Contingencies like a generator or an interconnection trip lead to rapid decline in system frequency. In absence of sufficient reserve, under frequency load shedding is deployed in such cases to arrest the frequency excursion. In addition, frequency dependent loads such as induction and synchronous motors also exert significant influence on the frequency response of the system. Since the power consumed by these loads is proportional to their rotational speed, the total load of the system is curtailed as the frequency declines after the contingency. As such, frequency dependence of the loads, which is typically defined as load frequency relief, helps in restoring the power balance. Frequency stability of a system is also influenced by its total load level. This paper investigates the effects of load levels and load frequency relief on power system frequency stability following a major disturbance. A tool is proposed to determine the minimum point of the frequency excursion curve, commonly known as frequency nadir, for any load level and load frequency relief. The proposed tool is applied to a 7-bus, 3-generator system and it is found that the tool can successfully predict frequency nadir.