Minimizing total tardiness on a two-machine re-entrant flowshop
- 1 December 2009
- journal article
- Published by Elsevier in European Journal of Operational Research
- Vol. 199 (2) , 375-384
Abstract
No abstract availableThis publication has 25 references indexed in Scilit:
- Minimizing makespan on an m-machine re-entrant flowshopComputers & Operations Research, 2008
- Minimizing makespan on a two-machine re-entrant flowshopJournal of the Operational Research Society, 2007
- Minimizing total tardiness of orders with reentrant lots in a hybrid flowshopInternational Journal of Production Research, 2005
- Decomposition methods for reentrant flow shops with sequence-dependent setup timesJournal of Scheduling, 2000
- A heuristic algorithm for two‐machine re‐entrant shop schedulingAnnals of Operations Research, 1999
- Production sequencing problem with reentrant work flows and sequence dependent setup timesComputers & Industrial Engineering, 1997
- A new branch and bound algorithm for minimizing mean tardiness in two-machine flowshopsComputers & Operations Research, 1993
- Scheduling of re‐entrant flow shopsJournal of Operations Management, 1983
- Four simple heuristics for scheduling a flow-shopInternational Journal of Production Research, 1978
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954