A Simulation Model of Construction Projects Executed in Random Conditions with the Overlapping Construction Works
Open Access
- 21 May 2021
- journal article
- research article
- Published by MDPI AG in Sustainability
- Vol. 13 (11) , 5795
Abstract
Reducing the duration of construction works requires additional organizational measures, such as selecting construction methods that assure a shorter realization time, engaging additional resources, working overtime, or allowing construction works to be performed simultaneously in the same working units. The simultaneous work of crews may affect the quality of works and the efficiency of construction processes. This article presents a simulation model aimed at assessing the impact of the overlap period on the extension of the working time of the crews and the reduction of a repetitive project’s duration in random conditions. The purpose of simulation studies is to provide construction managers with guidelines when deciding on the dates of starting the sequential technological process lines realized by specialized working crews, for sustainable scheduling and organization of construction projects.Keywords
Funding Information
- Ministerstwo Edukacji i Nauki (FN-10/2021)
This publication has 41 references indexed in Scilit:
- Application of Game Theory against Nature in Supporting Bid Pricing in ConstructionSymmetry, 2021
- Generalized Resource-Constrained Critical Path Method to Improve Sustainability in Construction Project SchedulingSustainability, 2020
- Workspace planning in construction: non-deterministic factorsAutomation in Construction, 2020
- New Approach to Improve General Contractor Crew’s Work Continuity in Repetitive Construction ProjectsJournal of Construction Engineering and Management, 2020
- Minimizing the Duration of Repetitive Construction Processes with Work Continuity ConstraintsComputation, 2019
- Risk of Delays in Implementation of Building Investment in Urban Conditions in the Aspect of Historical Background of its LocationIOP Conference Series: Materials Science and Engineering, 2019
- Scheduling Repetitive Construction Processes Using the Learning-Forgetting TheoryIOP Conference Series: Materials Science and Engineering, 2019
- Modeling of the harmonization method for executing a multi-unit construction projectOpen Engineering, 2019
- Integrating Sustainability into Construction Engineering Projects: Perspective of Sustainable Project PlanningSustainability, 2018
- Priority Scheduling in the Planning of Multiple-Structure Construction ProjectsArchives of Civil Engineering, 2017