Zhichao Geng
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Zhichao Geng has a total of 7 co-authors. Here are the top co-authors by number of shared publications:
- Jinjiang Yuan
School of Mathematics and Statistics, Zhengzhou University, Zhengzhou, People’s Republic of China
2 shared publications Jiayu Liu
Henan College of Transportation, Zhengzhou, People’s Republic of China
1 shared publicationLingfa Lu
School of Mathematics and Statistics, Zhengzhou University, Zhengzhou, People’s Republic of China
1 shared publication- Lingfa Lu
School of Mathematics and Statistics, Zhengzhou University, Zhengzhou, People’s Republic of China
1 shared publication Shuen Guo
School of Mathematics and Statistics, Zhengzhou University, Zhengzhou, Henan 450001, China
1 shared publication- Yuan Zhang
School of Mathematics and Statistics, Zhengzhou University, Zhengzhou 450001, China
1 shared publication
Latest Publications
- 20 February 2025
- Published by Springer Nature in Journal of Combinatorial Optimization
- Vol. 49 (2) , 1-27
Multiple identical serial-batch machines scheduling with release dates and submodular rejection penalties
- 20 February 2025
- Published by Springer Nature in Journal of Combinatorial Optimization
- Vol. 49 (2) , 1-27
Multiple identical serial-batch machines scheduling with release dates and submodular rejection penalties
- 1 January 2025
- Published by American Institute of Mathematical Sciences (AIMS) in Journal of Industrial and Management Optimization
- Vol. 21 (5) , 3648-3667
Two-agent scheduling of minimizing total weighted late work and maximum cost
In this paper we investigate two specific two-agent scheduling scenarios. In the first scenario, one agent's objective function is total weighted late work, the other agent's is any regular max-type cost function, and our goal is to find a feasible schedule which minimizes the first agent's objective function subject to the other agent's not exceeding a threshold. We present a pseudo-polynomial dynamic programming algorithm for the case with $ m $ parallel machines, and also design a fully polynomial time approximation scheme for the single-machine case. In the second scenario, one agent's objective function is a general regular sum-type objective function, the other agent's is still any regular max-type cost function, and our goal to enumerate all Pareto-optimal solutions regarding two agents' objective functions. We present a polynomial algorithm for the single-machine case in which two agents' job sets are nondisjoint and the first agent's jobs are of an equal length, and also show the tightness of our established upper bound on the number of Pareto-optimal solutions.- 1 January 2025
- Published by American Institute of Mathematical Sciences (AIMS) in Journal of Industrial and Management Optimization
- Vol. 21 (5) , 3648-3667
Two-agent scheduling of minimizing total weighted late work and maximum cost
In this paper we investigate two specific two-agent scheduling scenarios. In the first scenario, one agent's objective function is total weighted late work, the other agent's is any regular max-type cost function, and our goal is to find a feasible schedule which minimizes the first agent's objective function subject to the other agent's not exceeding a threshold. We present a pseudo-polynomial dynamic programming algorithm for the case with $ m $ parallel machines, and also design a fully polynomial time approximation scheme for the single-machine case. In the second scenario, one agent's objective function is a general regular sum-type objective function, the other agent's is still any regular max-type cost function, and our goal to enumerate all Pareto-optimal solutions regarding two agents' objective functions. We present a polynomial algorithm for the single-machine case in which two agents' job sets are nondisjoint and the first agent's jobs are of an equal length, and also show the tightness of our established upper bound on the number of Pareto-optimal solutions.- 1 January 2023
- Published by American Institute of Mathematical Sciences (AIMS) in Journal of Industrial and Management Optimization
- Vol. 19 (1) , 456
Single-machine Pareto-scheduling with multiple weighting vectors for minimizing the total weighted late works
In this paper, we study the single-machine Pareto-scheduling of jobs with multiple weighting vectors for minimizing the total weighted late works. Each weighting vector has its corresponding weighted late work. The goal of the problem is to find the Pareto-frontier for the weighted late works of the multiple weighting vectors. When the number of weighting vectors is arbitrary, it is implied in the literature that the problem is unary NP-hard. Then we concentrate on our research under the assumption that the number of weighting vectors is a constant. For this problem, we present a dynamic programming algorithm running in pseudo-polynomial time and a fully polynomial-time approximation scheme (FPTAS).
- 1 January 2023
- Published by American Institute of Mathematical Sciences (AIMS) in Journal of Industrial and Management Optimization
- Vol. 19 (1) , 456
Single-machine Pareto-scheduling with multiple weighting vectors for minimizing the total weighted late works
In this paper, we study the single-machine Pareto-scheduling of jobs with multiple weighting vectors for minimizing the total weighted late works. Each weighting vector has its corresponding weighted late work. The goal of the problem is to find the Pareto-frontier for the weighted late works of the multiple weighting vectors. When the number of weighting vectors is arbitrary, it is implied in the literature that the problem is unary NP-hard. Then we concentrate on our research under the assumption that the number of weighting vectors is a constant. For this problem, we present a dynamic programming algorithm running in pseudo-polynomial time and a fully polynomial-time approximation scheme (FPTAS).
- 23 March 2022
- Published by Springer Nature in Journal of the Operations Research Society of China
- Vol. 11 (3) , 693-706
Single-Machine Preemptive Scheduling with Release Dates Involving the Total Weighted Late Work Criterion
- 23 March 2022
- Published by Springer Nature in Journal of the Operations Research Society of China
- Vol. 11 (3) , 693-706
Single-Machine Preemptive Scheduling with Release Dates Involving the Total Weighted Late Work Criterion
- Open Access
- 20 November 2020
- Published by MDPI AG in Mathematics
- Vol. 8 (11) , 2070
Two-Agent Pareto-Scheduling of Minimizing Total Weighted Completion Time and Total Weighted Late Work
We investigate the Pareto-scheduling problem with two competing agents on a single machine to minimize the total weighted completion time of agent A’s jobs and the total weighted late work of agent B’s jobs, the B-jobs having a common due date. Since this problem is known to be NP-hard, we present two pseudo-polynomial-time exact algorithms to generate the Pareto frontier and an approximation algorithm to generate a -approximate Pareto frontier. In addition, some numerical tests are undertaken to evaluate the effectiveness of our algorithms.- 20 November 2020
- Published by MDPI AG in Mathematics
- Vol. 8 (11) , 2070
Open AccessTwo-Agent Pareto-Scheduling of Minimizing Total Weighted Completion Time and Total Weighted Late Work
We investigate the Pareto-scheduling problem with two competing agents on a single machine to minimize the total weighted completion time of agent A’s jobs and the total weighted late work of agent B’s jobs, the B-jobs having a common due date. Since this problem is known to be NP-hard, we present two pseudo-polynomial-time exact algorithms to generate the Pareto frontier and an approximation algorithm to generate a -approximate Pareto frontier. In addition, some numerical tests are undertaken to evaluate the effectiveness of our algorithms. - 16 July 2020
- Published by Springer Nature in Journal of Combinatorial Optimization
- Vol. 40 (3) , 774-795
Single machine batch scheduling with two non-disjoint agents and splitable jobs
- 16 July 2020
- Published by Springer Nature in Journal of Combinatorial Optimization
- Vol. 40 (3) , 774-795
Single machine batch scheduling with two non-disjoint agents and splitable jobs