Abstract
This paper presents results and findings from a forensic investigation to identify the mechanism responsible for premature failure of an unbonded concrete overlay (UBCO). Project 2005-0518 overlaid an existing 10 in (254 mm) jointed, reinforced, dowelled concrete pavement on I-90 in Lake County east of Cleveland, Ohio, with a 9.5 in (241 mm) jointed, plain, dowelled concrete on a 1 in (25 mm) asphalt bondbreaker in 2005. After 6 or 7 years of service, the overlay on I-90 had shown premature cracks and corner breaks. Two likely causes are the cold climate in northern Ohio during construction and the presence of slag aggregate in the concrete mix. Field investigation included visual assessment, distress survey, falling weight deflectometer, MIT scan of dowel bars; and collection of core specimens. Laboratory testing included core dimensions, material mechanical properties, and petrographic analysis. A HIPERPAV simulation was conducted to evaluate early behavior of the Portland cement concrete overlay using actual daily temperature data. Recommendations were made to ODOT to improve performance and prevent similar failures in the future.

This publication has 1 reference indexed in Scilit: