Recep Kanit
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Recep Kanit has a total of 7 co-authors. Here are the top co-authors by number of shared publications:
- Murat Gunduz
Qatar Univ
3 shared publications - Omer Ozkan
Department of Civil Engineering, Faculty of Technology, Sakarya University, 54187 Sakarya, Turkey
3 shared publications - Ilker Kalkan
Kirikkale Universitesi
1 shared publication - Mahmud Sami Donduren
Selcuk Univ, Fac Engn, Dept Civil Engn, TR-42130 Konya, Turkey
1 shared publication - Mürsel Erdal
Gazi University
1 shared publication - Osman Gencel
Civil Engineering Department, Faculty of Engineering, Architecture and Design, Bartin University, 74100 Bartin, Turkey
1 shared publication
Latest Publications
- Open Access
- 6 May 2024
- Published by Konya Muhendislik Bilimleri Dergisi in Konya Journal of Engineering Sciences
- Vol. 12 (2) , 561-585
SITE SUPERVISOR SELECTION WITH ANALYTIC HIERARCHY PROCESS (AHP) AND CASE STUDY
The purpose of this study is to develop a methodology for the selection of site supervisors for construction companies carrying out medium-sized building construction works. For this purpose, 3 construction companies were interviewed and the developed method was used for the site supervisor selection of these companies. In this context, 4 candidates who applied to Company A were given scores by the company official according to the selection criteria used in this study and analyses were made with AHP. Candidate 3 ranked first with a priority value of 26.57%. This result was compared with the results of the simultaneous selection by the company using its own method and it was seen that the company selected the same candidate. Same procedure was used for companies B and C. Three different candidates had applied to each company. According to the results, Candidate 3 was selected by Company B with a priority value of 37.52% and Candidate 1 was selected by Company C with a priority value of 35.87%. It was observed that the selection results of both companies carried out simultaneously with their own methods were the same with the candidates found in the study.
- 6 May 2024
- Published by Konya Muhendislik Bilimleri Dergisi in Konya Journal of Engineering Sciences
- Vol. 12 (2) , 561-585
Open AccessSITE SUPERVISOR SELECTION WITH ANALYTIC HIERARCHY PROCESS (AHP) AND CASE STUDY
The purpose of this study is to develop a methodology for the selection of site supervisors for construction companies carrying out medium-sized building construction works. For this purpose, 3 construction companies were interviewed and the developed method was used for the site supervisor selection of these companies. In this context, 4 candidates who applied to Company A were given scores by the company official according to the selection criteria used in this study and analyses were made with AHP. Candidate 3 ranked first with a priority value of 26.57%. This result was compared with the results of the simultaneous selection by the company using its own method and it was seen that the company selected the same candidate. Same procedure was used for companies B and C. Three different candidates had applied to each company. According to the results, Candidate 3 was selected by Company B with a priority value of 37.52% and Candidate 1 was selected by Company C with a priority value of 35.87%. It was observed that the selection results of both companies carried out simultaneously with their own methods were the same with the candidates found in the study.
- 1 August 2021
- Published by University of Slavonski Brod in Tehnicki vjesnik - Technical Gazette
- Vol. 28 (4) , 1362-1370
Scheduling of Construction Projects under Resource-Constrained Conditions with a Specifically Developed Software using Genetic Algorithms
The purpose of this study is to develop a genetic algorithm (GA) based software that can perform resource allocation close to optimum and that can determine the critical path by minimizing the project duration according to the resource...
- 1 August 2021
- Published by University of Slavonski Brod in Tehnicki vjesnik - Technical Gazette
- Vol. 28 (4) , 1362-1370
Scheduling of Construction Projects under Resource-Constrained Conditions with a Specifically Developed Software using Genetic Algorithms
The purpose of this study is to develop a genetic algorithm (GA) based software that can perform resource allocation close to optimum and that can determine the critical path by minimizing the project duration according to the resource...
- 25 April 2016
- Published by Techno-Press in Earthquakes and Structures
- Vol. 10 (4) , 769-788
Influence of special plaster on the out-of-plane behavior of masonry walls
Influence of special plaster on the out-of-plane behavior of masonry walls composite plaster;earthquake loading;plastered infill wall;out-of-plane behavior; The present study aimed at investigating the effect of a special plaster on the out-of-plane behavior of masonry walls. A reference specimen, plastered with conventional plaster, and a specimen plastered with a special plastered were tested under reversed cyclic lateral loading. The specimens were identical in dimensions and material properties. The special plaster contained an additive, which increased the adherence strength of the plaster to the wall. The amount of the additive in the mortar was adjusted based on the preliminary material tests. The influence of the plaster on the wall behavior was evaluated according to the initial cracking load, type of failure, energy absorption capacity (modulus of toughness), and crack pattern of the wall. Despite having limited contribution to the ductility, the special plaster increased the ultimate load capacity of the wall about 25%. The failure mode of the wall with special plaster resembled the plastic failure mechanism of a reinforced concrete slab in the formation of yielding lines along the wall. The deflection at failure and the modulus of toughness of the wall with special plaster were measured to be in order of 60% and 75% of the corresponding values of the reference wall.
- 25 April 2016
- Published by Techno-Press in Earthquakes and Structures
- Vol. 10 (4) , 769-788
Influence of special plaster on the out-of-plane behavior of masonry walls
Influence of special plaster on the out-of-plane behavior of masonry walls composite plaster;earthquake loading;plastered infill wall;out-of-plane behavior; The present study aimed at investigating the effect of a special plaster on the out-of-plane behavior of masonry walls. A reference specimen, plastered with conventional plaster, and a specimen plastered with a special plastered were tested under reversed cyclic lateral loading. The specimens were identical in dimensions and material properties. The special plaster contained an additive, which increased the adherence strength of the plaster to the wall. The amount of the additive in the mortar was adjusted based on the preliminary material tests. The influence of the plaster on the wall behavior was evaluated according to the initial cracking load, type of failure, energy absorption capacity (modulus of toughness), and crack pattern of the wall. Despite having limited contribution to the ductility, the special plaster increased the ultimate load capacity of the wall about 25%. The failure mode of the wall with special plaster resembled the plastic failure mechanism of a reinforced concrete slab in the formation of yielding lines along the wall. The deflection at failure and the modulus of toughness of the wall with special plaster were measured to be in order of 60% and 75% of the corresponding values of the reference wall.
- 22 October 2009
- Published by Springer Nature in Artificial Intelligence Review
- Vol. 32 (1-4) , 115-123
Effects of project size and resource constraints on project duration through priority rule-base heuristics
- 22 October 2009
- Published by Springer Nature in Artificial Intelligence Review
- Vol. 32 (1-4) , 115-123
Effects of project size and resource constraints on project duration through priority rule-base heuristics
- 1 July 2009
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 135 (7) , 609-613
Investigating the Effectiveness of Certain Priority Rules on Resource Scheduling of Housing Estate Projects
The heuristic method is one of the methods used for the scheduling of resource-constrained projects. This method is commonly used in programming the projects with high number of activities and resources such as construction investments. This paper investigates the effectiveness of three heuristic method priority rules applied in the resource scheduling of ten Turkish housing estate projects which were scheduled according to three preselected priority rules [maximum remaining path length (MRPL), latest finish time (LFT), and minimum slack time (MNSLCK)] in resource-constrained conditions. The performance of each priority rule was evaluated in relation to the duration of the project. The results revealed that MRPL priority reduced the project duration to minimum in six projects, whereas LFT priority yielded the best duration results in three projects and MNSLCK priority in only one project.
- 1 July 2009
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 135 (7) , 609-613
Investigating the Effectiveness of Certain Priority Rules on Resource Scheduling of Housing Estate Projects
The heuristic method is one of the methods used for the scheduling of resource-constrained projects. This method is commonly used in programming the projects with high number of activities and resources such as construction investments. This paper investigates the effectiveness of three heuristic method priority rules applied in the resource scheduling of ten Turkish housing estate projects which were scheduled according to three preselected priority rules [maximum remaining path length (MRPL), latest finish time (LFT), and minimum slack time (MNSLCK)] in resource-constrained conditions. The performance of each priority rule was evaluated in relation to the duration of the project. The results revealed that MRPL priority reduced the project duration to minimum in six projects, whereas LFT priority yielded the best duration results in three projects and MNSLCK priority in only one project.
- 30 September 2007
- Published by Elsevier in Building and Environment
- Vol. 42 (9) , 3404-3409
Cost assessment of concrete and steel types for office buildings: An exploratory study
- 30 September 2007
- Published by Elsevier in Building and Environment
- Vol. 42 (9) , 3404-3409
Cost assessment of concrete and steel types for office buildings: An exploratory study