Cycle time analysis of dual-arm cluster tools for wafer fabrication processes with multiple wafer revisiting times
Authors:
- Yan QiaoYQYan Qiao
- NaiQi WuNWNaiQi Wu
- QingHua ZhuQZQingHua Zhu
- LiPing BaiLBLiPing Bai
- 1 January 2015
- journal article
- Published by Elsevier in Computers & Operations Research
- Vol. 53, 252-260
Abstract
No abstract availableThis publication has 40 references indexed in Scilit:
- Cycle time analysis in reentrant robotic cells with swap abilityInternational Journal of Production Research, 2012
- Scheduling multiple robots in a no-wait re-entrant robotic flowshopInternational Journal of Production Economics, 2012
- Optimal Scheduling of Multicluster Tools With Constant Robot Moving Times, Part I: Two-Cluster AnalysisIEEE Transactions on Automation Science and Engineering, 2010
- Multicluster tools scheduling: an integrated event graph and network model approachIEEE Transactions on Semiconductor Manufacturing, 2006
- Cyclic hoist scheduling in large real-life electroplating linesOR Spectrum, 2006
- Scheduling Single-Armed Cluster Tools With Reentrant Wafer FlowsIEEE Transactions on Semiconductor Manufacturing, 2006
- A polynomial algorithm for no-wait cyclic hoist scheduling in an extended electroplating lineOperations Research Letters, 2005
- Schedule stabilization and robust timing control for time-constrained cluster tools2004
- Scheduling analysis of time-constrained dual-armed cluster toolsIEEE Transactions on Semiconductor Manufacturing, 2003
- A strongly polynomial algorithm for no-wait cyclic robotic flowshop schedulingOperations Research Letters, 1997