Alternative Contracting Methods: Modeling and Assessing the Effects of Contract Type on Time-Cost-Change Performance
- 1 January 2021
- journal article
- research article
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 37 (1) , 04020096
Abstract
Although the use of alternative contracting methods (ACMs) has become increasingly common, little is known about their effects on a project’s time-cost-change performance. This study draws from 2,572 project datapoints, addressing this research gap by plotting, analyzing, and validating high confidence performance indicators. The effects of different ACMs on project time, cost, and change performance were all evaluated and time-cost performance prediction models developed and tested. The results reveal that the use of incentives/disincentives is preferable for reducing the duration of a project. Lump-sum contracting is an effective choice for onbudget project delivery, while cost-plus-time bidding is significantly less effective than incentives/disincentives and no-excuse bonus contracting. Notably, the results also convey that ACMs with large project sizes are more prone to schedule delays and cost overruns. The robustness of the predictive models was verified by a predicted error sum of squares validation. The findings of this study will help state transportation agencies make better-informed decisions by providing foresight regarding the pros and cons of ACMs for aspects of project time-cost-change performance. The use of the predictive models will also assist agencies in justifying the probable time-cost impact of project change orders, enabling them to conduct more reliable risk assessments and develop more realistic contingency plans in the project scoping phase.Keywords
This publication has 33 references indexed in Scilit:
- Decision support model for incentives/disincentives time–cost tradeoffAutomation in Construction, 2012
- Shifting Urban Priorities?Transportation Research Record: Journal of the Transportation Research Board, 2008
- Streamlined Strategies for Faster, Less Traffic-Disruptive Highway Rehabilitation in Urban NetworksTransportation Research Record: Journal of the Transportation Research Board, 2008
- National and International Freight Transport Models: An Overview and Ideas for Future DevelopmentTransport Reviews, 2004
- How common and how large are cost overruns in transport infrastructure projects?Transport Reviews, 2003
- The Johnson System: Selection and Parameter EstimationTechnometrics, 1980
- Extension of Multiple Range Tests to Group Means with Unequal Numbers of ReplicationsBiometrics, 1956
- A Multiple Comparison Procedure for Comparing Several Treatments with a ControlJournal of the American Statistical Association, 1955
- Use of Ranks in One-Criterion Variance AnalysisJournal of the American Statistical Association, 1952
- Systems of Frequency Curves Generated by Methods of TranslationBiometrika, 1949