Two-agent scheduling of minimizing total weighted late work and maximum cost
- 1 January 2025
- journal article
- Published by American Institute of Mathematical Sciences (AIMS) in Journal of Industrial and Management Optimization
- Vol. 21 (5) , 3648-3667
Abstract
In this paper we investigate two specific two-agent scheduling scenarios. In the first scenario, one agent's objective function is total weighted late work, the other agent's is any regular max-type cost function, and our goal is to find a feasible schedule which minimizes the first agent's objective function subject to the other agent's not exceeding a threshold. We present a pseudo-polynomial dynamic programming algorithm for the case with $ m $ parallel machines, and also design a fully polynomial time approximation scheme for the single-machine case. In the second scenario, one agent's objective function is a general regular sum-type objective function, the other agent's is still any regular max-type cost function, and our goal to enumerate all Pareto-optimal solutions regarding two agents' objective functions. We present a polynomial algorithm for the single-machine case in which two agents' job sets are nondisjoint and the first agent's jobs are of an equal length, and also show the tightness of our established upper bound on the number of Pareto-optimal solutions.
Keywords
This publication has 28 references indexed in Scilit:
- Single‐machine scheduling with deadlines to minimize the total weighted late workNaval Research Logistics (NRL), 2019
- A note on a two-agent scheduling problem related to the total weighted late workJournal of Combinatorial Optimization, 2018
- Combinatorial Optimization2018
- Two-agent scheduling problems on a single-machine to minimize the total weighted late workJournal of Combinatorial Optimization, 2016
- Approximation schemes for single‐machine scheduling with a fixed maintenance activity to minimize the total amount of late workNaval Research Logistics (NRL), 2016
- Scheduling on parallel identical machines with late work criterion: Offline and online casesJournal of Scheduling, 2015
- A two-agent single-machine scheduling problem with late work criteriaSoft Computing, 2015
- Multiagent Scheduling2014
- Two-agent scheduling on uniform parallel machines with min-max criteriaAnnals of Operations Research, 2012
- The Hungarian method for the assignment problemNaval Research Logistics Quarterly, 1955