Robust scheduling in a two-machine re-entrant flow shop to minimise the value-at-risk of the makespan: branch-and-bound and heuristic algorithms based on Markovian activity networks and phase-type distributions
- 2 November 2023
- journal article
- research article
- Published by Springer Nature in Annals of Operations Research
- Vol. 338 (1) , 741-764
Abstract
No abstract availableKeywords
This publication has 54 references indexed in Scilit:
- Heuristic solution methods for the stochastic flow shop problemEuropean Journal of Operational Research, 2012
- Robust production control against propagation of disruptionsCIRP Annals, 2011
- New multi-objective method to solve reentrant hybrid flow shop scheduling problemEuropean Journal of Operational Research, 2010
- Minimizing makespan on an m-machine re-entrant flowshopComputers & Operations Research, 2008
- Minimizing makespan on a two-machine re-entrant flowshopJournal of the Operational Research Society, 2007
- Minimizing makespan in re-entrant permutation flow-shopsJournal of the Operational Research Society, 2003
- Robust scheduling of a two-machine flow shop with uncertain processing timesIIE Transactions, 2000
- A review of the static stochastic flow-shop scheduling problemJournal of Decision Systems, 2000
- A heuristic algorithm for the m-machine, n-job flow-shop sequencing problemOmega, 1983
- Scheduling jobs, with exponentially distributed processing times, on two machines of a flow shopNaval Research Logistics Quarterly, 1973