  • Development of the ITER Magnet Protection in the Case of Paschen Condition Detection

    by C. Hoa, B. Boussier, R. Fan, J. Han, S. Huygen, J.-Y. Journeaux, M. Liao, R. Lopez Villanueva, N. Mitchell, I. Nunes, et al.

    The ITER superconducting magnet electrical insulation is designed and manufactured to be Paschen proof. The ITER cryostat and the feeder vacuums are also designed to provide a level of vacuum where Paschen conditions should not occur in case of insulation failure. The high voltage insulation failure coincident with degraded vacuum has been identified as a risk with major consequences. The level of magnetic energy stored in the superconducting coils, up to a maximum value of about 50 GJ, could result in electrical arcs leading to severe damages on the magnet system. The present paper focus on the operation, control and protection to mitigate the risk of Paschen discharge: vacuum monitoring, detection and protective actions are discussed: what the baseline strategy is and what should be further developed and improved for the ITER magnet system based on the return of experience of large scale superconducting magnet tests.


  • Acceptance Test of Pre-Compression Rings for ITER Magnet System

    by Yuri Ilyin, Neil Mitchell, Angela Hernandez Sanchez, Eva Boter, Luigi Semeraro, Alessandro Bonito-Oliva, Rémi Besson, Luc Torres, Nicolas Balut, Catherine Herve, et al.

    In the ITER machine, two sets of three pre-compression rings will be installed at the top and bottom of the 18 toroidal field coil structures. The rings will tightly hold the coils with a radial force of 4,800 t per coil against the operating forces. Four other pre-compression rings will serve as spares. Weighing 3.4 t each, with an inner diameter of 5 m, the rings made of pultruded S-fiberglass composite are possibly the largest and most highly stressed composite structures to be designed for a cryogenic environment. All 10 rings have been delivered to ITER and tested at the ITER pre-compression ring facility at a double nominal stress level. The facility is used to measure the stress at rupture of sub-size rings and for acceptance tests of the full size rings. These tests are supplemented by the stress relaxation test at nominal load on a ring equipped with acoustic sensors, to confirm that the creep performances are also adequate. The paper discuss the design of the rings, the manufacturing route, and the test results including the analysis of the acoustic emission signals.


  • Selected Topics of Technical Challenges of the ITER Central Solenoid

    by Y. Miyoshi, A. Bruton, C. Cormany, M. Liao, N. Mitchell, T. Schild, R. Barden, D. Everitt, K. Freudenberg, V. Guilliams, et al.

    Central Solenoid (CS) components have an abundance of technical challenges ranging from material science to component interfacing. In manufacturing, a CS module is subjected to stringent high voltage insulation strength tests at multiple occasions. The engineering challenge is where a multitude of quench detection wires need to exit the bulk insulation and the materials boundary or compatibility become an issue. In assembly, each CS module terminals is jumped to its respective feeder line via an extension lead that is manufactured with interfacing constraints with the module terminal vector as well as the feeder terminal mating surface. Another critical aspect is the clearance available in assembly with other surrounding tokamak components. A summary of the issues found in manufacturing of large scale structural components is also given.


  • Completion and Factory Acceptance Test of the ITER PF1 Coil

    by Yuri Ilyin, Fabrice Simon, Andrey Mednikov, Igor Rodin, Alexandr Ustinov, Vladimir Vadatursky, Andrey Bursikov, Dmitrii Stepanov, Egor Marushin, Qing Hua, et al.

    In the International Tokamak Experimental Reactor (ITER), six Poloidal Field (PF) ring coils are employed to initiate, stabilize, and shape the plasma. The Russian Domestic Agency for ITER is responsible for the supply of the PF1 Coil. The manufacturing process, which includes design, tooling procurement, building preparation, and component qualification, spanned over 10 years and concluded in 2022. This article primarily focuses on the final assembly activities following the vacuum pressure impregnation of the coil's winding pack, with specific emphasis on risk mitigation measures to prevent the failure of the coil's electrical insulation and instrumentation. Further, the factory acceptance tests of the completed coil and their outcomes are described and discussed in comparison with the established requirements. These tests include measuring the electrical insulation performance under partial vacuum conditions, checking for leak tightness of the pressurized hydraulic circuit, and conducting dimensional inspections of the coil's interfaces critical for integration into the ITER tokamak. Finally, the article addresses the transportation of the coil and the upcoming cold test to be conducted at the ITER site.


  • Delivered Poloidal Field Coils to ITER Fusion Tokamak Facility: Status, Factory Acceptance Test Results and Overview of the Undergone Electrical Tests in Manufacturing Processes

    by M. Martinez Lopez, A. Bonito-Oliva, P. Carvas, A. Loizaga, G. Romano, P. Aprili, E. Vizio, D. Rossi, R. Batista, P. Readman, et al.

    Fusion for Energy (F4E), the European Domestic Agency for the International Thermonuclear Experimental Reactor (ITER) is responsible for the manufacturing, test and delivery of 5 out of 6 Poloidal Field Coils of ITER. F4E has currently delivered 4 coils: PF2, PF4, PF5 and PF6, the last two are installed in the Tokamak pit in temporary positions while PF2 and PF4 are stored awaiting the Tokamak torus completion. At the PF coils manufacturing production site in Cadarache, France, few meters away from the ITER Tokamak assembly building, F4E is currently finalizing the manufacturing and testing of the largest coil: PF3, with 24 m diameter and a weight of 384 t, approaching to the end of an endeavor that started back in 2013. This article describes all electrical tests the PF coils underwent to meet the ITER technical requirements during their lengthy manufacturing process, and which lasted several years. Tests performed at key points of the manufacturing process avoided discovering non-conformities at later stages that could otherwise become critical for the project accomplition. The main electrical tests consisted of high voltage DC/AC, partial discharge tests, and local and global Paschen tests. The experimental setups and procedures are presented and discussed in more detail. We also summarize the acceptance test results for the finalized coils i.e., 80 K forced flow pressure drop testing, leak tightness in vacuum before, during and after the thermal cycle to 80 K.


  • TF Coil Displacement Distortion FE Analysis Simulating Non-Constant Assembly Gap Between Wedging Interfaces of TF Coils

    by Yong Feng, Neil Mitchell, Cornelis Jong, Gabriele D'AMico, Alexander Vostner, Min Liao

    The early plasma ramp-up on ITER will be performed under a limiter configuration. In this early plasma phase, the possible misalignments between the plasma configuration and the ITER first wall panels (FWP) in the inboard regions can lead to an increase of the power flux density acting on the FWPs. This situation is considered as a safety risk for the machine: a significant increase of the flux density may exceed the design limits of the FWPs and damage the inboard modules. Therefore, in order to avoid an excessive increase of the power flux density on the FWPs, one of the main goals of the tokamak assembly strategy is to achieve the most symmetric magnetic field structure and the best blanket alignment. The symmetric toroidal field (TF) coils structure is key for achieving the symmetric magnetic field. In the ideal case, the assembly gap dimensions in the wedging interfaces of every two adjacent TF coils are designed as an uniform value, i.e., 2 mm. However, in reality the assembly gap tolerances can be generated during the manufacturing and assembly process of the TF coils, which can lead to the asymmetric TF coils structure configuration after energization. The purpose of this paper is to investigate and discuss the consequent displacement distortions of the TF coils by simulating the non-constant assembly gap distributions in a 360° mechanical FE model of the ITER TF system.


  • Progress of ITER Central Solenoid Assembly

    by C. Cormany, A. Bruton, M. Liao, N. Mitchell, Y. Miyoshi, T. Schild, D. Everitt, K. Freudenberg, V. Guilliams, A. Istomin, et al.

    This paper describes critical assembly process qualifications, acceptance criteria, and worker training of ITER Central Solenoid Assembly. Coaxial joint assembly was qualified and trained to achieve resistance below 4.1 nOhm. The electrical insulation process was qualified to 30 kV and 15 kV under Paschen conditions. Shear pin drilling and installation within specified tolerance was achieved. Modules were lifted and positioned within 2 mm. The lessons learned, and subsequent work execution onsite within the IO facility assembly hall are also presented.


  • Installation Progress of the Central Solenoid (CS) on ITER Site

    by Tao Jiang, Tong Che, Lianli Shao, Haiyu Zhu, Peng Wang, Xiaofeng Ma, Jun Zhou, Thierry Schild, Carl Cormany, Yasuyuki Miyoshi, et al.

    The installation process of the Central Solenoid (CS) on the ITER site is a complex and multi-step process that involves careful planning, engineering, and construction. The CS occupies the bore of the ITER tokomak and provides a dynamic magnetic field which inductively drives the plasma current. The CS assembly consists of a stack of six modules each electrically connected to bus bars and mechanically bonded with an external structure as shown in (Fig. 1 ). Each module is connected to its bus bar with a pair of coaxial joints. This document will provide a brief overview of the recent installation progress, and then will focus on several critical steps of one module stacking, such as lifting and joint assembly.


  • Environmental Stress Cracking of Thermoplastic Polyimide Insulated Wires

    by R. Piccin, J. S. Rigaud, I. A. Santillana, K. E. Buchanan, D. Ternova, N. Mitchell, M. Liao, C. Luongo

    Polyimide is often the first choice to insulate instrumentation and magnet wires working under demanding environmental and operating conditions since it shows good mechanical properties at low temperatures and high radiation resistance. Nevertheless, we have recently discovered that thermoplastic polyimide (TPI) insulated wires may suffer an accelerated brittle failure from a combination of environmental and mechanical stress, summarized as environmental stress cracking (ESC). Amorphous plastics immersed in an aggressive liquid and under a certain stress level, may develop crazes below the stress that would normally cause crazing in air. Certain alkaline hardeners can be considered aggressive toward polyimide. This study reports the causes and effects of environmental stress cracking of thermoplastic polyimide insulated wires subjected to resin systems commonly used in superconducting magnet technologies, and tentatively identifies those that seem more benign. We suspect that ESC can be behind some of the failures (Paschen breakdown under test voltages or even in operation) seen in some superconducting coils.


  • Mitigation Plans for Insulation Failures and Arcing in the ITER Magnets

    by Min Liao, Neil Mitchell, Roland Piccin, Cesar Luongo, Yulong Ye, Nicolas Clayton, Thierry Schild, Christine Hoa

    The ITER magnet system contains 50 GJ of energy in 3 main coil sets and feeders. Lesson learned from arc incidents in JT-60SA and CS module 3 cold test show the consequences of insulation failure. There are three major insulation challenges in ITER magnets: bulk insulation in the coil, ground insulation and high voltage wiring. The most issues are found at the vacuum interface with Paschen breakdown in poor vacuum leading to arcs from ground insulation and the risk of high voltage wire insulation cracking. High voltage arcing can potentially be a safety concern in ITER due to arcing to the vacuum vessel. The mitigation focuses in 3 main areas: Prediction: Simulation of arc development within the cryostat to assess potential damage and if necessary implementation of extra protection; Prevention: Minimisation of weak areas, notably high voltage (HV) wire exits from ground insulation. As a result of failure root cause analysis, chemical corrosion between coil resin and wire insulation is a concern being investigated, with if necessary quick “universal” solutions to repair or reinforce predicted weak areas. Vacuum monitoring in the cryostat is being improved to identify potential Paschen conditions in advance; Early Detection: Implementation of regular intermediate global electrical tests under controlled Paschen conditions at low temperature to detect breakdown with high sensitivity of leakage currents (∼10 µA) which may in turn require room temperature water cooled busbars to be easily isolated. At least initially, in-cryostat cameras or other spark detection methods are needed to localise failures and repair methods need to be pre-qualified.