A comprehensive review of flowshop group scheduling literature
Authors:
- Janis S. NeufeldJNJanis S. Neufeld
- Jatinder N.D. GuptaJGJatinder N.D. Gupta
- Udo BuscherUBUdo Buscher
- 1 June 2016
- journal article
- review article
- Published by Elsevier in Computers & Operations Research
- Vol. 70, 56-74
Abstract
No abstract availableKeywords
This publication has 158 references indexed in Scilit:
- Bi-criteria group scheduling in hybrid flowshopsInternational Journal of Production Economics, 2013
- Bi-criteria group scheduling with sequence-dependent setup time in a flow shopJournal of the Operational Research Society, 2013
- Dynamic parts scheduling in multiple job shop cells considering intercell moves and flexible routesComputers & Operations Research, 2012
- A simulated annealing algorithm for the job shop cell scheduling problem with intercellular moves and reentrant partsComputers & Industrial Engineering, 2011
- Genetic algorithms for integrating cell formation with machine layout and schedulingComputers & Industrial Engineering, 2007
- A new lower bound for the flow shop group scheduling problemComputers & Industrial Engineering, 2001
- Heuristics for scheduling in flowshops and flowline-based manufacturing cells to minimize the sum of weighted flowtime and weighted tardiness of jobsComputers & Industrial Engineering, 1999
- Group scheduling problem: Key to flexible manufacturing systemsComputers & Industrial Engineering, 1992
- Combining petrov's heuristic and the CDS heuristic in group scheduling problemsComputers & Industrial Engineering, 1990
- A heuristic algorithm for group schedulingComputers & Industrial Engineering, 1986