements in South American hydropower draft tubes over the past two decades have been attributed to fatigue rather than corrosion alone. This research examined the effect of sustained low-frequency vibrations generated by Francis turbines on the long-term fatigue degradation of post-installed adhesive anchor bolts embedded in reinforced concrete draft tube linings. The investigation was conducted at a 1,400 MW hydropower station near Foz do Iguaçu, Brazil, where six generating units have operated continuously since 1994. A total of 144 M24 anchor bolts arranged in six circumferential rings around the draft tube elbow of Unit 3 were instrumented with strain gauges and piezoelectric accelerometers over a 14-month monitoring period from January 2024 to February 2025. Vibration spectra recorded at the bolt embedment zone showed dominant energy in the 2-15 Hz band, with peak displacement amplitudes of 0.34 mm at the turbine runner frequency of 5.7 Hz. Residual bolt tension was measured ultrasonically at the start and end of the monitoring window, and 24 bolts were extracted for metallographic examination of thread-root cross-sections. Results revealed that bolts positioned at the 3-o-clock and 9-o-clock meridians (B3 and B6), where vibration amplitudes were highest, lost 32.7% and 29.2% of their initial preload respectively over the monitoring period. Fatigue cracking at the first engaged thread root was the dominant failure mode, accounting for 37.5% of all observed degradation patterns, followed by corrosion-assisted cracking at 24.3%. A heatmap of residual tension against dominant vibration band confirmed that tension loss accelerated above 7 Hz regardless of bolt position. The pathway from vibration input to capacity failure followed a dual mechanism: cyclic stress transfer to the bolt shank coupled with progressive micro-cracking in the surrounding concrete cone. Two tables of bolt performance data and three figures summarise the outcomes. The measured fatigue life consumed during 14 months was between 4.1% and 9.3% of the design endurance limit depending on position, which extrapolates to a remaining service life of 12-24 years for the most exposed bolts well short of the 50-year design horizon. These results show that periodic ultrasonic tension audits at intervals no longer than five years should be standard practice for draft tube anchor bolts in stations subject to sustained low-frequency excitation.
- 1 July 2026
- Published by AkiNik Publications in International Journal of Hydropower and Civil Engineering
- Vol. 7 (2) , 11-16
Open AccessEffect of sustained turbine-induced low-frequency vibrations on long-term fatigue degradation of anchor bolts in hydropower draft tube concrete linings
Approximately 68% of reported anchor bolt replacements in South American hydropower draft tubes over the past two decades have been attributed to fatigue rather than corrosion alone. This research examined the effect of sustained low-frequency vibrations generated by Francis turbines on the long-term fatigue degradation of post-installed adhesive anchor bolts embedded in reinforced concrete draft tube linings. The investigation was conducted at a 1,400 MW hydropower station near Foz do Iguaçu, Brazil, where six generating units have operated continuously since 1994. A total of 144 M24 anchor bolts arranged in six circumferential rings around the draft tube elbow of Unit 3 were instrumented with strain gauges and piezoelectric accelerometers over a 14-month monitoring period from January 2024 to February 2025. Vibration spectra recorded at the bolt embedment zone showed dominant energy in the 2-15 Hz band, with peak displacement amplitudes of 0.34 mm at the turbine runner frequency of 5.7 Hz. Residual bolt tension was measured ultrasonically at the start and end of the monitoring window, and 24 bolts were extracted for metallographic examination of thread-root cross-sections. Results revealed that bolts positioned at the 3-o-clock and 9-o-clock meridians (B3 and B6), where vibration amplitudes were highest, lost 32.7% and 29.2% of their initial preload respectively over the monitoring period. Fatigue cracking at the first engaged thread root was the dominant failure mode, accounting for 37.5% of all observed degradation patterns, followed by corrosion-assisted cracking at 24.3%. A heatmap of residual tension against dominant vibration band confirmed that tension loss accelerated above 7 Hz regardless of bolt position. The pathway from vibration input to capacity failure followed a dual mechanism: cyclic stress transfer to the bolt shank coupled with progressive micro-cracking in the surrounding concrete cone. Two tables of bolt performance data and three figures summarise the outcomes. The measured fatigue life consumed during 14 months was between 4.1% and 9.3% of the design endurance limit depending on position, which extrapolates to a remaining service life of 12-24 years for the most exposed bolts well short of the 50-year design horizon. These results show that periodic ultrasonic tension audits at intervals no longer than five years should be standard practice for draft tube anchor bolts in stations subject to sustained low-frequency excitation.
- 1 July 2026
- Published by AkiNik Publications in International Journal of Hydropower and Civil Engineering
- Vol. 7 (2) , 01-10
Structural load dynamics of rooftop photovoltaic installations: A PRISMA-guided typology-specific critical review
Background and objective: PV arrays, mounting rails, ballast blocks and PV-specific aerodynamic interference are gravity, wind, snow and seismic actions that are added to existing roof structures that were not necessarily designed for PV arrays. This review emphasizes the synthesis of published structural-load evidence for flat roofs, pitched/gabled roofs, and steel truss roofs and the extent to which existing analytical techniques and design guidelines facilitate reliable pre-installation assessment. Methods: A search was carried out using the PRISMA guidelines, limiting the sources found to peer-reviewed studies and indexed conference records between January 2014 and May 2026, focusing on finding quantitative structural-load data for rooftop PV systems. Relevant standards, building codes, and technical guidance documents were additionally retained to support structural-code interpretation and design-context discussion. Eighteen cited records were retained for the final qualitative engineering synthesis. Key findings: Wind loading is the most frequently reported governing action in the reviewed rooftop-PV structural literature; however, the governing design action remains site-, climate-, and typology-dependent. Flat roofs are strongly influenced by corner/edge suction, ballast and membrane behavior, and local residual capacity. Pitched and gabled roofs require explicit consideration of roof pitch, panel tilt, azimuth, ridge/eave zones, and connection detailing. Steel truss roofs are sensitive to eccentric point loads and disrupted load paths through purlins, chords, and end-bay bracing. ASCE/SEI 7-22 contains PV-relevant provisions for rooftop solar panels, including seismic requirements in Section 13.6.12 and wind provisions primarily through Chapter 29, including Sections 29.4.3 and 29.4.4, with Chapter 31 applicable where wind-tunnel or project-specific aerodynamic procedures are required; nevertheless, comprehensive guidance remains limited for retrofit capacity verification, multi-hazard interaction, long-term monitoring, and typology-specific global-load transfer. Conclusion: A source-constrained evidence synthesis, a code-consistency review, and a practical retrofit-assessment framework are presented. The results support mandatory structural screening before PV installation, with escalation to wind-tunnel, CFD, finite element, or reliability-based assessment where simple prescriptive checks are insufficient.
- 1 July 2026
- Published by AkiNik Publications in International Journal of Hydropower and Civil Engineering
- Vol. 7 (2) , 01-10
Structural load dynamics of rooftop photovoltaic installations: A PRISMA-guided typology-specific critical review
Background and objective: PV arrays, mounting rails, ballast blocks and PV-specific aerodynamic interference are gravity, wind, snow and seismic actions that are added to existing roof structures that were not necessarily designed for PV arrays. This review emphasizes the synthesis of published structural-load evidence for flat roofs, pitched/gabled roofs, and steel truss roofs and the extent to which existing analytical techniques and design guidelines facilitate reliable pre-installation assessment. Methods: A search was carried out using the PRISMA guidelines, limiting the sources found to peer-reviewed studies and indexed conference records between January 2014 and May 2026, focusing on finding quantitative structural-load data for rooftop PV systems. Relevant standards, building codes, and technical guidance documents were additionally retained to support structural-code interpretation and design-context discussion. Eighteen cited records were retained for the final qualitative engineering synthesis. Key findings: Wind loading is the most frequently reported governing action in the reviewed rooftop-PV structural literature; however, the governing design action remains site-, climate-, and typology-dependent. Flat roofs are strongly influenced by corner/edge suction, ballast and membrane behavior, and local residual capacity. Pitched and gabled roofs require explicit consideration of roof pitch, panel tilt, azimuth, ridge/eave zones, and connection detailing. Steel truss roofs are sensitive to eccentric point loads and disrupted load paths through purlins, chords, and end-bay bracing. ASCE/SEI 7-22 contains PV-relevant provisions for rooftop solar panels, including seismic requirements in Section 13.6.12 and wind provisions primarily through Chapter 29, including Sections 29.4.3 and 29.4.4, with Chapter 31 applicable where wind-tunnel or project-specific aerodynamic procedures are required; nevertheless, comprehensive guidance remains limited for retrofit capacity verification, multi-hazard interaction, long-term monitoring, and typology-specific global-load transfer. Conclusion: A source-constrained evidence synthesis, a code-consistency review, and a practical retrofit-assessment framework are presented. The results support mandatory structural screening before PV installation, with escalation to wind-tunnel, CFD, finite element, or reliability-based assessment where simple prescriptive checks are insufficient.