Preliminary Engineering Cost-Estimation Strategy Assessment for Roadway Projects
- 1 April 2013
- journal article
- research article
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 29 (2) , 150-157
Abstract
Preliminary engineering (PE) for a roadway project encompasses two efforts: planning to minimize the physical, social, and human environmental impacts of projects and engineering design to deliver the best alternative. State transportation agencies strive to manage these efforts efficiently, seeking to maximize the utilization of limited funding and workforce productivity. Managers need a feasible PE budget, considering both cost and time, early in project development. The results reported herein will provide engineers and managers with a comparative investigation evaluating different strategies for establishing a PE budget during the preconstruction phase of roadway project development. Cost data were obtained for 188 North Carolina roadway projects built between 1999 and 2009. An analysis of the North Carolina DOT data yielded an overall mean ratio of PE cost to estimated construction cost (the PE cost ratio) of 11.7%. The multiple linear regression model was used to develop prediction models to forecast the PE cost ratio of future roadway projects. It was found that while differing regression strategies could reduce prediction error, the improvement was small. In terms of simplicity, using the historical means applicable for widening projects (13.3%), rehabilitation/resurfacing projects (7.7%), and new location/interchange projects (16.5%) proved advantageous over regression modeling because a project manager would not have to estimate any project-specific values at the earliest stages of project development. The lowest of these historical means was significantly different than the two higher means (7.7% versus 13.3% and 16.5%); however, the difference between the two higher means (13.3% versus 16.5%) was not statistically significant. The study analyses also found a significant correlation between a project’s PE cost ratio and its PE duration, suggesting that further investigation into PE duration of transportation projects is warranted.Keywords
This publication has 10 references indexed in Scilit:
- Statistical Analysis on the Cost and Duration of Public Building ProjectsJournal of Management in Engineering, 2010
- Highway Construction Data Collection and Treatment in Preparation for Statistical Regression AnalysisJournal of Construction Engineering and Management, 2009
- Construction Project Cost Escalation FactorsJournal of Management in Engineering, 2009
- Critical Activities in the Front-End Planning ProcessJournal of Management in Engineering, 2008
- Estimating Performance Time for Construction ProjectsJournal of Management in Engineering, 2007
- System Model for Analyzing Design ProductivityJournal of Management in Engineering, 2006
- Developing and Validating a Tool to Estimate Highway Construction Project CostsTransportation Research Record: Journal of the Transportation Research Board, 2004
- Forecasting Construction Staffing for Transportation AgenciesJournal of Management in Engineering, 2003
- Forecastng Engineering Manpower Requirements for Highway Preconstruction ActivitiesJournal of Management in Engineering, 1995
- The Retransformed Mean after a Fitted Power TransformationJournal of the American Statistical Association, 1986