Status of the diagnostics development for the first operation phase of the stellarator Wendelstein 7-X
- 18 July 2014
- journal article
- conference paper
- Published by AIP Publishing in Review of Scientific Instruments
- Vol. 85 (11) , 11D818
Abstract
An overview of the diagnostics which are essential for the first operational phase of Wendelstein 7-X and the set of diagnostics expected to be ready for operation at this time are presented. The ongoing investigations of how to cope with high levels of stray Electron Cyclotron Resonance Heating (ECRH) radiation in the ultraviolet (UV)/visible/infrared (IR) optical diagnostics are described.Keywords
This publication has 10 references indexed in Scilit:
- Transition From Construction to Operation Phase of the Wendelstein 7-X StellaratorIEEE Transactions on Plasma Science, 2014
- Towards assembly completion and preparation of experimental campaigns of Wendelstein 7-X in the perspective of a path to a stellarator fusion power plantFusion Engineering and Design, 2013
- Diagnostics development for quasi-steady-state operation of the Wendelstein 7-X stellarator (invited)Review of Scientific Instruments, 2012
- Neutron diagnostics at the Wendelstein 7-X stellaratorJournal of Instrumentation, 2012
- Diagnostics design for steady-state operation of the Wendelstein 7-X stellaratorReview of Scientific Instruments, 2010
- Design criteria of the bolometer diagnostic for steady-state operation of the W7-X stellaratorReview of Scientific Instruments, 2010
- Infrared transparent carbon nanotube thin filmsApplied Physics Letters, 2009
- High efficiency extreme ultraviolet overview spectrometer: Construction and laboratory testingReview of Scientific Instruments, 2006
- Miscellaneous data on materials for millimetre and submillimetre opticsInternational Journal of Infrared and Millimeter Waves, 1996
- Properties of tin doped indium oxide thin films prepared by magnetron sputteringJournal of Applied Physics, 1983