Minimizing makespan in a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup times
Authors:
- Young-Jin AnYAYoung-Jin An
- Yeong-Dae KimYKYeong-Dae Kim
- Seong-Woo ChoiSCSeong-Woo Choi
- 1 July 2016
- journal article
- Published by Elsevier in Computers & Operations Research
- Vol. 71, 127-136
Abstract
No abstract availableKeywords
This publication has 29 references indexed in Scilit:
- New heuristics for flow shop problem to minimize makespanJournal of the Operational Research Society, 2010
- Minimizing total tardiness on a two-machine re-entrant flowshopEuropean Journal of Operational Research, 2009
- Minimizing makespan on a two-machine re-entrant flowshopJournal of the Operational Research Society, 2007
- Two-machine flow shop scheduling problems with minimal and maximal delays4OR, 2006
- Minimizing total tardiness of orders with reentrant lots in a hybrid flowshopInternational Journal of Production Research, 2005
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey1979
- Two machine flow shop scheduling problems with sequence dependent setup times: A dynamic programming approachNaval Research Logistics Quarterly, 1974
- A GENERAL ALGORITHM FOR THEn × MFLOWSHOP SCHEDULING PROBLEM†International Journal of Production Research, 1968
- Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman ProblemOperations Research, 1964
- Dynamic Programming Treatment of the Travelling Salesman ProblemJournal of the ACM, 1962