Simultaneous scheduling of machines and vehicles in an FMS environment with alternative routing
- 11 August 2010
- journal article
- research article
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 53 (1-4) , 339-351
Abstract
No abstract availableKeywords
This publication has 21 references indexed in Scilit:
- Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robotsEuropean Journal of Operational Research, 2009
- Optimal Scheduling of Material Handling Devices in a PCB Production Line: Problem Formulation and a Polynomial AlgorithmMathematical Problems in Engineering, 2008
- Differential evolution for sequencing and scheduling optimizationJournal of Heuristics, 2006
- Cyclic hoist scheduling in large real-life electroplating linesOR Spectrum, 2006
- A polynomial algorithm for no-wait cyclic hoist scheduling in an extended electroplating lineOperations Research Letters, 2005
- Multi-Degree Cyclic Scheduling of Two Robots in a No-Wait FlowshopIEEE Transactions on Automation Science and Engineering, 2005
- Multicyclic hoist scheduling with constant processing timesIEEE Transactions on Robotics and Automation, 2002
- Dynamic dispatching algorithm for scheduling machines and automated guided vehicles in a flexible manufacturing systemInternational Journal of Production Research, 1992
- Multi-criteria operational control rules in flexible manufacturing systems (FMSs)International Journal of Production Research, 1990
- An application of discrete-event simulation to on-line control and scheduling in flexible manufacturingInternational Journal of Production Research, 1989