Omer Ozkan
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Omer Ozkan has a total of 3 co-authors. Here are the top co-authors by number of shared publications:
- Murat Gunduz
Qatar Univ
3 shared publications - Recep Kanit
Gazi University
3 shared publications Mehmet Sarıbıyık
Department of Civil Engineering, Faculty of Technology, Sakarya University, 54187 Sakarya, Turkey
1 shared publication
Latest Publications
- Open Access
- 16 January 2013
- Published by Vilnius Gediminas Technical University in JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
- Vol. 19 (1) , 113-120
ALKALI SILICA REACTION OF BOF AND BFS WASTES COMBINATION IN CEMENT
This study reports the results of an experimental study conducted to determine composite cements manufactured with the combination of Basic Oxygen Furnace (BOF) Slag and Blast Furnace Slag (BFS). The overall objective of this work is to determine whether a combination of BOF slag and BFS can be used as a cementations material to produce Composite Portland Cement (CPC). Three groups of cement are produced for testing. The first group contains BOF slag, the second group contains BFS and the last group contains the mixture of BOF slag and BFS together. Physical properties and Alkali Silica Reaction (ASR) of these groups are also evaluated in this study. Maximum ASR expansion is observed from the sample of CPC created with BOF slag. On the other hand minimum ASR expansion value is located in the sample of CPC created with BFS only.
- 16 January 2013
- Published by Vilnius Gediminas Technical University in JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
- Vol. 19 (1) , 113-120
Open AccessALKALI SILICA REACTION OF BOF AND BFS WASTES COMBINATION IN CEMENT
This study reports the results of an experimental study conducted to determine composite cements manufactured with the combination of Basic Oxygen Furnace (BOF) Slag and Blast Furnace Slag (BFS). The overall objective of this work is to determine whether a combination of BOF slag and BFS can be used as a cementations material to produce Composite Portland Cement (CPC). Three groups of cement are produced for testing. The first group contains BOF slag, the second group contains BFS and the last group contains the mixture of BOF slag and BFS together. Physical properties and Alkali Silica Reaction (ASR) of these groups are also evaluated in this study. Maximum ASR expansion is observed from the sample of CPC created with BOF slag. On the other hand minimum ASR expansion value is located in the sample of CPC created with BFS only.
- 22 October 2009
- Published by Springer Nature in Artificial Intelligence Review
- Vol. 32 (1-4) , 115-123
Effects of project size and resource constraints on project duration through priority rule-base heuristics
- 22 October 2009
- Published by Springer Nature in Artificial Intelligence Review
- Vol. 32 (1-4) , 115-123
Effects of project size and resource constraints on project duration through priority rule-base heuristics
- 1 July 2009
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 135 (7) , 609-613
Investigating the Effectiveness of Certain Priority Rules on Resource Scheduling of Housing Estate Projects
The heuristic method is one of the methods used for the scheduling of resource-constrained projects. This method is commonly used in programming the projects with high number of activities and resources such as construction investments. This paper investigates the effectiveness of three heuristic method priority rules applied in the resource scheduling of ten Turkish housing estate projects which were scheduled according to three preselected priority rules [maximum remaining path length (MRPL), latest finish time (LFT), and minimum slack time (MNSLCK)] in resource-constrained conditions. The performance of each priority rule was evaluated in relation to the duration of the project. The results revealed that MRPL priority reduced the project duration to minimum in six projects, whereas LFT priority yielded the best duration results in three projects and MNSLCK priority in only one project.
- 1 July 2009
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 135 (7) , 609-613
Investigating the Effectiveness of Certain Priority Rules on Resource Scheduling of Housing Estate Projects
The heuristic method is one of the methods used for the scheduling of resource-constrained projects. This method is commonly used in programming the projects with high number of activities and resources such as construction investments. This paper investigates the effectiveness of three heuristic method priority rules applied in the resource scheduling of ten Turkish housing estate projects which were scheduled according to three preselected priority rules [maximum remaining path length (MRPL), latest finish time (LFT), and minimum slack time (MNSLCK)] in resource-constrained conditions. The performance of each priority rule was evaluated in relation to the duration of the project. The results revealed that MRPL priority reduced the project duration to minimum in six projects, whereas LFT priority yielded the best duration results in three projects and MNSLCK priority in only one project.
- 30 September 2007
- Published by Elsevier in Building and Environment
- Vol. 42 (9) , 3404-3409
Cost assessment of concrete and steel types for office buildings: An exploratory study
- 30 September 2007
- Published by Elsevier in Building and Environment
- Vol. 42 (9) , 3404-3409
Cost assessment of concrete and steel types for office buildings: An exploratory study