Investigating the Effectiveness of Certain Priority Rules on Resource Scheduling of Housing Estate Projects
- 1 July 2009
- journal article
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 135 (7) , 609-613
Abstract
The heuristic method is one of the methods used for the scheduling of resource-constrained projects. This method is commonly used in programming the projects with high number of activities and resources such as construction investments. This paper investigates the effectiveness of three heuristic method priority rules applied in the resource scheduling of ten Turkish housing estate projects which were scheduled according to three preselected priority rules [maximum remaining path length (MRPL), latest finish time (LFT), and minimum slack time (MNSLCK)] in resource-constrained conditions. The performance of each priority rule was evaluated in relation to the duration of the project. The results revealed that MRPL priority reduced the project duration to minimum in six projects, whereas LFT priority yielded the best duration results in three projects and MNSLCK priority in only one project.Keywords
This publication has 21 references indexed in Scilit:
- Resource allocation heuristic in construction simulationConstruction Management and Economics, 2001
- A Heuristic to Maximize the Net Present Value for Resource-Constrained Project-Scheduling ProblemsProject Management Journal, 2001
- Project scheduling with time-varying resource constraintsInternational Journal of Production Research, 2000
- An iterative local constraints based analysis for solving the resource constrained project scheduling problemJournal of Operations Management, 1996
- A local constraint based analysis approach to project scheduling under general resource constraintsEuropean Journal of Operational Research, 1994
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling ProblemManagement Science, 1992
- A new heuristic solution method in resource-constrained project schedulingNaval Research Logistics (NRL), 1991
- Some efficient multi-heuristic procedures for resource-constrained project schedulingEuropean Journal of Operational Research, 1990
- Scheduling a Project to Maximize Its Present Value: A Zero-One Programming ApproachManagement Science, 1977
- A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project SchedulingManagement Science, 1975