Level Scheduling for batched JIT supply
- 1 June 2009
- journal article
- Published by Springer Nature in Flexible Services and Manufacturing Journal
- Vol. 21 (1) , 31-50
Abstract
No abstract availableKeywords
All Related Versions
This publication has 22 references indexed in Scilit:
- Solving symmetric mixed-model multi-level just-in-time scheduling problemsDiscrete Applied Mathematics, 2010
- Mathematical programming modeling of the Response Time Variability ProblemEuropean Journal of Operational Research, 2010
- The product rate variation problem and its relevance in real world mixed-model assembly linesEuropean Journal of Operational Research, 2009
- Level scheduling of mixed-model assembly lines under storage constraintsInternational Journal of Production Research, 2009
- Sequencing mixed-model assembly lines: Survey, classification and model critiqueEuropean Journal of Operational Research, 2009
- Sequencing mixed-model assembly lines to minimize part inventory costOR Spectrum, 2007
- Response time variabilityJournal of Scheduling, 2007
- Analysis of parts requirements variance for a JIT supply chainInternational Journal of Production Research, 2004
- Heuristics and exact algorithms for solving the Monden problemEuropean Journal of Operational Research, 1996
- Note—Sequencing JIT Mixed-Model Assembly LinesManagement Science, 1991