Effects of Flexible Notice-to-Proceed Provisions on the Performance of Transportation Infrastructure Projects
- 6 January 2022
- journal article
- research article
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
- Vol. 2676 (4) , 790-800
Abstract
When alternative contracting techniques are considered, one innovative approach for assuring the performance of a transportation infrastructure project is offering contractors flexibility about when they start the project. Although such flexible notice-to-proceed (NTP) provisions are becoming more common, quantitative studies examining their impact on project performance are nonexistent. This study investigates the likely effects of flexible NTP provisions on competitive bidding, bid prices, and contract time. A dataset gathered from the North Carolina Department of Transportation, United States, was carefully stratified by type and size of project to allow for unbiased analysis. The results from the hypothesis testing revealed that projects with flexible NTP provisions were more competitive in relation to bidding. The results also indicated a positive correlation between the length of flexible time window and award growth. This study is the first of its kind and will help state transportation agencies make better-informed decisions by providing a point of reference when adopting NTP provisions for alternative contracting projects.Keywords
This publication has 10 references indexed in Scilit:
- Holistic Performance Evaluation of Highway Design-Build ProjectsJournal of Management in Engineering, 2020
- Examination of Project Duration, Project Intensity, and Timing of Cost Certainty in Highway Project Delivery MethodsJournal of Management in Engineering, 2019
- Performance of Highway Design-Bid-Build and Design-Build Projects by Work TypesJournal of Construction Engineering and Management, 2018
- Implementing Best-Value Procurement for Design–Bid–Build Highway ProjectsTransportation Research Record: Journal of the Transportation Research Board, 2016
- Time-Related Incentive and Disincentive Provisions in Highway Construction Contracts2010
- Selection and Evaluation of Alternative Contracting Methods to Accelerate Project Completion2008
- Setting Maximum Incentive for Incentive/Disincentive Contracts for Highway ProjectsJournal of Construction Engineering and Management, 2004
- Lane Rental—Innovative Way to Reduce Road Construction TimeJournal of Construction Engineering and Management, 1998
- Incentive/Disincentive Guidelines for Highway Construction ContractsJournal of Construction Engineering and Management, 1995
- An Analysis of Competitive Bidding on BART ContractsThe Journal of Business, 1977