Lingfa Lu
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Lingfa Lu has a total of 36 co-authors. Here are the top co-authors by number of shared publications:
Liqi Zhang
College of Information and Management Science , Henan Agricultural University , Zhengzhou, Henan province, P.R. China
12 shared publications- Liqi Zhang
College of Information and Management Science, Henan Agricultural University, Zhengzhou 450002, China
3 shared publications Xue Yu
School of Mathematics and Statistics , Zhengzhou University , Zhengzhou, Henan province, P.R. China
3 shared publicationsJinjiang Yuan
School of Mathematics and Statistics, Zhengzhou University, Zhengzhou, People’s Republic of China
2 shared publications- Jinwen Ou
School of Management, Jinan University, Guangzhou, China
2 shared publications Li-Qi Zhang
2 shared publications
Latest Publications
- Open Access
- 1 January 2026
- Published by American Institute of Mathematical Sciences (AIMS) in Journal of Industrial and Management Optimization
- Vol. 22 (8) , 4138-4150
On-line single-machine scheduling to minimize the weighted makespan under (dis)agreeability conditions
In this paper, we considered the on-line single-machine scheduling with the objective of minimizing the weighted makespan. For the general case, a lower bound of $ 2 $ and two on-line algorithms with the best-possible competitive ratio of 2 were provided in the literature. We considered eight special cases in which all jobs had the agreeability or disagreeability condition on jobs' parameters. For each special case, we provided a lower bound and a corresponding on-line algorithm with the best-possible competitive ratio which matched the given lower bound.- 1 January 2026
- Published by American Institute of Mathematical Sciences (AIMS) in Journal of Industrial and Management Optimization
- Vol. 22 (8) , 4138-4150
Open AccessOn-line single-machine scheduling to minimize the weighted makespan under (dis)agreeability conditions
In this paper, we considered the on-line single-machine scheduling with the objective of minimizing the weighted makespan. For the general case, a lower bound of $ 2 $ and two on-line algorithms with the best-possible competitive ratio of 2 were provided in the literature. We considered eight special cases in which all jobs had the agreeability or disagreeability condition on jobs' parameters. For each special case, we provided a lower bound and a corresponding on-line algorithm with the best-possible competitive ratio which matched the given lower bound. - 11 September 2025
- Published by World Scientific Pub Co Pte Ltd in International Journal of Foundations of Computer Science
- Vol. 37 (05) , 693-707
Single Machine Scheduling with a Restricted Weight-Modifying Activity to Minimize the Weighted Makespan
In this paper, we consider the single machine scheduling problem with a restricted Weight-Modifying Activity (WMA) in which the weight of a job is reduced if it is scheduled after such a WMA. We also assume that the starting time of the WMA must fall in a given time interval [ ]. Our task is to schedule all jobs and the WMA such that the weighted makespan (the maximum weighted completion time) is minimized. We show that a special case with [ ] can be solved in polynomial time and the general problem and two special cases with [ ] or [ ] are binary NP-hard. Furthermore, we propose a pseudo-polynomial dynamic programming algorithm for the above NP-hard problems. Finally, we also provide a fully polynomial time approximation scheme (FPTAS) for the special case with [ ].
- 11 September 2025
- Published by World Scientific Pub Co Pte Ltd in International Journal of Foundations of Computer Science
- Vol. 37 (05) , 693-707
Single Machine Scheduling with a Restricted Weight-Modifying Activity to Minimize the Weighted Makespan
In this paper, we consider the single machine scheduling problem with a restricted Weight-Modifying Activity (WMA) in which the weight of a job is reduced if it is scheduled after such a WMA. We also assume that the starting time of the WMA must fall in a given time interval [ ]. Our task is to schedule all jobs and the WMA such that the weighted makespan (the maximum weighted completion time) is minimized. We show that a special case with [ ] can be solved in polynomial time and the general problem and two special cases with [ ] or [ ] are binary NP-hard. Furthermore, we propose a pseudo-polynomial dynamic programming algorithm for the above NP-hard problems. Finally, we also provide a fully polynomial time approximation scheme (FPTAS) for the special case with [ ].
- 20 March 2025
- Published by World Scientific Pub Co Pte Ltd in Asia-Pacific Journal of Operational Research
On-Line Single Machine Scheduling of Unit Time Jobs with Rejection: Minimizing the Maximum Quadratic Completion Time
In this paper, we consider the on-line single machine scheduling of unit time jobs with rejection. All jobs arrive on-line over a list (one by one). For each arriving job, the on-line algorithm must decide immediately to accept or reject it. The objective is to minimize the maximum quadratic completion time of accepted jobs plus the total rejection cost of rejected jobs. For this problem, we show that 1.7299 is a lower bound on the competitive ratio and present a simple greedy algorithm with the competitive ratio 2. Furthermore, we also provide a modified greedy algorithm with a better competitive ratio [ ].
- 20 March 2025
- Published by World Scientific Pub Co Pte Ltd in Asia-Pacific Journal of Operational Research
On-Line Single Machine Scheduling of Unit Time Jobs with Rejection: Minimizing the Maximum Quadratic Completion Time
In this paper, we consider the on-line single machine scheduling of unit time jobs with rejection. All jobs arrive on-line over a list (one by one). For each arriving job, the on-line algorithm must decide immediately to accept or reject it. The objective is to minimize the maximum quadratic completion time of accepted jobs plus the total rejection cost of rejected jobs. For this problem, we show that 1.7299 is a lower bound on the competitive ratio and present a simple greedy algorithm with the competitive ratio 2. Furthermore, we also provide a modified greedy algorithm with a better competitive ratio [ ].
- 27 February 2025
- Published by Elsevier in Discrete Applied Mathematics
- Vol. 368, 45-51
A note on the online hierarchical scheduling for -norm load balancing- 27 February 2025
- Published by Elsevier in Discrete Applied Mathematics
- Vol. 368, 45-51
A note on the online hierarchical scheduling for -norm load balancing- 1 January 2025
- Published by American Institute of Mathematical Sciences (AIMS) in Journal of Industrial and Management Optimization
- Vol. 21 (5) , 3773-3789
Two-agent scheduling of equal-length jobs on uniform parallel machines
We consider the scheduling of equal-length jobs of two competing agents on uniform parallel machines. We show that, if the criterion of one agent is the total completion time and the criterion of the other agent is the total completion time, the weighted number of tardy jobs or the total tardiness, all the constrained problems are binary NP-hard. When the criterion of each agent is the total weighted completion time, the weighted number of tardy jobs or the total tardiness, we give a unified fully polynomial-time approximation scheme (FPTAS) running in weakly polynomial time for the single-machine GCT-scheduling problems based on the unified dynamic programming algorithm given by Zhao and Yuan [ 40 ].
- 1 January 2025
- Published by American Institute of Mathematical Sciences (AIMS) in Journal of Industrial and Management Optimization
- Vol. 21 (5) , 3773-3789
Two-agent scheduling of equal-length jobs on uniform parallel machines
We consider the scheduling of equal-length jobs of two competing agents on uniform parallel machines. We show that, if the criterion of one agent is the total completion time and the criterion of the other agent is the total completion time, the weighted number of tardy jobs or the total tardiness, all the constrained problems are binary NP-hard. When the criterion of each agent is the total weighted completion time, the weighted number of tardy jobs or the total tardiness, we give a unified fully polynomial-time approximation scheme (FPTAS) running in weakly polynomial time for the single-machine GCT-scheduling problems based on the unified dynamic programming algorithm given by Zhao and Yuan [ 40 ].
- 1 January 2025
- Published by American Institute of Mathematical Sciences (AIMS) in Journal of Industrial and Management Optimization
- Vol. 21 (5) , 3648-3667
Two-agent scheduling of minimizing total weighted late work and maximum cost
In this paper we investigate two specific two-agent scheduling scenarios. In the first scenario, one agent's objective function is total weighted late work, the other agent's is any regular max-type cost function, and our goal is to find a feasible schedule which minimizes the first agent's objective function subject to the other agent's not exceeding a threshold. We present a pseudo-polynomial dynamic programming algorithm for the case with $ m $ parallel machines, and also design a fully polynomial time approximation scheme for the single-machine case. In the second scenario, one agent's objective function is a general regular sum-type objective function, the other agent's is still any regular max-type cost function, and our goal to enumerate all Pareto-optimal solutions regarding two agents' objective functions. We present a polynomial algorithm for the single-machine case in which two agents' job sets are nondisjoint and the first agent's jobs are of an equal length, and also show the tightness of our established upper bound on the number of Pareto-optimal solutions.- 1 January 2025
- Published by American Institute of Mathematical Sciences (AIMS) in Journal of Industrial and Management Optimization
- Vol. 21 (5) , 3648-3667
Two-agent scheduling of minimizing total weighted late work and maximum cost
In this paper we investigate two specific two-agent scheduling scenarios. In the first scenario, one agent's objective function is total weighted late work, the other agent's is any regular max-type cost function, and our goal is to find a feasible schedule which minimizes the first agent's objective function subject to the other agent's not exceeding a threshold. We present a pseudo-polynomial dynamic programming algorithm for the case with $ m $ parallel machines, and also design a fully polynomial time approximation scheme for the single-machine case. In the second scenario, one agent's objective function is a general regular sum-type objective function, the other agent's is still any regular max-type cost function, and our goal to enumerate all Pareto-optimal solutions regarding two agents' objective functions. We present a polynomial algorithm for the single-machine case in which two agents' job sets are nondisjoint and the first agent's jobs are of an equal length, and also show the tightness of our established upper bound on the number of Pareto-optimal solutions.- 4 December 2024
- Published by Springer Nature in Journal of Combinatorial Optimization
- Vol. 49 (1) , 1-17
Online scheduling on an unbounded parallel-batch machine to minimize the weighted makespan
- 4 December 2024
- Published by Springer Nature in Journal of Combinatorial Optimization
- Vol. 49 (1) , 1-17
Online scheduling on an unbounded parallel-batch machine to minimize the weighted makespan
- Open Access
- 1 February 2024
- Published by Walter de Gruyter GmbH in Foundations of Computing and Decision Sciences
- Vol. 49 (1) , 75-94
New Results on Single-Machine Scheduling with Rejection to Minimize the Total Weighted Completion Time
In this paper, we study eight single-machine scheduling problems with rejection and position-dependent parameters. We consider two position-dependent parameters as follows: (1) position-dependent weights and (2) position-dependent processing times. In addition, we also introduce a weight-modifying activity or a rate-modifying activity into our problems. In the first six problems, the task is to minimize the sum of the total weighted completion time of accepted jobs and the total rejection cost of rejected jobs. We show that all six problems can be solved in polynomial time. In the last two problems, the task is to minimize the total weighted completion time of accepted jobs under the constraint that the total rejection cost of rejected jobs can not exceed a given upper bound. We show that these two problems are binary NP-hard and each problem admits an FPTAS.
- 1 February 2024
- Published by Walter de Gruyter GmbH in Foundations of Computing and Decision Sciences
- Vol. 49 (1) , 75-94
Open AccessNew Results on Single-Machine Scheduling with Rejection to Minimize the Total Weighted Completion Time
In this paper, we study eight single-machine scheduling problems with rejection and position-dependent parameters. We consider two position-dependent parameters as follows: (1) position-dependent weights and (2) position-dependent processing times. In addition, we also introduce a weight-modifying activity or a rate-modifying activity into our problems. In the first six problems, the task is to minimize the sum of the total weighted completion time of accepted jobs and the total rejection cost of rejected jobs. We show that all six problems can be solved in polynomial time. In the last two problems, the task is to minimize the total weighted completion time of accepted jobs under the constraint that the total rejection cost of rejected jobs can not exceed a given upper bound. We show that these two problems are binary NP-hard and each problem admits an FPTAS.
- 17 August 2023
- Published by Springer Nature in Journal of Combinatorial Optimization
- Vol. 46 (1) , 1-17
Scheduling problems with rejection to minimize the k-th power of the makespan plus the total rejection cost
- 17 August 2023
- Published by Springer Nature in Journal of Combinatorial Optimization
- Vol. 46 (1) , 1-17
Scheduling problems with rejection to minimize the k-th power of the makespan plus the total rejection cost