Two-stage hybrid flow shop scheduling with preventive maintenance using multi-objective tabu search method
Authors:
- Shijin WangSWShijin Wang
- Ming LiuMLMing Liu
- 15 August 2013
- journal article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 52 (5) , 1495-1508
Abstract
No abstract availableThis publication has 36 references indexed in Scilit:
- Solving two-stage hybrid flow shop using climbing depth-bounded discrepancy searchComputers & Industrial Engineering, 2011
- Simultaneous scheduling of production and maintenance tasks in the job shopInternational Journal of Production Research, 2010
- Integrating Preventive Maintenance Planning and Production Scheduling for a Single MachineIEEE Transactions on Reliability, 2005
- A branch-and-bound algorithm for a two-stage hybrid flowshop scheduling problem minimizing total tardinessInternational Journal of Production Research, 2004
- Balance between genetic search and local search in memetic algorithms for multiobjective permutation flowshop schedulingIEEE Transactions on Evolutionary Computation, 2003
- A fast and elitist multiobjective genetic algorithm: NSGA-IIIEEE Transactions on Evolutionary Computation, 2002
- Multiobjective evolutionary algorithms: a comparative case study and the strength Pareto approachIEEE Transactions on Evolutionary Computation, 1999
- Hybrid flow shop scheduling: A surveyComputers & Industrial Engineering, 1999
- A TABOO SEARCH BASED APPROACH TO FIND THE PARETO OPTIMAL SET IN MULTIPLE OBJECTIVE OPTIMIZATIONEngineering Optimization, 1999
- Schedules for a two-stage hybrid flowshop with parallel machines at the second stageInternational Journal of Production Research, 1991