Roger Green
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Interests
Roger Green has a total of 4 co-authors. Here are the top co-authors by number of shared publications:
- Shad M. Sargand
Russ Professor, Dept. of Civil Engineering, Ohio Univ., Stocker Center, Athens, OH 45701
3 shared publications - Issam Khoury
Department of Civil Engineering, Ohio University, Athens, OH
2 shared publications - Junqing Zhu
Southeast Univ
2 shared publications - Anwer K. Al-Jhayyish
Ph.D. Student, Dept. of Civil Engineering, Ohio Univ., Stocker Center, Athens, OH 45701
1 shared publication
Latest Publications
- 5 October 2021
- Published by Springer Nature in International Journal of Pavement Research and Technology
- Vol. 16 (1) , 26-43
Concrete Slab Length and Thickness Optimization for Long-Term Concrete Pavement in Ohio
- 5 October 2021
- Published by Springer Nature in International Journal of Pavement Research and Technology
- Vol. 16 (1) , 26-43
Concrete Slab Length and Thickness Optimization for Long-Term Concrete Pavement in Ohio
- 1 January 2018
- Published by Inderscience Publishers in International Journal of Forensic Engineering
- Vol. 4 (1)
Forensic study of premature failures with unbonded concrete overlay on interstate 70 in Ohio
International publishers of academic, scientific and professional journals since 1979.
- 1 January 2018
- Published by Inderscience Publishers in International Journal of Forensic Engineering
- Vol. 4 (1)
Forensic study of premature failures with unbonded concrete overlay on interstate 70 in Ohio
International publishers of academic, scientific and professional journals since 1979.
- 7 September 2017
- Published by American Society of Civil Engineers (ASCE)
- p. 164-174
Forensic Investigation of Early Failures with Unbonded Concrete Overlay on Interstate 90 in Ohio
This paper presents results and findings from a forensic investigation to identify the mechanism responsible for premature failure of an unbonded concrete overlay (UBCO). Project 2005-0518 overlaid an existing 10 in (254 mm) jointed, reinforced, dowelled concrete pavement on I-90 in Lake County east of Cleveland, Ohio, with a 9.5 in (241 mm) jointed, plain, dowelled concrete on a 1 in (25 mm) asphalt bondbreaker in 2005. After 6 or 7 years of service, the overlay on I-90 had shown premature cracks and corner breaks. Two likely causes are the cold climate in northern Ohio during construction and the presence of slag aggregate in the concrete mix. Field investigation included visual assessment, distress survey, falling weight deflectometer, MIT scan of dowel bars; and collection of core specimens. Laboratory testing included core dimensions, material mechanical properties, and petrographic analysis. A HIPERPAV simulation was conducted to evaluate early behavior of the Portland cement concrete overlay using actual daily temperature data. Recommendations were made to ODOT to improve performance and prevent similar failures in the future.
- 7 September 2017
- Published by American Society of Civil Engineers (ASCE)
- p. 164-174
Forensic Investigation of Early Failures with Unbonded Concrete Overlay on Interstate 90 in Ohio
This paper presents results and findings from a forensic investigation to identify the mechanism responsible for premature failure of an unbonded concrete overlay (UBCO). Project 2005-0518 overlaid an existing 10 in (254 mm) jointed, reinforced, dowelled concrete pavement on I-90 in Lake County east of Cleveland, Ohio, with a 9.5 in (241 mm) jointed, plain, dowelled concrete on a 1 in (25 mm) asphalt bondbreaker in 2005. After 6 or 7 years of service, the overlay on I-90 had shown premature cracks and corner breaks. Two likely causes are the cold climate in northern Ohio during construction and the presence of slag aggregate in the concrete mix. Field investigation included visual assessment, distress survey, falling weight deflectometer, MIT scan of dowel bars; and collection of core specimens. Laboratory testing included core dimensions, material mechanical properties, and petrographic analysis. A HIPERPAV simulation was conducted to evaluate early behavior of the Portland cement concrete overlay using actual daily temperature data. Recommendations were made to ODOT to improve performance and prevent similar failures in the future.