Progress of ITER Central Solenoid Assembly
- 29 January 2024
- journal article
- research article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 34 (5) , 1-6
Abstract
This paper describes critical assembly process qualifications, acceptance criteria, and worker training of ITER Central Solenoid Assembly. Coaxial joint assembly was qualified and trained to achieve resistance below 4.1 nOhm. The electrical insulation process was qualified to 30 kV and 15 kV under Paschen conditions. Shear pin drilling and installation within specified tolerance was achieved. Modules were lifted and positioned within 2 mm. The lessons learned, and subsequent work execution onsite within the IO facility assembly hall are also presented.Keywords
This publication has 9 references indexed in Scilit:
- Selected Topics of Technical Challenges of the ITER Central SolenoidIEEE Transactions on Applied Superconductivity, 2024
- ITER Magnets Superconducting Joints Prototype Tests in the CEA SELFIE Facility for Operators QualificationIEEE Transactions on Applied Superconductivity, 2024
- Development of Coax Compacted Joint Assembly Process for the ITER Central SolenoidIEEE Transactions on Applied Superconductivity, 2021
- Preparation of the ITER Central Solenoid AssemblyIEEE Transactions on Applied Superconductivity, 2020
- Design and Analysis of the US ITER Central Solenoid Module Lifting FixtureFusion Science and Technology, 2019
- Manufacture of the ITER Central Solenoid ComponentsIEEE Transactions on Applied Superconductivity, 2017
- ITER Central Solenoid design2013
- The ITER Magnets: Design and Construction StatusIEEE Transactions on Applied Superconductivity, 2011
- ITER Central Solenoid support structure analysis2011